Loading...
HomeMy WebLinkAboutARB201900015 Checklist 2019-06-24ARB 2019-15: Bank of America Rio Rd., landscape and lighting CoA and LOR RESUBMITTAL REVIEW CHECKLIST 6/24/ 19 HNM Previous ARB and LOR Comments 6-24-19 Review 1. Resubmit revised sheets A09.11; E2.01; E3.01; C1.10; and C1.20. Eliminate all others OK: The resubmittal includes only C1.10, C1.20, as redundancies. Provide the Pole Base Detail (detail 1) and the luminaire schedule A09.11, E2.01, and E3.01. E2.01 includes the from E0.01 on E2.01. Orient the plans so that north is at the top of the pages of E2.01 luminaire schedule and pole detail. The plans on E2.01 and E3.01. Provide the public street names on E2.01 and E3.01. and E3.01 have been reoriented and the public street names have been added. 2. Ensure that all of the current and proposed wall -mounted lights are drawn on the OK, the revised architectural elevations on A09.11 are elevations visible from the Entrance Corridor street (i.e., the south, west, and east accurate. elevations. The north elevation is not visible from Rio Road and therefore does not require ARB review). 3. Remove light models R1, R2, and R3 from the lighting plan on E2.01 if they are to be OK, omitted from plans on E2.01 and E3.01. removed and not replaced. 4. The site has lost three crapemyrtles and thus three medium shade trees. The amount of OK, 3 crapemyrtles added across the site. shade canopy is under compliance. Provide additional shade trees across the site. 5. There are two shrubs on the east property line that are identified as hemlocks but do OK, species identified on C1.10 as ILCR and ILCO not appear to be that species. Verify theirspecies. and small landscape scheduled added to C1.10. 6. There remains a discrepancy between the parking on the site as it exists today and OK, parking rectified on revised plan and with notes on what was approved. Where four parking spaces are illustrated in the northeast corner C 1.10. It reflects what is one the ground today of the site, there are three on the ground; where five spaces are illustrated on the following LOR #2 in 2015. western property line, there are seven on the ground. Reflect the Existing Conditions sheet C1.10 to accurately reflect all current landscaping and sitefeatures. 7. Revise sheet C1.10 to show the proposed demolition of any existing freestanding OK, note added to C1.10 that the 3 shrubs on east side lights or landscaping. Differentiate between what does not exist on the ground today of parking are to be removed. from what is proposed to be removed in future. 8. The kelvins (or color temperatures) or light models HE and HE2 are not provided in OK, luminaire schedules on E2.01 and E3.01 revised to the catalog number within the luminaire schedules. All other light models listed in the provide light color temperature (40k) for models HE luminaire schedules are 40K. Provide the color temperatures for these two models in and HE2. revised luminaire schedules. 9. Note that light levels in excess of 20 footcandles is generally not accepted in the OK, max fc value revised to 19.6 Entrance Corridor. Reduce the footcandle values in excess of 20 fc under the drive - through canopy. 10. There is a discrepancy between the quantity of HE listed in the luminaire schedules OK, the discrepancies have been rectified (HE1 is (6) and those shown on the plans on E2.01 and E3.01 (5); there is a discrepancy listed as 5, HK1 listed as two) and all of the lights between the quantity of HK1 listed in the luminaire schedules (1) and those shown on shown on the plan are correctly accounted for in the the plans on E2.01 and E3.01 (2). Rectify. luminaire schedules on E2.01 and E3.01.