The final site development LOR 1 plan for The Center at Belvedere has been reviewed by Engineering.
1. VSMP Plan amendment (WP0201800029 amendment 1) must be approved before this LOR can
be approved. Rev. 1: Comment still valid. WPO is close to approval.
2. Please provide a typical detail for the new wall. Will there be tiebacks, etc. It is very close to some
underground utilities. Rev. 1: Comment addressed.
3. Drainage divides must be provided to go along with the storm calculations. Rev. 1: It appears the
calculations for pipe 155 and 153 are missing. This is the same remaining comment for the
WPO.