HomeMy WebLinkAboutARB201900071 Application 2019-06-21ot"',
Application and Checklist for Sign Permit
Part A: Applicant and Parcel Information
Project Name: The Chiropractic Office Address: 1911 Commonwealth Dr, Charlottesville VA
Tax map and parcel(s): 061 WO-03-00-02 1 AO z.ning: C1 Commercial
Contact Person (Who should we call/write concerning this project?): Kristyn ,tones
Address 2165 Seminole Tr City Charlottesville State VA Zip 22901
Daytime Phone 4349747900 x100 Fax # (_j 4349746898 E-mail kjones@htsva.eom
Owner of Record: LINDA BLAKE GAYLE LLC
Address 5208 OCEAN FRONT AVE City VIRGINIA BEACH State VA Zip 5208
Daytime Phone L ) (434)-242-0057 Fax # E-mail jansellsva@gmaii.com
Contractor Name/Business Name: Hightech Signs
Address 2165 Seminole Trail City Charlottesville State VA zip 22901
Daytime Phone () 4349747900 x100 Fax # C__) 4349746898 E-mail kjones@htsva.com
Part B: Determining application requirements and fees
1.
Sign Permit — Please indicate which sign type you are applying for:
❑
Freestanding or Monument Sign:
$91.64
❑
if a footing is required, an additional fee is required:
$32.64
0
Wall Sign (Including property, awning, fuel pump canopy signs):
$91.64
®
Sign Refacing:
$59.00
Electrical Permit — FVt11 the sign be illuminated?
❑
Yes (Illuminated .signs require an electrical permit and an electrical schematic.)
$48.96
FO
No
$ 0.00
3.
ARB Review — Will the permanent sign(s) be constructed in an Entrance Corridor?
(See the Entrance Corridor map in the Sign Permit Application packet for a list of Entrance Corridors)
❑
Yes (This sign will be constructed in an Entrance Corridor and it does not meet the conditions of a
$129.0(
Comprehensive Sign Review. See ARB requirements next pages)
Yes ('Phis sign will be constructed in an Entrance Corridor and it does meet the conditions of a
Waive Fee
Comprehensive Sign Review. See ARB requirements next pages)
NO (`This sign will not be constructed in an Entrance Corridor)
$ 0.00
FEE TOTAL (Please add all the amounts checkedinsections I — 3):
$91.64
�
FOR OFFICE USE ONLY BP#(: J —'6ke� ARB# �'� c,
rcr—..
Fee Amount $ Date Paid By who? Receipt # Check #
By
County of Albemarle Department of Community Development
401 McIntire Road Charlottesville, vA 22902 voice: (434) 296-5832 Fag: (434) 0 24126
I1/]/2015 Page 1 of
Part C: Submittal Items Required
Note: Submittal packages must contain 4 collated copies of all information unless otherwise indicated Additional submittal
materials may be required if review by the Architectu ml Review Board is necessary. Applicants will be notified if additional
materials or ARB review are required.
SECTION 1: FREESTANDING, SUBDIVISION OR DIRECTORY SIGNS
A. Submittal Requirements
❑ Site plan or latest approved plat showing, to scale, the proposed location of the sign(s) with dimensions.
❑ Distance from the sign to the property lines and/or edge of the VDOT right -of --way.
❑ A footing/foundation diagram showing how the base or pole will be anchored in the ground.
❑ if the sign will be located in an easement, a letter of approval from the easement holder will be required.
❑ A to -scale color illustration of the proposed sign showing
❑ Dimensions of the sign, including overall height from the ground; cabinet size, length, width and depth; base
size, etc. (Be sure to also include these dimensions on the diagrams provided in the Sign Permit Application packet.)
❑ Proposed lettering and/or graphics in their proposed location.
❑ Entrance Corridor Requirements: if the sign is to be constructed in an Entrance Corridor, also provide a color
illustration of the front and side elevations of the sign showing:
o If internally illuminated, indicate which areas of the sign are opaque and which are illuminated. Internally
illuminated cabinet signs must have opaque backgrounds. (Opaque materials don't allow light to pass through.
When lit only from behind, the color of an opaque material cannot be detected nor can objects be seen through it.)
o Identification of proposed materials and colors. Include standard color id numbers (Pantone, Benjamin Moore,
Acrylic, etc.) for all materials, text, graphics, base, faces, trim caps, returns, etc.
o Provide accurate physical samples of all colors proposed, preferably in the material proposed. (Paint chips that
accurately reflect the proposed colors are acceptable.)
o Provide a site plan showing proposed landscaping around the sign, including botanical names and planting sizes.
o Additional submittal materials may be required if review by the Architectural Review Board is necessary. (The
applicant will be notified if this requirement applies.)
B. Inspection Requirements for Freestanding, Subdivision or Directory Signs
❑ Applicant must mark the location of the property lines and the location of the sign with stakes in preparation for a
preliminary zoning inspection. (All four corners of the sign must be marked with stakes that are easily visible to all
inspectors)
❑ A preliminary zoning inspection must be completed to verify the location of the sign before the permit can be
issued.
❑ Freestanding signs are required to have footing inspections. (scheduled by applicant)
❑ Freestanding signs are required to have electrical inspections if illuminated. (scheduled by applicant)
❑ Freestanding signs are required to have final building and zoning inspections. (scheduled by applicant)
11 /1 /2015 Page 2 of 4
SECTION 2: WALL SIGNS
A. Submittal Requirements
0 A drawing, to scale, showing dimensions of the sign (length, height, depth).
0 Elevation drawing(s) or modified photograph of the entire building, to scale and in color, showing
® The sign location on the building, sign height above grade, and the length of building frontage. (Be sure to also
include these dimensions on the diagrams provided in Appendix B)
0 Sign lettering and/or graphics in their proposed location.
❑ Entrance Corridor Requirements: If the sign is to be constructed in an Entrance Corridor also provide a color
illustration of the front and side elevations of the sign showing:
o Indication of sign type (channel letters, cabinet, panel, etc.).
o Indicate on the drawings the proposed materials and colors. Include standard color identification numbers
(Pantone, Benjamin Moore, Acrylic, etc.) for all materials, text, graphics, faces, trim caps, etc. For channel letter
signs, indicate on the drawing that the raceway color shall match the color of the wall to which the raceway is
attached.
o Provide accurate physical samples of all colors proposed in the sign, preferably in the material proposed. (Paint
chips that accurately reflect the proposed colors are acceptable.)
o Location of proposed light fixtures and manufacturer cut sheets describing illumination type, intensity, style,
shielding, color, and height. All lighting must meet ordinance requirements as outlined in Section 4.17.
o For internally illuminated signs, indicate which areas of the sign are opaque and which are illuminated. (Opaque
materials don't allow light to pass through. When lit only from behind, the color of an opaque material cannot be
detected nor can objects be seen through it. Internally illuminated cabinets must have opaque backgrounds.)
B. Inspection Requirements for Wall or Projecting Signs
❑ Wall and projecting signs arc required to have electrical inspections if illuminated. (Scheduled by applicant)
❑ Wall and projecting signs are required to have final building and zoning inspections. (Scheduled by applicant)
SECTION 3: ILLUMINATION REQUIREMENTS
A. if the proposed sign is to be illuminated, the applicant most provide the following:
❑ Electrical permit
❑ Electrical schematic
❑ The location of proposed light fixtures identified on a plan and/or elevation
❑ Manufacturer cut sheets describing illumination type, intensity, style, shielding, color, and height. All lighting must
meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance.
SECTION 4: WORK VALUATION
11 /1 /2015 Page 3 of 4
A. Work Valuation $333.70
Part D: Applicant Agreement
Applicant must read and sign
• Each application package must contain 4 folded copies of all plans and documents being submitted. Only 1 set of
material/color samples is required All submittal items become the property of Albemarle County. Applicants are
encouraged to maintain duplicate copies in their own files.
• The application package is not complete without this checklist, completed, signed, and included with the required
submittal materials indicated on the checklist.
I hereby certiA that the information provided on this application and accompanying information is accurate, true and
c rrect o the best of my kn edge and belief and contains all information required by these checklists
ViAA I )IA
06/20/2019
Si a o erso comple in checklist Date
Kris n Jones / Receptionist 434-974-7900 x100
Printed Name / Title Daytime phone number of Signatory
County of Albemarle Department of Community Development
401 McIntire Road, North Wing, Charlottesville, VA 22902-4596
(434) 296-5832 Tel, (434) 972-4126 Fax
www.albemarle.org
E
I
I 1 /1 /2015 Page 4 of 4
Sign Diagrams
Sign Dimensions
Sign
Height
I �
Distance to property line
or edge of right-of-way
Sign Height =
Sign Dimensions =
Pole -Mounted Sign — Diagram 1
(Generally not acceptable in the ECs)
Sign Sign Dimensions
Height
10
Building Frontage
Building Frontage = 520"
Sign Height = 10.5'
Sign Dimensions=105.5"w x 24"h
Wall Sign — Diagram 3
Sign 2 Height =
Sign 2 Dimensions =
Sign 3 Height =
Sign 3 Dimensions =
Sign Dimensions
Sign
Height
Distance to property line
or edge of right-of-way
Sign Height =
Sign Dimensions =
Monument Sign — Diagram 2
It multiple wall signs are proposed, list dimensions here:
Sign 4 Height =
Sign 4 Dimensions =
Sign 5 Height =
Sign 5 Dimensions =
Sign Diagrams revised 7/2009 — 1
CERTIFICATION THAT NOTICE OF THE
APPLICATION HAS BEEN PROVIDED TO THE LANDOWNER
This form must accompany zoning applications (Home Occupation, Zoning Clearance, Zoning
Administrator Determinations or Appeals, Sign Permits, Building Permits) if the application is not the
owner.
1 certify that notice of the application, The Chiropractic Office
[County application name and number]
was provided to LINDA BLAKE GAYLE LLC
[name(s) of the record owners of the parcel]
and Parcel Number 061 WO-03-00-021A0
manner identified below:
*1
Hand delivering a copy of the application to
the owner of record of Tax Map
by delivering a copy of the application in the
[Name of the record owner if the record owner is a
person; if the owner of record is an entity, identify the recipient of the record and the recipient's
title or office for that entity]
on
Date
Mailing a copy of the application to LINDA BLAKE GAYLE LLC
[Name of the record owner if the record owner is a person;
if the owner of record is an entity, identify the recipient of the record and the recipient's title or
office for that entity]
on 06/20/2019
Date
to the following address:
5208 OCEAN FRONT AVE VA BEACH VA, 23451
[address; written notice mailed to the owner at the last known address of the owner as shown on
the current real estate tax assessment books or current real estate tax assessment records satisfies
this requirement].
Print Applicant Name
O6/20/2019
Date
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
SIGN PERMIT APPLICATION INFORMATION
Dear Sign Permit Applicant:
Thank you for your interest in a Sign Permit with the Albemarle County Department of Community Development. The information in this
packet has been assembled to assist you in the sign application and installation process. Enclosed you will find:
FOR PERMANENT SIGNS FOR TEMPORARY SIGNS
o Sign Permit Application and Checklist
o Entrance Corridors Map
o Developments w/ Comprehensive Sign Criteria
o Sign Diagrams
o Temporary Sign Permit Information
o Application for Temporary Sign Permit
Please review the enclosed information and, for permanent signs, complete the attached Sign Permit Application and Checklist. The
completed Application and Checklist may be mailed to the address in the letterhead or it may be delivered to the Community Development
office at 401 McIntire Road, I" Floor, North Wing. (For temporary signs, see the Temporary Sign Permit Info sheet.)
Completed applications are processed and reviewed as quickly as possible. An Intake Specialist will be assigned to your application for
review and processing and may contact you to discuss the application. A typical application requires 7 to 10 business days to review, plus
additional time for review of applications for signs in the County's Entrance Corridors. Approval times vary depending on staff workload
and the complexity and completeness of your application.
Your application will be considered ready for review when:
o The application has been completed and all the required submittal materials have been provided.
o All applicable State and County Contractor license Information has been provided.
o All permit fees and other related frees have been paid.
Please note that if you do not provide all required documentation for this application within six (6) months of your initial application date,
your application will become VOID. Should you wish to continue with your project at a later date, you will be required to initiate a new
application, complete with new documentation and fees.
Please note the special requirements outlined in the Application and Checklist for signs located in the County's Entrance Corridors.
Entrance Corridors are identified on the Entrance Corridors Map. In the Entrance Corridors, signs intended for buildings that house
multiple businesses must follow the Comprehensive Sign Criteria that have been established for those properties. Properties for which
Comprehensive Sign Criteria have been established are identified in the list entitled Developments with Comprehensive Sign Criteria. The
sign criteria for each property can be found on-line at the Community Development Forms Center. Signs meeting all the criteria established
for their respective property may be reviewed/approved by staff without review by the ARB.
Once your application has been reviewed and approved, you will be issued a Certificate of Appropriateness and a Building Permit. Your
Building Permit must be on site throughout the building process and available for public inspection. Once displayed, you are ready to begin
work. To keep your Building Permit active throughout the building process, YOU MUST COMMENCE WORK WITHIN SIX MONTHS
OF THE ISSUANCE DATE AND YOU MUST REQUEST AT LEAST ONE (1) INSPECTION WITHIN A SIX-MONTH TIME
PERIOD until the project is complete. If you are not ready for a specific inspection type, you may keep your permit active by providing
other evidence that work is being performed. AN APPROVED FINAL INSPECTION will serve as your final County approval.
We hope that you find this information packet useful when applying for a sign permit. Questions, comments and suggestions may be
submitted in writing or by calling our department at 434-296-5832. You may track the status of your Sign Permit and schedule required
inspections via the web at http://countyviewweb.albemarle.org/.
Sincerely,
Community Development Staff
9/17/09
N�mW=—+A1
2
? o Z0
a .j M
0
(A
3!p rt C 3
O m=.N3 v
3
fD
r+
Zm O
ai —IN RCN
ID
G1
N
w
�D
0 O N %i
Z
�•
rl
:3
tD 3
C In O
f S0
O Arta
c
3Nm
rD
�
rNaw
13
N
CA
v
eD (A o
g%
3
3
,,
9D
D
rF
O
CD
O
C!)
cQ
D
z
m
D
El
D
O
0
ff
UD
Q-
^D
(C)
1
✓0)
O
T
0
Fj
Ll