Loading...
HomeMy WebLinkAboutARB201900074 Checklist 2019-06-26Completeness Check for Signs Project #/Name: _ARB-2019-74: Jiffy Lube signs Date Received at County: _6/21/19 Date Received in Design Planning: _6/24/19_ Date of Checklist Check: 6/26/19 Assigned to/Date: _HNM 6/25/19 FEES 3. ARB Review — Will the permanent sign(s) be constructed in an Entrance Corridor? (See the Entrance Corridor map in the Sign Permit Application packetfor a list of Entrance Corridors.) I❑ Yes is sin will be constructed in an Entrance Corridor and it does not meet the conditions o a $129.00 Commented [HM1]: Fee due. This parcel does not have a CSP. Also, pages 2-3 of application missing. Comprehensive Sign Review. See ARB requirements next pages) ❑ Yes (This sign will be constructed in an Entrance Corridor and it does meet the conditions ofa Waive Fee Comprehensive Sign Review. See ARB requirements next pages) ❑ No (This sign will not be constructed in an Entrance Corridor) $ 0.00 FEE TOTAL (Please add all the amounts checked in sections 1 — 3): $ 129 WALL SIGNS ❑ A drawing, to scale, showing dimensions of the sign (length, height, depth). ❑ Elevation drawing(s) or modified photograph of the entire building, to scale and in color, showing ❑ The sign location on the building, sign height above grade, and the length of building frontage. (Be sure to also include these dimensions on the diagrams provided in Appendix B) ❑ Sign lettering and/or graphics in their proposed location. ❑ Entrance Corridor Requirements: If the sign is to be constructed in an Entrance Corridor also provide a color illustration of the front and side elevations of the sign showing: o Indication of sign 6pe (channel letters, cabinet, panel, etc.). o Indicate on the drawings the proposed materials and colors. Include standard color identification numbers (Pantone, Benjamin Moore, Acrylic, etc.) for all materials, text, graphics, faces, trim caps, etc. For channel letter signs, indicate on the drawing that the Iracewa color shall match the color of the wall to which the raceway is attached. o Provide accurate physical kamplesl of all colors proposed in the sign, preferably in the material proposed. Paint chips that accurately reflect the proposed colors are acceptable.) o Location of proposed eight fixtures d manufacturer cut sheets describing illumination type, intensity, style, shielding, color, and height. All lighting must meet ordinance requirements as outlined in Section 4.17. o For internally illuminated signs, indicate which areas of the sign are bpqN and which are illuminated. LORa ue materials don't allow light to pass through. When lit only from behind, the color of an opaque material cannot be detected nor can objects be seen through it. ILLUMINATION REQUIREMENTS rl The location of proposed light fixtures identified on a plan and/or elevation ❑ Manufacturer cut sheets describing illumination type, intensity, style, shielding, color, and height. All lighting must meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance. NOTES: Fee missing, application pages 2-3 missing; color, material information missing. Sign on south side not visible from EC and not subject to ARB review. Additional pages confusing: are logos and directional signs also requested?? Commented [HM2]: Not specified Commented [HM3]: Not provided _ Commented [HM4]: Mounting details not specified Commented [HMS]: Not provided Commented [HM6RS]: Commented [HM7]: N/A Commented [HMS]: N/A Commented [HM9]: Sign drawing states that channel letters and cabinet sign are non -illuminated