HomeMy WebLinkAboutZMA201900008 Study 2019-05-20RAMEY KEMP & ASSOCIATES. INC ,0R A M E Y K E M P 4343 Cox Road S Glen Allen, VA 23060 ASS 0 C I A T E S Phone: 804-217-8560 Fax: 804-217-8563 7righ�PORTaTION ENGINEERS www.rameykemp.com May 20, 2019 Mr. Kevin McDermott Albemarle County 401 McIntire Road Charlottesville, Virginia 22902 Phone: (434) 296-5832 Reference: Rio Road Multi -Family — Traffic Impact Analysis (TIA) Dear Mr. McDermott, Ramey Kemp & Associates, Inc. (RKA) has performed a Traffic Impact Analysis (TIA) for the proposed 328- unit multi -family development located on the southwest corner of the Rio Road at John Warner Parkway / CATEC Driveway intersection. The access plan includes one full -movement driveway and one right -in only driveway on Rio Road and a stub -out for a future connection on the south side of the property. If approved, the proposed development is expected to be built in 2023. Figure 1 shows the site location and study intersections, and Figure 2 shows the preliminary site plan. The purpose of this letter report is to provide the following: ■ Trip generation calculations • Evaluation of turn lane warrants for the site driveways IN Capacity and queueing analysis of the study intersections Existing Roadway Conditions Route 631 (Rio Road) is a two-lane Major Collector with a 2017 Virginia Department of Transportation (VDOT) average daily traffic (ADT) volume of approximately 28,000 vehicles per day (vpd), and a posted speed limit of 35 mph in the vicinity of the site. Rio Road becomes a four -lane divided Minor Arterial with a 2017 ADT volume of approximately 28,000 vpd and a posted speed limit of 35 mph north of the site. Route 2500 (John Warner Parkway) is a two-lane Minor Arterial with a posted speed limit of 35 mph in the vicinity of the site and does not have a VDOT published ADT volume. Based on discussion with the County, the ADT is approximately 17,500 vpd. Route 768 (Pen Park Road) is a two-lane local road with a 2017 VDOT ADT volume of approximately 4,300 vpd, and a posted speed limit of 35 mph in the vicinity of the site. Route 1177 (Dunlora Drive) is a two-lane local road with a 2017 VDOT ADT volume of approximately 2,300 vpd, and a posted speed limit of 35 mph in the vicinity of the site. Figure 3 shows existing lane configuration. Raleigh, NC - Charleston, SC - Charlotte, NC - Columbia, SC - Richmond, VA - Winston-Salem, NC Mr. Kevin McDermott Page 2 of 11 Existing Traffic Volumes The AM peak hour (7:00 to 9:00 AM) and PM peak hour (4:00 to 6:00 PM) turning movement counts were conducted by Burns Service, Inc. during the week of August 27 at the following intersections: ■ Rio Road at John Warner Parkway / CATEC Driveway ■ Rio Road at Dunlora Drive ■ Rio Road at Pen Park Road / Waldorf School Road Note that some volumes have been increased as necessary to balance between the Rio Road at John Warner Parkway / CATEC Driveway intersection and the Rio Road at Dunlora Drive intersection. The traffic count data are enclosed, and the existing 2018 volumes are shown in Figure 4. Background Traffic Growth Based on discussion with the County and VDOT, the 2018 peak hour traffic volumes were grown by an annual rate of 2.0% for five years to estimate the 2023 peak hour traffic volumes. Approved Development Traffic Based on discussion with the County and VDOT, three approved developments near the site are included in this TIA. Belvedere Residential is partially built -out, with 190 single family homes and 90 townhomes remaining to be built, and is located at the end of Belvedere Boulevard. The trip generation potential of Belvedere Residential during a typical weekday, AM peak hour and PM peak hour was estimated using the methodologies published by the Institute of Transportation Engineers (ITE) Trip Generation Manual —10`h Edition. Table 1 TTR Trin Generation — Belvedere Residential — Weekday —10tn Edition Weekday Daily Traffic AM Peak Hour PM Peak Hour Land Use Size (vpd) (vph) (vph) (ITE Land Use Code) Enter Exit Enter Exit Enter Exit Single Family Detached Housing 190 homes 938 938 35 106 118 70 (210) Multifamily Housing (Low -Rise) 90 units 330 330 10 33 34 20 (220) Total Trips 1,268 1,268 45 139 152 90 Figures 5 and 6 show the trip distribution and assignment for Belvedere Residential. RAMEY KEMP ASS061ATES Mr. Kevin McDermott Page 3 of 11 Dunlora Park Residential consists of 28 single family homes and 14 townhomes, and is located on Varick Street. The ITE trip generation potential of Dunlora Park Residential is shown in Table 2. Table 2 1TF Trin Generation — Dunlora Park Residential — Weekday —1011 Edition Weekday Daily Traffic AM Peak Hour PM Peak Hour Land Use See (vpd) (vph) (vph) (ITE Land Use Code) Enter Exit Enter Exit Enter Exit Single Family Detached Housing 28 homes 161 161 6 19 19 11 (210) Multifamily Housing (Low -Rise) 14 units 51 51 1 6 6 4 (220) Total Trips 212 212 7 25 25 15 Figures 7 and 8 show the trip distribution and assignment for Dunlora Park Residential. Lochlyn Hill Residential is partially built -out, with 129 single family homes and 14 townhomes remaining to be built and is located on the south side of Pen Park Lane. The ITE trip generation potential of Lochlyn Hill Residential is shown in Table 3. Table 3 1TF. Trin Generation — Lochlvn Hill Residential — Weekday —1011 Edition Weekday Daily Traffic AM Peak Hour PM Peak Hour Land Use Size (vpd) (vph) (vph) (ITE Land Use Code) Enter Exit Enter Exit Enter Exit Single Family Detached Housing 129 homes 657 657 24 72 82 48 (210) Multifamily Housing (Low -Rise) 14 units 51 51 1 6 6 4 (220) Total Trips 708 708 25 78 88 52 Figures 9 and 10 show the trip distribution and assignment for Lochlyn Hill Residential. The total approved development trips are shown in Figure 11. The total approved development trips were combined with the background growth to estimate the 2023 no -build traffic volumes, which are shown in Figure 12. RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 4of11 There are several other small developments currently under construction near the site (such as the senior citizen building and school expansion). Based on discussion with the County, it was determined that the trip generation potential of these sites is captured in the 2% annual growth rate. Trip Generation The trip generation potential of the proposed neighborhood during a typical weekday, AM peak hour, and PM peak hour was estimated using the methodologies published by the Institute of Transportation Engineers (ITE) Trip Generation Manual —10`h Edition. Table 4 summarizes the trip generation calculations. Table 4 ITE Trio Generation — TyDical Weekday —10" Edition Average Daily Traffic AM Peak Hour PM Peak Hour Land Use Size (vpd) (vph) (vph) (ITE Land Use Code) Enter Exit Enter Exit Enter Exit Multifamily Housing (Mid -Rise) 328 units 893 893 31 87 85 54 (221) It should be noted that Rio Road is an existing transit corridor, and some of the future residents living along Rio Road will likely use the transit service. This will reduce the number of vehicles on Rio Road. To be conservative, this reduction was not applied to the trip generation potential of the site or the surrounding approved developments. Site Traffic Distribution The following site traffic distribution was applied based on coordination with the County and VDOT: ■ 32% to / from the north on Rio Road ■ 32% to / from the south on Rio Road ■ 3 1 % to / from the south on John Warner Parkway • 2% to / from the east on Pen Park Road 1% to / from the south on Waldorf School Road ■ 1 % to / from the north on CATEC Driveway ■ 1 % to / from the north on Dunlora Drive Figures 13 and 14 show the site trip distribution and site trip assignment, respectively. Figure 15 shows the projected 2023 build -out peak hour traffic volumes. RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 5 of 11 VDOT Turn Lane Warrant Analysis The projected build -out AM and PM peak hour traffic volumes at the proposed site driveways were compared to the turn lane warrants in the Virginia Department of Transportation (VDOT) Access Management Design Standards for Entrances and Intersections: Rio Road at Right -in Only Driveway: ■ A southbound right -turn taper on Rio Road is warranted in the PM peak hour Rio Road at Full -Movement Driveway: ■ A northbound left -turn lane on Rio Road is warranted ■ A southbound right -turn taper on Rio Road is warranted in the PM peak hour Intersection Spacing Standards VDOT requires at least 250 feet of separation between partial access driveways and full -movement driveways / intersections on Minor Arterial roadways. The proposed right -in only driveway is approximately 180 feet south of Dunlora Drive and 265 feet north of the proposed full -movement driveway. The proposed right -in only driveway does not meet VDOT's minimum intersection spacing standards, so an Access Management Exception (AME) request will be submitted. VDOT requires at least 470 feet of separation between full -movement driveways and intersections on Minor Arterial roadways. The proposed full -movement driveway is approximately 645 feet north of Dunlora Forest Drive. The proposed full -movement driveway exceeds VDOT's minimum intersection spacing standards. Traffic Capacity Analysis Traffic capacity analysis for the study intersections was performed using Synchro 10, which is a comprehensive software package that allows the user to model signalized and unsignalized intersections to determine levels -of - service based on the thresholds specified in the Highway Capacity Manual (HCM) — 61h Edition. Note that Rio Road is considered an east / west roadway but is north / south in the vicinity of the site. Additionally, John Warner Parkway, Dunlora Drive, Pen Park Road, and Waldorf School Road are all east / west roadways in the vicinity of the site. RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 6of11 Table 5 summarizes the capacity analysis results for the signalized intersection of Rio Road at John Warner Parkway / CATEC Driveway, and the Synchro outputs are enclosed for reference. Table 5 Level -of -Service Summary for Rio Road at John Warner Parkway / CATEC Driveway AM PEAK HOUR PM PEAK HOUR LANE Storage Lane Lane Overall Lane Lane Overall CONDITION Length GROUP (ft) Lane Delay Queue LOS Lane Delay Queue LOS LOS sec (ft) Dela LOS sec ft(Delay) EBL 200 D 48.0 31 D 51.6 35 EBT/R 300 C 33.9 267 D 36.0 421 WBL - C 28.5 454 D 39.0 577 Existing (2018) WBT - B 12.5 505 C A 9.5 385 C Traffic Conditions WBR NBL/T 500 75 A D 0.0 46.6.9 0 139 (20.8 see) A D 0.0 54.4.5 0 71 (26.4 see) NBR - A 6.9 143 B 17.6 276 SBL/T - D 48.2 17 D 51.0 18 SBR 125 A 0.0 0 A 0.0 0 EBL 200 D 49.6 35 D 52.4 37 EBT/R 300 D 38.1 306 D 46.4 583 WBL - C 33.9 533 D 47.5 734 No -Build (2023) WBT - B 15.4 682 C B 10.8 499 C WBR 500 A 0.0 0 A 0.0 0 Traffic Conditions NBL/T 75 D 53.9 176 (24.7 sec) E 58.7 84 (33.2 sec) NBR - B 10.4 221 C 23.6 397 SBL/T - D 49.5 17 D 51.3 20 SBR 125 A 0.0 0 A 0.0 0 EBL 200 D 49.9 35 D 52.5 37 EBT/R 300 D 39.4 312 D 53.4 622 Build 2023 ( ) WBL - D 35.8 558 E 58.0 807 Traffic Conditions WBT - B 16.1 698 C B 12.4 541 D Without WBR 500 A 0.0 0 A 0.0 0 Improvements NBL/T 75 E 56.9 224 (26.1 sec) E 55.8 102 (38.0 sec) NBR - B 11.3 248 C 23.3 418 SBL/T - D 49.8 17 D 51.3 22 SBR 125 A 0.0 0 A 0.0 0 EBL 200 D 49.9 35 D 52.5 37 EBT/R 300 D 39.4 312 D 53.4 622 Build (2023) WBL D 35.8 558 E 58.0 807 Traffic Conditions WBT - B 16.1 698 C B 12.4 541 D With Median WBR 500 A 0.0 0 A 0.0 0 Acceleration Lane NBL/T - E 56.9 224 (26.1 sec) E 55.8 102 (38.0 sec) NBR - B 11.3 248 C 23.3 418 SBL/T - D 49.8 17 D 51.3 22 SBR 125 A 0.0 0 A 0.0 0 EBL 200 D 49.1 35 D 52.5 37 EBT/R 300 D 36.7 312 D 49.2 611 Build 2023 ( ) W11L - C 20.4 413 D 43.4 734 Conditions ti 13T - B 16.8 698 C B 12.4 541 C With Median WBR 500 A 0.0 0 A 0.0 0 Acceleration Lane NBL/T - D 53.0 228 (22.6 sec) E 56.1 104 (34.2 sec) and WBL phasing NBR B 11.8 250 C 25.0 463 SBL T D 49.2 17 D 51.3 22 SBR 125 A 0.0 0 A 0.0 0 ,0RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 7of11 Capacity analysis indicates that the intersection currently operates at LOS C during the AM and PM peak hours. Under no -build conditions, the intersection is expected to continue to operate at LOS C during the AM and PM peak hours. Under build conditions (without improvements), the intersection is expected to operate at LOS C during the AM peak hour and LOS D during the PM peak hour. Under build conditions (with median acceleration lane), the intersection is expected to operate at LOS C during the AM peak hour and LOS D during the PM peak hour with the following improvement: ■ Restripe the existing northbound shared left -through lane on Rio Road to extend the existing storage to Dunlora Drive Description of WBL phase change. RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 8of11 Table 6 summarizes the capacity analysis results for the unsignalized intersection of Rio Road at Dunlora Drive, and the Synchro outputs are enclosed for reference. Table 6 Level -of -Service Summary for Rio Road at Dunlora Drive AM PEAK HOUR PM PEAK HOUR LANE Storage Lane Lane Lane Overall Lane Lane Lane Overall CONDITION GROUP Length (D) LOS Delay Queue LOS LOS Delay Queue LOS (see) (ft) (Delay)' (sec) (ft) (Delay)' WBLI - E 45.5 55 D 33.9 15 Existing (2018) WBR' 200 B 14.6 15 N/A B 13.5 5 N/A Conditions NBTBL/R 50 A 9.3 5 A 9.4 8 SBT - - - - WBL' - F 117.7 138 F 57.3 38 No -Build (2023) WBR' 200 C 16.9 20 N/A B 14.8 8 N/A Conditions BLR 50 A 9.8 5 A 9.9 10 SBT - - - - - Build (2023) WBL' - F 164.3 160 F 73.4 48 Conditions WBR' 200 C 18.3 23 C 15.6 8 NBT/R - - - - N/A - - N/A Without SBLz 50 B 10.1 8 B 10.2 10 Improvements SBT - I - - - - - Build (2023) WBL' - D 25.5 56 C 20.7 17 Conditions WBR' 200 D 25.5 56 C 20.7 17 With Median NBT/R - - - - N/A - - - N/A Acceleration SBL2 B 10.1 7 B 10.2 10 Lane SBT - - - - - - - 1. Level of service for minor approach 2. Level of service for major street left-tum movement 3. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Capacity analysis indicates that the minor street left -turn movement currently operates with moderate delays (between 25 and 50 seconds) during both the AM and PM peak hours. Under no -build conditions, the minor street left -turn movement is expected to operate with long delays (greater than 50 seconds) during both peak hours. Under build conditions (without improvements), capacity analysis indicates that the minor street left -turn movement is expected to operate with long delays (greater than 50 seconds) during the AM and PM peak Under build conditions (with median acceleration lane), capacity analysis indicates that the minor street left - turn movement is expected to operate with moderate delays (between 25 and 50 seconds) during the AM peak hour and short delays (less than 25 seconds) during PM peak hour with the following improvements: ■ Construct one southbound through lane on Rio Road ■ Restripe the existing southbound through lane on Rio Road as a dedicated left -turn lane extending back to the Rio Road at John Warner Parkway / CATEC Driveway intersection 0 RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 9 of 11 Collision data was obtained from the Virginia Crash GIS published by VDOT based on data from the Virginia Department of Motor Vehicles (DMV). Data was reported from January 1, 2013 to December 31, 2017 within 150 feet of the study intersection. There have only been five reported collisions over the last 5 years and just one angle crash, so the intersection does not meet the warrant of five or more correctable collisions over a twelve-month period. Additionally, the collision data does not indicate an unusual crash pattern that would be mitigated with the installation of a traffic signal. Table 7 summarizes the capacity analysis results for the signalized intersection of Rio Road at Pen Park Road / Waldorf School Road, and the Synchro outputs are enclosed for reference. Table 7 Level -of -Service Summary for Rio Road at Pen Park Road / Waldorf School Road AM PEAK HOUR PM PEAK HOUR Storage CONDITION LANE Length Lane Lane Overall Lane Lane Overall GROUP (ft) Lane Delay Queue LOS Lane Delay Queue LOS LOS sec ft (Delav) LOS (sec) (ft)(Delay) EBL/T/R - C 23.0 68 C 27.7 28 WBL/T 350 C 29.4 130 C 29.5 60 WBR - A 5.8 31 A 5.4 24 Existing (2018) NBL 75 A 6.9 32 B A 3.0 4 A NBT - C 20.3 223 B 12.9 285 Traffic Conditions NBR 125 A 3.6 21 (15.3 sec) A 1.8 16 (9.5 sec) SBL 225 A 8.6 56 A 3.7 25 SBT - B 17.0 198 A 5.5 156 SBR 100 A 0.1 0 A 0.0 0 EBL/T/R - C 25.1 74 C 31.7 33 WBL/T 350 C 34.6 146 C 34.6 70 WBR - A 5.8 31 A 7.3 31 No -Build (2023) NBL 75 A 7.5 34 B A 2.6 4 A NBT - C 22.5 278 B 12.8 334 Traffic Conditions NBR 125 A 4.7 29 (17.3 sec) A 1.7 17 (9.8 sec) SBL 225 B 10.4 61 A 3.8 25 SBT - B 18.4 245 A 5.4 188 SBR 100 A 0.1 0 A 0.0 0 EBL/T/R - C 25.1 73 C 32.0 34 WBL/T 350 C 34.7 144 C 34.9 69 WBR - A 5.7 30 A 7.5 32 Build (2023) NBL 75 A 7.9 35 B A 2.8 4 B Conditions NBT - C 24.3 299 B 13.4 370 NBR 125 A 5.5 34 (18.2 sec) A 1.8 17 (10.1 sec) SBL 225 B 10.6 64 A 4.0 27 SBT - B 19.6 279 A 5.7 208 SBR 100 A 0.1 0 A 0.0 0 Capacity analysis indicates that the intersection currently operates at LOS B during the AM peak hour and LOS A during the PM peak hour. Under no -build conditions, the intersection is expected to continue to operate at LOS B during the AM peak hour and LOS A during the PM peak hour. Under build conditions, capacity analysis indicates that the intersection is expected to continue to operate at LOS B during the AM peak hour and LOAS A during the PM peak hour with all movements at LOS D or better. ANEY KEMP ASSOCIATES Mr. Kevin McDermott Page 10 of 11 No improvements are warranted or recommended at this intersection at build out of the neighborhood. It should be noted that the County has submitted a SMART Scale project application to convert the existing signalized Rio Road at Pen Park Road intersection into a roundabout. If the application is successful, and the roundabout is constructed, the roundabout will likely improve the overall LOS for the intersection and will not have an impact on other intersections in this analysis. Table 8 summarizes the capacity analysis results for the unsignalized intersection of Rio Road and Full - movement Driveway, and the Synchro outputs are enclosed for reference. Table 8 Level -of -Service Summary for Rio Road at Full -movement Driveway CONDITION LANE GROUP Storage Length AM PEAK HOUR PM PEAK HOUR Lane Lane Lane Overall Lane Lane Lane Overall (ft) LOS Delay Queue LOS LOS Delay Queue LOS (sec) (ft) (Delay) (sec) ft)(Delay) EBLI F 51.3 50 F 50.5 33 Build (2023) EBR' - B 13.5 5 B 13.5 3 Conditions NBL2 100 A 9.0 0 N/A3 A 9.2 3 N/A3 NBT - - - - - - SBT/R - I - I - - - 1. Level of service for minor approach 2. Level of service for major street left -turn movement 3. HCM methodology does not provide lane group or overall LOS, delay, and queue lengths for major street through movements or right turns at unsignalized intersections. Capacity analysis indicates that the minor street left -turn movement is expected to operate with long delays (greater than 50 seconds) during the AM and PM peak hours with queue lengths less than three vehicles with the following improvements: ■ Construct a northbound left -turn lane on Rio Road with 100 feet of storage ■ Construct a southbound right -turn taper on Rio Road ■ Construct the site driveway with one ingress lane and two egress lanes *RAMEY KEMP ASSOCIATES Mr. Kevin McDermott Page 11 of 11 Recommendations Based on the trip generation potential of the site, the following improvements are recommended: Rio Road at John Warner Parkway / CATEC Driveway: ■ Restripe the existing northbound shared left -through lane on Rio Road to extend the existing storage to Dunlora Drive Rio Road at Dunlora Drive: ■ Construct one southbound through lane on Rio Road ■ Restripe the existing southbound through lane on Rio Road as a dedicated left -turn lane extending back to the Rio Road at John Warner Parkway / CATEC Driveway intersection ■ Construct a southbound acceleration lane on Rio Road Rio Road at Ri ht-in Only Drivewa : ■ Construct a southbound right -turn taper on Rio Road ■ Construct the site driveway with one ingress lane Rio Road at Full -movement Drivewa : ■ Construct a northbound left -turn lane on Rio Road with 100 feet of storage ■ Construct a southbound right -turn taper on Rio Road ■ Construct the site driveway with one ingress lane and two egress lanes Figure 16 shows the recommended lane configuration. We appreciate your attention to this matter. Please contact me at (804) 217-8560 if you have any questions about this report. Sincerely yours, Ramey Kemp & Associates, Inc. Michael Bailey, P.E., PTOE Project Manager Enclosures: Figures, VDOT turn lane warrant diagrams, Traffic count data, Synchro output Copy to: Mr. Adam Moore, P.E., VDOT Mr. Ryan Hambleton, Kotarides Mr. Scott Collins, P.E., Collins Engineering Mr. Bill Mechnick, LPDA RAMEY KEMP ASSOCIATES Site Location and _ _ R A M E Y K E M P Rio Road Multi -Family Study Intersections A S S O C I A T E S Albemarle County, Virginia YR�1N®PCIRTATION EmgINEERG Scale: Not to Scale I Figure 1 :It RAM EY KEM P ASSOCIATES TRAMS F❑RTATION ENGINEERS I I I 1 1 1 1 1 1 Rio Road Multi -Family Preliminary Site Plan Albemarle County, Virginia Scale: Not to Scale l Figure 2 CATEC Driveway N_ John Warner 17,500 vpd Parkway 35 mph 200J 300, Waldorf School Road LEGEND IExisting Traffic Signal Existing Lane x, Storage (In Feet) XXX vpd Average Daily Traffic RAMEY KEMP 9k ASSOCIATES TRANBP�RTATIQN ENOINEVUS 500' f 2,8000 vpd Rio 35 mph Road o 20Y L► j- 2,300 vpd Dunlora 35 mph Drive �1c o ;- O N N 350' 4,300 vpd pen Park +� r► 35 mph Road � N Rio Road Existing (2018) Rio Road Multi -Family Lane Configurations Albemarle County, Virginia Scale: Not to Scale I Figure 3 CATEC Driveway 8 (28) f— 674 (636) 0 0 r 485 (537) John Warner _.j L► 1 Rio Road ParkwayIF (15) 13 j � (824) 480 --► (36) 28 - oo " N 0 kn � o 62 (24) r 66 (22) 1 Dunlora Drive M 7 O� N O M CL O t` oo O 183 (74) O° 0O 1 (0) M M M 148 (49) Waldorf School Pen Park Road Road (6) 21 M (0) 2 --► (11) 51 Rio Road LEGEND X (Y) AM (PM) Peak Hour Traffic Existing (2018) R A M E Y K E M P Rio Road Multi -Family Peak Hour Traffic Volumes ASS a C I A T E S Albemarle County, Virginia THp N$P�RIATION frJe31/EEN$ Scale: Not to Scale I Figure 4 CATEC Driveway f(45%) � 45% 45% John Warner Rio Road 1 4C Parkway 45% --► 45% - o � v a� a CG M Belvedere (10%) Residential � Dunlora Drive 0 0 0 0 Waldorf School Pen Park Road / Road 0 0 LEGEND 10% Rio Road X% (Y%) Entering (Exiting) Trip Distribution xx^�e Regional Trip Distribution Belvedere Residential _ _ R A M E Y K E lilt P Rio Road Multi -Family Distribution W A S S O C I A T E S Albemarle County, Virginia TRANBPO RTATION ENGINEERS Scale: Not to Scale Figure CATEC Driveway -4— 63 (41) r 20 (68) John Warner Rio Road 1 Parkway (68) 20 (68) 20 �► a� a > a a� AG ^^ Belvedere 13 (8) f Residential Dunlora _ �. Drive 6 M Waldorf School ` Pen Park Road T] Road 6 Rio Road LEGEND X (Y) AM (PM) Peak Hour Traffic Belvedere Residential R A M E Y K E M P Rio Road Multi -Family Assignment ASS O C l A T E S Albemarle County, Virginia TRAN9 pp HTA TION EFJBINEERS Scale: Not to Scale Figure 6 CATEC Driveway LE( X% (Y%) Entering (Exiting) Trip Distribution XXE�i Regional Trip Distribution Dunlora Park Residential _ R A M E Y K E M P Rio Road Multi -Family Distribution A S S O C I A T E S Albemarle County, Virginia TRRN9P0 RTATION ENUINEER$ Scale: Not to Scale L ure 7 CATEC Driveway John Warner Rio Road Parkway (8) 2 8 (5) 9 (5) r 2 (8) Dunlora 1 Drive (17) 5 ('o- U Nv Dunlora Park i Residential L � J rn Waldorf School Pen Park Road ' 3 / Road TM O� Rio Road LEGEND X (Y) AM (PM) Peak Hour Traffic Dunlora Park Residential _ R A M E Y K E M P Rio Road Multi -Family Assignment A S S O C 1 A T E 5 Albemarle County, Virginia TRAry BPn RTATION fNQINEEAS Scale: Not to Scale Figure LEGEND X% (Y%) Entering (Exiting) Trip Distribution F7.1 Regional Trip Distribution RAMEY KEMP Ek ASS0C[ATES TRAH BPG RTATIpN ENGINEERS CATEC Driveway Lochlyn Hill Residential Rio Road 65% Lochlyn Hill Residential Rio Road Multi -Family Distribution Albemarle County, Virginia Scale: Not to Scale I Figure 9 LEGEND X (Y) AM (PM) Peak Hour Traffic _ _ RAM EY KEM P ASSOCIATES TpA N$AOATATiON EF40INEEMB CATEC Driveway Lochlyn Hill Residential Rio Road Lochlyn Hill Residential Rio Road Multi -Family Assignment Albemarle County, Virginia Scale: Not to Scale I Figure 10 LEGEND X (Y) AM (PM) Peak Hour Traffic RAMEY KEMP 8 ASSOCIATES 7gAN6G0 HTATION ENBINEERfi CATEC Driveway Rio Road Total Approved Rio Road Multi -Family Development Volumes Albemarle County, Virginia Scale: Not to Scale I Figure 11 CATEC Driveway 9 (31) zzll 804 (741) O 543 (622) John Warner Rio Road Parkway 1 (17) 14 2 'l T (i (974) 548 (48) 33 " 00 76 (31) r 95 (37) 1 Dunlora Drive 000 M b O � O 201 (81) M f 1 (0) r 163 (54) Waldorf School 1 Pen Park Road / I— Road (7) 23 oo In cv (0) 2 ---► (12) 56 LEGEND Rio Road X (Y) AM (PM) Peak Hour Traffic R A IVI E Y K E M P No Build (2023) Peak Hour _ _ Rio Road Multi -Family Traffic Volumes f A S S Q C I A T E S Albemarle County, Virginia TAANSPO>'iTATIpN ENgINEEAb Scale: Not to Scale Figure 12 CATEC 10 e 32% EE31 % John Warner Rio Road 320/ Parkway 1 o 31%� T (� N Site ignr-m Uu Driveway Fuli-movernent Driveway I%71 Waldorf School Road LEGEND X% (Y%) Entering (Exiting) Trip Distribution X o�n Regional Trip Distribution - Right -in / Right -out Driveway RAMEY KEMP ak ASSOCIATES TqA N6 PO RTATION ENGINEERS (65%) (35%) can Dunlora 1 Drive Pen Park F %o Road Rio Road Multi -Family Site Trip Distribution Albemarle County, Virginia Scale: Not to Scale I Figure 13 CATEC Driveway 0 r 10 (27) John Warner 1 Rio Road Parkway (26) 10 ? ► 00 O Site 1 0 (1) Dunlora Drive M v O M /1 Rigllt-in On[ Driveway N_ Full -movement Driveway (35) 57 (19) 30 o Waldorf School 1 (2) Pen Park Road / Road (1)0j TO N LEGEND Rio Road X (Y) AM (PM) Peak Hour _ _ RA M E Y K E M P Rio Road Multi -Family Site Trip Assignment A S S O C I A T E S Albemarle County, Virginia T IIANi6POATAT�9N ExaiNEYcp6 Scale: Not to Scale Figure 14 John Warner Parkway Site CATEC Driveway 9 (31) `o 804 (741) 0 o v r 553 (649) _.j 1 i-► p 1 Rio Road (17) 14� (974) 548 - ► (74) 43 N � M W i �- O O �O M � W) .-. N ighl-in Dul Driveway Full -movement Driveway (35) 57 (19) 30 0 00 r. rn v M M � Waldorf School Road LEGEND X (Y) AM (PM) Peak Hour Traffic L 76 (31) 95 (38) 0 202 (83) �— 1 (0) r 163 (54) 1 Dunlora Pen Park Road 23 - t (8) oo V) N (0) 2 `� k (12) 56 rn Rio Road Build (2023) Peak Hour V AMEY KEMP Rio Road Multi -Family Traffic Volumes OCIATES Albemarle County, Virginia +�NBPO RTATION ENOINEERB Scale: Not to Scale Figure 15 CATEC Driveway n 500' f John Warner Rio Road Parkway a 300' —r 'E a 200' ce Site + Dunlora Drive a ✓F f Right -in On[ , Driveway a Full -movement Driveway f o � O N N Waldorf School J L, 350' Pen Park Road 1 � f r► Road LEGEND --► Existing Lane Rio Road Recommended Lane X' Storage (In Feet) Recommended Lane _ R A M E Y K E M P Rio Road Multi -Family Configuration _ ~ASS 0 C t A T E S Albemarle County, Virginia 7RAIYBYOfl TATrCN EI�FglNEEfls Scale: Not to Scale Figure 16 Rio Road at Full -Movement Driveway F-78 Northbound Left -turn Lane Warrant Build (2023) Volumes WARRANT FOR LEFT -TURN STORAGE LANES ON TWO-LANE HIGHWAY ■■■�■■■■■■■■■l�■■■■■■■■■i■■■ 11 Storage Length. ■■■i♦■■■■■■■!■i!■!■■■■■■■■■i! �i ■■■ ■■■■■■■■■■■�1■i■■■■■■■■■■■■n■■__--_---_---- ® ■■■■■■■■■■!■■■■■■■ir•■ ■■■■■■■!■■�I■ ■■■■■■ ■■■■■■■■■■■i ■■■■■■■■\ ■■■■1■■�1■■1■■■1■■■■■!■ 11 ■ ----------------"7■1!!■■■■!.■■n■■■■■■!■■■■■■■ NEE ■ ■■1�■t�t��■tt��t�■■■■1i!■\■■il■n■■■■■1■■Will ■■1■■■■■■■■1■■■■■■■■i■■■■i■�■■\nil■■1��■■��■il ■■!■■■■■■■■■■■■■■■■■■■■■■i■!■■■ilk■!■■!■■1ii■■■1 1 11 11 •1/ ® 11 i• /11 800 2 700 d W 600 2 J 500 O 400 z 0 300 a o 200 0 0 > 100 200 400 600 800 1000 VA ADVANCING VOLUME (VPH) FIGURE 3-6 120 100 O x W a 80 W J _U x W vi 60 z oC f- C9 40 a 20 Rio Road at Full -Movement Driveway Southbound Right -turn Lane Warrant F-96 Build (2023) Volumes 100 200 300 400 500 600 700 625 PHV APPROACH TOTAL, VEHICLES PER HOUR Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adiustment for Riaht Turns For posted speeds at or under 45 mph, PHV right turns > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice When right turn facilities are warranted, see Figure 3-1 for design criteria.* FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev. 1 /15 120 100 O x w a 80 W J U Y W V! 60 Z H cx7 40 cc 30' 20 1- Rio Road at Right -in Only Driveway Southbound Right -turn Lane Warrant F-96 Build (2023) Volumes 100 200 300 400 500 60 � 3� 680 70 PHV APPROACH TOTAL, VEHICLES PER HOUR Appropriate Radius required at all Intersections and Entrances (Commercial or Private). LEGEND PHV - Peak Hour Volume (also Design Hourly Volume equivalent) Adjustment for Riaht Turns For posted speeds at or under 45 mph, PHV right turns > 40, and PHV total < 300. Adjusted right turns = PHV Right Turns - 20 If PHV is not known use formula: PHV = ADT x K x D K = the percent of AADT occurring in the peak hour D = the percent of traffic in the peak direction of flow Note: An average of 11 % for K x D will suffice. When right turn facilities are warranted, see Figure 3-1 for design criteria. FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY) Rev. 1 /15