Loading...
HomeMy WebLinkAboutWPO201900018 Calculations Stormwater Management Plan 2019-06-06 PEABODY VSMP PLAN STORMWATER MANAGEMENT CALCULATIONS PACKET (WPO 201900018) Date of Calculations APRIL 22, 2019 PREPARED BY: COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 VISA1 rR Op` 434.293.3719 PH �r�• 434.293.2813 FX SCOT rY www.collins-engineering.com Z Lip. No 035797NS c?i APPROVED �%NAL „ by the Albemarle County Community Dev IuprlentDepartment Date File Zo rq- ON Virginia Runoff Reduction Method Water Quality Calculations for ReDevelopments The following VRRM water quality calculations for ReDevelopments are for the proposed amendment. The areas shown in the following calculations are defined by the limits of disturbance. These calculations show the REQUIRED phosphorous removal rate for the amendment. DEQ Virginia Runoff Reduction Method Re-Development Compliance Spreadsheet-Version 3.0 0'2011 BMP Standards and Specifications 02013 Draft BMP Standards and Specifications cells' input Project Name: Peabody-Amendment's Required Water Quality Treatment constantr•Mes _. _. Date: 4/22/2019 _ _ Linear Development Project? No calculation cells ' Site Information final result. Post-Development Project(Treatment Volume and Loads) Enter Total Disturbed Area(acres) _/I®, Check: _ BMP Dealg Specifications icoons List:2011 Stds&Specs Maximum reduction required: , Linear project? No the site's net increase in impervious cover(acres)is:gorcom Land cover areas entered correctly?, se Post-DevelopmentI 7P Load Reduction for Site(!b/yrJr� Total disturbed area entered?i ...I • Pre-Reoevelopment Land Cover(acres) ___I A Solis 8tolls CSoils I)Soils Totals forest/Open Space lanes)-undlstumed, 0.00 protected forest/open span or reforested lend _ Mamged Turf(sore)-disturbed,graded for yards or other turf to be mowed/managed 0.55 0.55 Inmarvbua Cosa(urn) 0 39 0.39 0.94 Post-Development Land Cover(acres) A Salle 8Solls CSolb USoils ( Totals Faert/Open Spate(acres)-undisturbed, 0.00 protected forest/open spaceor reforested land Managed Turf(aoeas)-disturbed,graded for yards or other turf to be mowed/managed 0.46 0.46 • 1 .Impervious Cow 0.48 0.48 I. ......wr Area Check OK, OK. OK OR 0.94 Constants Runoff CaaTfidante(Rv) Annual Rainfall(inches) 43 ASoh BSelis CSolis 0Solis Target Rainfall Event(Inches) too _forest/DP.5We 0.02 0A3 0.04 0.05 ill _---. Total Phosphorus DTP)EMC(mg/LI 0.26 Managed Turf 0.15 0.20 0.22 0.25 -- Total Nitrogen MO HNC inWL) 1.86 Impervious Cover 0.95 0.95 0.95 0.95 = _ Target Tv Load llb/screM( 0.41 __ Pjluntess correction factor) D.90 • LAND COVER SUMMARY--PRE-REDEVELOPMENT LAND COVER SUMMARY-POST DEVELOPMENT I_ Land Cover Summary-Pre Land Cover Summery-Post(Final) Land Cover Summary-Post Land Cover Summary-Post Pre-ReDevebpment Listed Adjusted' Post ReDev.B New Impervious Post-ReDevelopment Post-Development New Impervious Pores/Open Span Cover lanes) 0.00 0.00 Forest/Open Span 000 Forest/Open Space 000 Cover(acres) <over Octet) Weighted Rvlforestl 0.00 0.00 Weighted ev(forea) 0.00 Weighted Rvllorestl 0.00 • %Fares) 0% 0% %forca 0% %Forest OS Managed Turfeowrlaaesl 0.55 046 Managed TurfCover 0.46 Managed Turf Cover • 0.46 • Dm.) .._)goes)... Weighted Rulttn0 0.20 0.20 Weighted Rv(turf) 0.20 Weighted Rv ltuS? 0.20 -%Managed Turf 59% 54% %Managed Turf 49% %Managed Tud 54% 'V Impervious Cover lames) 0.39 0.39 Impervious Cover(acres) 0.48 Re0lv.Impeeous 039 New impervious Covrr 009 Cover)gals) )acr.) RNlmpervious) 0.95 0.95 Rvlmpervbusl 0.95 thlimpehous) 0.95 Relimperviousi 0.95 %Impervious 41% 46% %Impervious 51% %Impervious 46% Total Site Mee(amasl 0.94 0,85 Flael mess,.lanes) 0.94 Total Rnoev.Ste Area 0.85 - ...._.__)ate) .ys Site Re 0.51 0.54 Fkel Past NW She Re 0.51 Ridley Site Rv 0.54 Treatment Volume and Nutrient Load Treatment Volume and Nutrient Load Pre-0 or Ispmeet Treatment Volume Final Post-DevelopmentP t Re0evelapmenl r•Developmrnt I'. lam-h) 0.0400 0.0385 Treatment Volume 0.0457 Treatment Volume 0.0385 T eatmem Volume 0.0071 )acre-ffl latre.hI I last.-n) Pre-ReDevebpment Treatment Volume Final Post-Development PoshoeDevebpment Post.Develoament I.. (cubic leer) 1,744 1,679 Treatment Volume 1,989 Treatment Volume 1,679 l Treatment Volume(cubic 310 _ (cask feet) (cubic feed feet) Final Post- Post-Reoeveb meet Pre-Re Development TP Load I LC I Post-Development TP (Ib/yr) 1.10 1.05 Development TP Load 1.25 lb/frre) 1.0S f 0.20 (Ib/Yr) Ilb/Yrl' Load OWvrl weReDevebPmem TP toad per acre • N rot0 parapmeni lr PmI.RaDevri,ar,enr r:. (proem/vrl IV 124 load per acre 1.33 load per u:e 1.24 (16/..6/1 (le/aaekr) BaselinelP Load(lb/yrI 1 Max.Reduction Required (S41lba/0ae/nr applied topre-redetebpment area exhelingcm,,'rn. 0.35 (Below Pre- t0% land proposed to!new Impervious cover) Re Development mad) 'Ad/ushdlono Lover lo:nmory TP Load reduction TP Load Reduction Pre ReDevelopment fond cover minus pervious lord Dover(/aresVoven saace or Required for 0.11 Required for New 0.36 monoaedroriloceege proposed for new Impervious cover. Redeveloped Area Impervious Area(Ib/yr) iiehid Adjusted total acreage is wnsishnt MO Post-ReOevNapment wedge Imnnus Doreoue ------ '- of new impervious Dover). Column I oomvs load reduction reporienrenl for new impecviovs cover(bused on new • developmenr load limit,0.41 Ibs/ure/year) Post-Development Requirement for Site Area TP Load Reduction Required(Ib/yr) 0.26 Site Results (Water Quality Compliance) Area Checks D.A.A D.A.B D.A.C D.A.D D.A.E AREA CHECK FOREST/OPEN SPACE(ac) 0.00 0.00 0.00 0.00 0.00 OK. IMPERVIOUS COVER(ac) 0.00 0.00 0.00 0.00 0.00 OK. IMPERVIOUS COVER TREATED(ac)_ 0.00 0.00 0.00 0.00 0.00 OK. MANAGED TURF AREA(ac) 0.00 0.00 0.00 0.00 0.00 OK. MANAGED TURF AREA TREATED(ac) 0.00 0.00 0.00 0.00 0.00 OK. AREA CHECK I OK. OK. I OK. OK. OK. 1 Site Treatment Volume(ft3) 1,989 Runoff Reduction Volume and TP By Drainage Area D.A.A D.A.B D.A.C I D.A.D l D.A.E I TOTAL RUNOFF REDUCTION VOLUME ACHIEVED(ft3) 0 0 0 0 0 0 TP LOAD AVAILABLE FOR REMOVAL (Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TP LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TP LOAD REMAINING (Ib/yr) 0.00 0.00 0.00 0.00 j 0.00 ft 0.00 NITROGEN LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 1 0.00 0.00 0.00 0.00 0.00 Total Phosphorus FINAL POST-DEVELOPMENT TP LOAD(Ib/yr)1 1.25 _ TP LOAD REDUCTION REQUIRED(Ib/yr) 0.26 TP LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 TP LOAD REMAINING(Ib/yr): 1.25 REMAINING TP LOAD REDUCTION REQUIRED(Ib/yr): 0.26 Total Nitrogen(For Information Purposes) POST-DEVELOPMENT LOAD(Ib/yr) 8.94 NITROGEN LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 REMAINING POST-DEVELOPMENT NITROGEN LOAD(Ib/yr) 8.94 _ - Virginia Runoff Reduction Method Water Quality Calculations for ReDevelopments The following VRRM water quality calculations for ReDevelopments are for the proposed amendment. These calculations show the PROVIDED phosphorous removal rate. The credit shown in the following VRRM calculations is achieved through the proposed best management practice of preserving open spaces. This credit exceeds the minimum REQUIRED phosphorous removal rate previously shown within this report. DEQ Virginia Runoff Reduction Method Re-Development Compliance Spreadsheet-Version 3.0 E 2011 BMP Standards and Specifications 02013 Draft IMP Standards and Specifications • .......................__.. - data Input cells Project Name: Peabody-Amendment's Provided Water Quality Treatment CLEAR ALL _ Date: 4/22/2019 constant values Linear Development Project? No calculation calk Site Information • Real re5ula .--- Post-Development Project(Treatment Volume and Loads) Enter Total Disturbed Area(acres) - 0.86 Check: _ IMP Design Specifications List:2011 Stds&Specs •__ Maximum reduction required: rdi �_ Linear project? No The site's net increase in impervious cover(acres)is:r '0. Land cover areas entered correctly? d Post-Development TP LOW Reduction for Site((b/yr):Il Total disturbed area entered? ve TP LOAD REDUCTION NOT REQUIRED Pre-ReDevelopment Land Cover(acres) Atolls B Sous C Sons 05oils Toteb Forest/Open Span leans)-undisturbed, -- - protected forest/open space or reforested land 0'00 Managed Tod leans)-disturbed,graded for . yards or other turf to be mowed/managed 0.75 0.75 I _ _ Impervious Cover(saes) 0.00 0.75 _ Post-Development Land Cover(acres A Soils BSails CSob Dsalk Totals Forest/Open Stsace hires)-undisturbed. • protectedforest/open space or reforested land 0.75 0.75 Meneged Turf(scree)-disturbed,graded for yards or other write be owed/managed 0'00 -..._. ... _ III - _........._..._ ........_._._ ..._..._.-..-... impervious Cover(wee) 0.00 _... - -_ Area Check OK OK OK OK. 0.75 •ion Jopen;pan areas must be protected In accordance with the Virginia euneff Reduction Methodd Constants Runoff Coeffldents(RA) Annual Rainfall(inches) 43 Agana B Soils C Soils D SOUS Target Rainfall Even[Instill 1.00 Forest/Open Span 0.02 0.03 0.04 0.05 Total Phosphorus(TP)EMClnsg/L) 0.26 _ Managed Turf 0.15 0.20 0.22 0.25 Total Nitrogen(TN)ERIC(mg/L) 1.86 impeMous Cover 0.95 0.95 0.95 0.95 Target TP Load lib/acre/Tr) OAI Nlunxkss Lorremon factor) 0.90 II • LAND COVER SUMMARY--PRE-REDEVELOPMENT LAND COVER SUMMARY--POST DEVELOPMENT Land Cover Summary-Pre Land Cover Summery-Past(Final) Land Laver Summary-Post Lond Cover Summary-Post Pre-ReDevelopment Usted Adjusted' Post ReOev.a New impervious Post-ReDevebpmem Post.Devrlopment New Impervious - - ForesVOpen Space Cover(acres) 0.00 0.00 Forest/Open Space 0.75 Forest/Open Space 0.75 - Cover(acres) Cover(acres) Weighted Rvllarest) 0A0 0,00 Weighted Rvl/orest) 0.05 Weighted Rvltorest) 0.05 %Forest 0% 0% %Forest 100% %forest 100% Managed Turf Cover(acres) 0.75 0.75 Managed Turf Cover 0.00 Managetl Tod Cover 0.00 lures) ]acres) Weighted Rvlturq 0.25 0.25 Weighted Re(turfi 0.00 Weighted Rvlturf) 0.00 %Managed Turf 100% 100% � %Managed Turf 0% _-- %Managed Turf 0% ' ImpeMous Cover(acres) 0.00 0.00 Impervious Cover(acres) 0.00 e0000tmpervous 0.00 New lmPervoas Cover 0.00 Cover(zaesl laces; ev(ImpeMous) 0.95 0.95 Rs1impervlous) 0.95 N./impervious) 0.95 .(m -nenloazl ppervious 0% %Impervious 0% %Ito eMous 0% 0% %Ito - --Tat]Site A lacteal 0.75 0.75 al be Arta keres) 0.75 Trial ReDev.She Area Ana We 0.75 _ (acres) Sk.M 0.25 0.25 Motel Post Oev She M 0.05 Remy Pt.Rv 0.05 Treatment Volume and Nutrient Load Treatment Volume and Nutrient Load Pre-ReDevelopmenlTreatmem VolumeFinal Post-Development Post-ReDevelopment Post-Development lucre-fc) 0.0156 0.0156 Treatment Volume 0.0031 Treatment volume 0.0031 Trat m enr Volue - laae-nl atrc-nl (ass-n) Pre-ReDovebpment Treatment Volume Final Post-DevelopmentPost-ReDevelopment Post-Development lade feet) 581 681 Treatment Volume 136 Treatment volume 136 Treatment Volume(cubic - (eubk feet) (cubic feet] & feet/ Pre-ReDevelopment TP load final Post- Post ReDevebpment P 0.43 0.43 Devebpment TP toad 0.09 Load(TP) 0.09 o0eperopment TP - (Ib/yr) & I Load lb/yri (Ib/Yr) (Ib/yri' pre-Re TP Load nr Mre Finalost-Development Tr n rot .t �f1 Ala/aae/yrl 0.57 0.57 toad per acre 0.11 toad 0..,ar, 0.11 (b/.../ril go/acre/0 Baseline TP Load Ilb/yrl Max.Reduction Required IoA11bs/acre/rr aretsd to pre-redevelopment area excluding toc::_ 031 • (Below Pre- SP% tend proposed for new Impenco n coven Renevelopmem Leedl r Adjusted fond Cover Summary: TP Load Reduction Pre Osoro lopmenirab cover m,nvs pervious loop cover gprnVopenspore or Required for TP Load Reduction 'noncom,toll acreage proposed for new Impervious cover. Redeveloped Area -0.30 Required for NBW 0 lib/yri Impervious Area(Ib/yr) Adjusted royal acreage is consistent with Post-000eoe10pmeni orient/minus acreage - of new impervious cover). Column I thaws load reduction requriement for new MOP/WO.cove.(based M new devebement bad limit,DA1 lbs/orie/year! 1 Post-Development Requirement for Site Area TP Load Reduction Required(Ib/Yr) -0.30 '• Site Results (Water Quality Compliance) Area Checks D.A.A D.A.B p D.A.C D.A.D D.A.E AREA CHECK FOREST/OPEN SPACE(ac) 0.00 0.00 0.00 0.00 0.00 OK. IMPERVIOUS COVER(ac) 0.00 0.00 0.00 0.00 0.00 OK. IMPERVIOUS COVER TREATED(ac) 0.00 0.00 0.00 0.00 0.00 OK. MANAGED TURF AREA(ac) 0.00 0.00 0.00 0.00 0.00 OK. MANAGED TURF AREA TREATED(ac) 0.00 0.00 0.00 0.00 0.00 OK. AREA CHECK L OK. OK. OK. OK. OK. J Site Treatment Volume(ft3)l 136 Runoff Reduction Volume and TP By Drainage Area I D.A.A I D.A.B D.A.C D.A.D D.A.E TOTAL RUNOFF REDUCTION VOLUME ACHIEVED(ft3) 0 0 0 _ 0 0 0 TP LOAD AVAILABLE FOR REMOVAL (Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TP LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 TP LOAD REMAINING (Ib/yr) 0.00 0.00 0.00 0.00 0.00 0.00 NITROGEN LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 I 0.00 0.00 0.00 I 0.00 I 0.00 Total Phosphorus FINAL POST-DEVELOPMENT TP LOAD(Ib/yr) 0.09 TP LOAD REDUCTION REQUIRED(Ib/yr) -0.30 TP LOAD REDUCTION ACHIEVED (Ib/yr) 0.00 TP LOAD REMAINING(Ib/yr): 0.09 REMAINING TP LOAD REDUCTION REQUIRED(Ib/yr):I 0.00 I** **TARGET TP REDUCTION EXCEEDED BY 0.3 LB/YEAR** Total Nitrogen(For Information Purposes) POST-DEVELOPMENT LOAD(Ib/yr)1 0.61 NITROGEN LOAD REDUCTION ACHIEVED (Ib/yr)_ 0.00 REMAINING POST-DEVELOPMENT NITROGEN LOAD(Ib/yr) 0.61 I SCS TR-55 Calculations (Treatment Provided via an Underground Detention System) Soils Mapping (Source: NRCS Web Soil Survey Online Database) is VIA �•7 1 I 1 I I t.i, Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Albemarle County, Virginia (VA003) Map Unit Map Unit Name Acres Percent of Symbol in AOI AOI 21C Culpeper fine 0.3 100.0% sandy loam, 7 to 15 percent slopes Totals for Area of 0.3 100.0% Interest Note: The soils' properties witin this area are predominantly composed of hydrologic type B soils. Precipitation Data (Source: NOAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) Map v x�a� f p CR EI Terrain 6. 'Plih 1!i h!' fi o+ t h a+ C+ R � vl d Ia°j 01' $Utlf�6r Gf r 'lain n a 1r00m N 300ft POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90%CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14,Volume 2,Version 3 PDS-based precipitation frequency estimates with 90%confidence intervals(in inches)' Duratio Average recurrence interval(years) 1 n I I 1 II 2 II 5 II 10 j� 25 II SO II 100 JI 200 JI 500 IL 1000 I 24-hr 3.04 3.68 4.71 5.57 6.84 7.94 9.15 10.5 12.5 14.2 (2.73-3.41) (3.31-4.13) (4.22-5.27) (4.97-6.22) (6.07-7.61) (6.99.8.82) (7.99-10.1) (9.05-116) (10.6-13.8) (11.9-15.7) U.S.Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 2:Runoff Curve Number and Runoff Project: Peabody Amendment Designed By:FGM,PE Date: 4/22/2019 Location: 1232 Stoney Ridge Rd. Checked By:SRC,PE Date: 4/22/2019 Check One: Present X Developed X 1.Runoff curve Number(CN) Cover description CN(weighted)_ Drainage Area Soil name and hydrologic Area Product of CN Calculated'S' (Cover type,treatment,and hydrologic condition;percent CN total product/ Description group(Appendix A) (Acres) x Area Value impervious;unconnected/connected impervious area ratio) total area DA A Impervious Areas 98 0.11 10.9 (Present) 8 Woods in Good Condition 55 0.00 0.0 80 2.56 Lawns in Good Condition(75%+Groundcover) 61 0.11 6.7 DA A Impervious Areas 98 0.19 18.5 (Developed) 8 Woods in Good Condition 55 0.00 0.0 93 0.78 Lawns in Good Condition(75%+Groundcover) 61 0.03 1.9 2.Runoff 1-Year Storm 2-Year Storm 10-year Storm Drainage Area Description Frequency-years 1 2 10 n/a Rainfall,P(24 hour).inches 3.04 3.68 5.57 n/a Runoff,Q-inches 1.26 1.75 3.36 DA A(Present) Runoff,Q-inches 2.27 2.88 4.73 DA A(Developed) U.S. Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 3:Time of Concentration(Tt)or Travel Time(Tt) Project: Peabody Amendment Designed By: FGM, PE Date: 4/22/2019 Location: 1232 Stoney Ridge Rd. Checked By: SRC,PE Date: 4/22/2019 Check One: Present X Developed X Check One: T, X Tt Through subarea DAA DA A Segment ID: (Present) (Developed) Sheet Flow:(Applicable to Tc only) 1 Surface description(Table 3-1) 2 Manning's roughness coeff.,n(Table 3-1 3 Flow length,L(total L< 100)(ft) 4 Two-year 24-hour rainfall,P2(in.) 5 Land slope,s(ft/ft) 6 Compute Tt=[0.007(n*L)0.8]/Pz•s s0.4 Shallow Concentrated Flow: 7 Surface description(paved or unpaved) 8 Flow Length, L(ft) 9 Watercourse slope,s(ft/ft) 10 Average velocity,V(Figure 3-1)(ft/s) 11 Tt=L/3600*V Channel Flow: 12 Cross sectional flow area,a(ft2) 13 Wetted perimeter, Pb, (ft) 14 Hydraulic radius,r=a/P,„,(ft) 15 Channel Slope,s(ft/ft) 16 Manning's Roughness Coeff, n 17 V=[1.49r213s05]/n 18 Flow length,L(ft) 19 Tt=L/3600*V 20 Watershed or subarea Tt or Tt (Add Tt in steps 6,11 and 19) 0.10 0.10 U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 4:Graphical Peak Discharge Method Project: Peabody Amendment Designed By: FGM, PE Date: 4/22/2019 Location: 1232 Stoney Ridge Rd. Checked By: SRC, PE Date: 4/22/2019 Check One: Present X Developed X Drainage Area Drainage Area Drainage Area 1. Data Description Description Description DAA DA A (Present) (Developed) Drainage Area (Am) in miles2= 0.0003 0.0003 1 Runoff curve number CN= 80 93 Time of concentration(Tc)= 0.10 0.10 Rainfall distribution type= II II Pond and swamp areas spread 0 0 throughout the watershed= 2. Frequency-years 1 2 10 1 2 10 3. Rainfall, P (24 hour)-inches 3.04 3.68 5.57 3.04 3.68 5.57 4. Initial Abstraction, la-inches 0,51 0.51 0.51 0.16 0.16 0.16 5. Compute la/P 0.17 0.14 0.09 0.05 0.04 0.03 6. Unit peak discharge,Qu-csm/in 975 1000 1000 1000 1000 1000 7. Runoff,Q from Worksheet 2-inches 1.26 1.75 3.36 2,27 2.88 4.73 8. Pond and Swamp adjustment factor, Fp 1 1 1 1 1 1 9. Peak Discharge,Qp-cfs Routed Through the where Qp=Qu Am Q Fp 0.42 0.60 1.15 UGD System WATERSHED SUMMARY (Using a 3" Low-Flow Orifce) 1-year Flow, 10-year Flow, CN Area,ac. cfs 2-year Flow,cfs cfs DA A(Present) 80 0.22 0.42 0.60 1.15 DA A(Developed) 93 0.22 0.28 0.52 1.10 WATERSHED SUMMARY (Using a 2- 1/3" Low-Flow Orifce Meeting Minimum 9VAC25-870-66 Requirements) CN Area,ac. 1-year Flow, 2-year Flow,cfs 10-year Flow, DA A(Present) 80 0.22 0.42 0.60 1.15 DA A(Developed) 93 0.22 0.19 0.22 0.97 Post-Development Routing Calculations (Using a 2-1/3" Low-Flow Orifice) The following routing calculations show compliance with 9VAC25-870-66 minimum requirements. These routing calculations are for a 115' long 36" Underground Detention System and meet minimum channel protection requirements via subsection B.3.a (Energy Balance) with a limits of analysis set via subdivision 3 (Energy Balance). The flood protection requirements are met for this system via subsection C.2.b (10yr. Post-ReDev.< 10yr. Pre-ReDev.) with a limits of analysis set via subdivision C.2.b (10yr. Post-ReDev.< 10yr. Pre-ReDev.). Peabody- Underground Detention System Routings- EB BasinFlow printout INPUT: Basin: Peabody- Underground Detention System Routings Meeting Energy Balance Flow 0 Contour Areas Elevation(ft) Area(sf) Computed Vol. (cy) 1 Storage Pipes Storage pipe 0 name: UGD Piping diameter (in) 36.000 length (ft) 115.000 invert (ft) 444.000 angle 0.287 volume (cy) 30.107 Start_Elevation(ft) 444.00 Vol. (cy) 0.00 5 Outlet Structures Outlet structure 0 Orifice name: Low-Flow Orifice area (sf) 0.030 diameter or depth (in) 2.330 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 444.000 multiple 1 discharge into riser Page 1 Peabody- Underground Detention System Routings- EB Outlet structure 1 Orifice name: Barrel area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 443.900 multiple 1 discharge out of riser Outlet structure 2 Orifice name: Emergency Spillway Simulation area (sf) 0.423 diameter or depth (in) 8.810 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 446.670 multiple 1 discharge into riser Outlet structure 3 Orifice name: Emergency Bypass Pipe area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 445.500 multiple 1 discharge out of riser Outlet structure 4 Weir name: Proposed MH-1 diameter (in) 48.000 side angle 0.000 coefficient 3.000 invert (ft) 453.750 multiple 1 discharge into riser Page 2 Peabody- Underground Detention System Routings- EB 3 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr. 24-hr Peak SCS Storm Event Area (acres) 0.220 CN 93.000 Type 2 rainfall, P (in) 3.040 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 0.640 peak time (hrs) 11.917 volume (cy) 67.757 Hydrograph 1 SCS name: 2-yr. 24-hr Peak SCS Storm Event Area (acres) 0.220 CN 93.000 Type 2 rainfall, P (in) 3.680 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 0.812 peak time (hrs) 11.917 volume (cy) 85.978 Hydrograph 2 SCS name: 10-yr. 24-hr Peak SCS Storm Event Area (acres) 0.220 CN 93.000 Type 2 rainfall, P (in) 5.570 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 1.328 peak time (hrs) 11.917 volume (cy) 140.631 Page 3 Peabody- Underground Detention System Routings- EB OUTPUT: Routing Method: storage-indication Hydrograph 0 Routing Summary of Peaks: 1-yr. 24-hr Peak SCS Storm Event inflow (cfs) 0.637 at 11.92 (hrs) discharge (cfs) 0.192 at 12.08 (hrs) water level (ft) 445.914 at 12.10 (hrs) storage (cy) 16.644 Hydrograph 1 Routing Summary of Peaks: 2-yr. 24-hr Peak SCS Storm Event inflow (cfs) 0.808 at 11.92 (hrs) discharge (cfs) 0.217 at 12.10 (hrs) water level (ft) 446.410 at 12.10 (hrs) storage (cy) 22.714 Hydrograph 2 Routing Summary of Peaks: 10-yr. 24-hr Peak SCS Storm Event inflow (cfs) 1.322 at 11.92 (hrs) discharge (cfs) 0.973 at 11.98 (hrs) water level (ft) 447.168 at 11.98 (hrs) storage (cy) 29.398 Wed Apr 24 15:18:31 EDT 2019 Page 4 9 VAC 25-870-66 Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land-disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "...the maximum peak flow rate from the one-year 24-hour storm following the land-disturbing activity shall be calculated either.." a. or b." Section B.3.a. In accordance with the following methodology: Q < I.F. * (Q Pre-Developed * RV Pre-Developed)/RV Developed Q Allowed = 0.21 cfs Where the following inputs are used: CN Pre-ReDev.= 80 CN Post-ReDev.= 93 S Pre-ReDev.= 2.56 S Post-ReDev.= 0.78 RV Pre-ReDev.= 1.26 RV Post-ReDev.= 2.27 Q Pre-Developed = 0.42 I.F. = 0.9 Q Developed= 0.19 cfs (Using the smaller theoritical 2-1/3" Low-Flow Orifice) NOTE: Q Pre-ReDeveloped = 0.42 cfs Q Developed = 0.28 cfs (Using a 3" Low-Flow Orifice) Section B.4 Limits of Analysis The analysis terminates at the proposed SWM facility's outfall since subsection B.3.a is met when a smaller orifice is designed. 9 VAC 25-870-66 Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.b.: The point of discharge "releases a postdevelopment peak flow rate for the 10-year 24- hour storm event that is less than the predevelopment peak flow rate from the 10-year 24- hour storm event. Downstream stormwater conveyance systems do not require any additional analysis to show compliance with flood protection criteria if this option is utilized." Section C.3 Limits of Analysis The analysis terminates at the proposed SWM facility's outfall since subsection C.2.b is met. Post-Development Routing Calculations (Using a 3" Low-Flow Orifice) The previously shown routing calculations meet 9VAC25-870-66 requirements. This is a problematic design though due to its small low-flow orifice diameter. That system is prone to standing water, advanced degradation of the pipe, an increased likelihood of joint and subsurface failure and presents an unhealthy breeding ground for disease infested mosquitos. Even with a trash rack the small orifice diameter increases the risk of clogging. To resolve this concern the following routing calculations and the proposed design provides a system with a 3" low-flow orifice. This design is in accordance with the Virginia Stormwater BMP Clearinghouse, where it states "Orifices less than 3 inches in diameter may require extra attention during design to minimize the potential for clogging." The following routing calculations are also for a 115' long 36" Underground Detention System and continue to release Post-ReDevelopment subarea A flows less than Pre-ReDevelopment subarea A flows. Peabody- Underground Detention System Routings BasinFlow printout INPUT: Basin: Peabody- Underground Detention System Routings 0 Contour Areas Elevation(ft) Area(sf) Computed Vol. (cy) 1 Storage Pipes Storage pipe 0 name: UGD Piping diameter (in) 36.000 length (ft) 115.000 invert (ft) 444.000 angle 0.287 volume (cy) 30.107 Start_Elevation(ft) 444.00 Vol. (cy) 0.00 6 Outlet Structures Outlet structure 0 Orifice name: Low-Flow Orifice area (sf) 0.049 diameter or depth (in) 3.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 444.000 multiple 1 discharge into riser Outlet structure 1 Orifice name: Mid-Flow Orifices area (sf) 0.087 diameter or depth (in) 4.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 445.670 multiple 3 discharge into riser Page 1 Peabody- Underground Detention System Routings Outlet structure 2 Orifice name: Barrel area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 443.900 multiple 1 discharge out of riser Outlet structure 3 Orifice name: Emergency Spillway Simulation area (sf) 1.382 diameter or depth (in) 15.920 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 446.250 multiple 1 discharge into riser Outlet structure 4 Orifice name: Emergency Bypass Pipe area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 446.250 multiple 1 discharge out of riser Outlet structure 5 Weir name: Proposed MH-1 diameter (in) 48.000 side angle 0.000 coefficient 3.000 invert (ft) 453.750 multiple 1 discharge into riser Page 2 Peabody- Underground Detention System Routings 3 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr. 24-hr Peak SCS Storm Event Area (acres) 0.220 CN 93.000 Type 2 rainfall, P (in) 3.040 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 0.640 peak time (hrs) 11.917 volume (cy) 67.757 Hydrograph 1 SCS name: 2-yr. 24-hr Peak SCS Storm Event Area (acres) 0.220 CN 93.000 Type 2 rainfall, P (in) 3.680 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 0.812 peak time (hrs) 11.917 volume (cy) 85.978 Hydrograph 2 SCS name: 10-yr. 24-hr Peak SCS Storm Event Area (acres) 0.220 CN 93.000 Type 2 rainfall, P (in) 5.570 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 1.328 peak time (hrs) 11.917 volume (cy) 140.631 Page 3 Peabody- Underground Detention System Routings OUTPUT: Routing Method: storage-indication Hydrograph 0 Routing Summary of Peaks: 1-yr. 24-hr Peak SCS Storm Event inflow (cfs) 0.637 at 11.92 (hrs) discharge (cfs) 0.284 at 12.06 (hrs) water level (ft) 445.573 at 12.06 (hrs) storage (cy) 12.335 Hydrograph 1 Routing Summary of Peaks: 2-yr. 24-hr Peak SCS Storm Event inflow (cfs) 0.808 at 11.92 (hrs) discharge (cfs) 0.524 at 12.04 (hrs) water level (ft) 445.842 at 12.04 (hrs) storage (cy) 15.741 Hydrograph 2 Routing Summary of Peaks: 10-yr. 24-hr Peak SCS Storm Event inflow (cfs) 1.322 at 11.92 (hrs) discharge (cfs) 1.098 at 11.98 (hrs) water level (ft) 446.198 at 11.98 (hrs) storage (cy) 20.194 Wed Apr 24 15:17:39 EDT 2019 Page 4 RECEIVED .0M1 3 7 1°11 COMMUNITY DEVELOPMENT