Loading...
HomeMy WebLinkAboutWPO201700026 Inspection 2019-04-04 Internal Use OnIv ,4/ Dire Received:4 J]G Fee Paid: L'O V �•�,�4 ', ,—� / Recenral by: • 6y i�icy i Intake: Forward 10 Management Analyst 41, � BOND INSPECTION REQUEST APPROVED PLAN# Z(1)/0- d/7- 0 O Oo7lP PROJECT NAME: dlfr4/�,G�iuO27 24T5 31 2,r5 3,R 3, ,q,o Jo7S g9-�/y (As listed on die approved plan)/ This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please check the inspections requested. AVSMP/VESCP Erosion Control,Stortnwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 ❑ Subdivision (roads, drainage, etc.)per Subdivision Ordinance section 14-435 and 14-438; $269 ❑ Water&Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301 11 TOTAL FEES �� COCU Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 Mclntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst- Phone 434-296-5832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: OR REGULAR MAIL ADDRESS: Signature of Owner/Developer /d/22 4'9/ /Print Name Date Revised 7/15/2014,7/2 012 0 1 5,11/3/20I5