Loading...
HomeMy WebLinkAboutWPO201700001 Permit 2016-11-07 Registration Statement _f k'teneral VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10) (Please Type or Print All Information) 1. Construction Activity Operator: (General permit coverage will be issued to this operator. The Certification in Item #12 must be signed by the appropriate person associated with this operator.) Name:SM Charlottesville, LLC Contact:Jeremy Swink Mailing Address:200 Garrett Street, Suite B city:Charlottesville State,VA Zip:22902 Phone:434-975-7445 Email address(if available):SwinkJW@stanleymartin.com; VPDES@anglerenvironmental.com Indicate if DEQ may transmit general permit correspondence electronically: Yes Q No❑ 2. Existing General Permit Registration Number(for renewals only): 3. Name and Location of the Construction Activity: Name. Hollymead Walk Address(if available): 1400 Timberwood Blvd City:Charlottesville State:Virginia Zip:22911 County(if not located within a City):Albemarle Latitude(decimal degrees):38.131782 Longitude(decimal degrees):-78.442452 Name and Location of all Off-site Support Activities to be covered under the general permit: Name:N/A Address(if available): City: State. Zip: County(if not located within a City): Latitude(decimal degrees): Longitude (decimal degrees): 4. Status of the Construction Activity(check only one): Federal El State❑ Public El Private❑✓ 5. Nature of the Construction Activity(e.g.,commercial, industrial,residential,agricultural,oil and gas,etc.): Residential 6. Name of the Receiving Water(s)and Hydrologic Unit Code(HUC): Name: Powell Creek Name: HUC:JR08 HUC: 7. If the discharge is through a Municipal Separate Storm Sewer System(MS4),the name of the MS4 operator: N/A 8. Estimated Project Start and Completion Date: Start Date(mm/dd/yyyy): 1 1/15/2016 Completion Date(mm/dd/yyyy): 1 1/30/2018 9. Total Land Area of Development(to the nearest one-hundredth acre):2.20 Estimated Area to be Disturbed(to the nearest one-hundredth acre):2.20 10. Is the area to be disturbed part of a larger common plan of development or sale? Yes❑✓ No❑ 11. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting this Registration Statement. By signing this Registration Statement the operator is certifying that the SWPPP has been prepared. 12. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: _ cr`nlr., Title: t>,, r o(-- Signature: / Date: IV- (Please(Please sign in I . his Certification must be signed by the appropriate person associated with the operator identified in Item#1.) 01/2014 Page 1 of 1