Loading...
HomeMy WebLinkAboutWPO201900040 VSMP - SWPPP 2019-07-02ALA COUNTY OF ALBEMARLE �oF Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 • Fax (434) 972-4126 e vIRGII`11P Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name: Yancey Lumber VSMP Address: 6317 Rockfish Gap Turnpike Crozet, Virginia 22932 Prepared by: Timmons Group 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 434.295.8317 Prepared for: R. A. Yancey Lumber Corp PO Box 115 Crozet, VA 22932 Contact: Donnie Rose 434.823.4107 SWPPP Preparation Date: July 1, 2019 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM ID Number: CONSTRUCTION ACTIVITIES (VAR10) Technical Criteria: IIB ❑ IIC ❑ REGISTRATION STATEMENT 2019 NEW ISSUANCE NK MODIFICATION WITH ACREAGE INCREASE ❑ Existing Permit Coverage Number (if applicable, VAR10####): Section I. Operator/Permittee Information. RE -ISSUANCE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: R A Yancey Lumber Corp Contact person: Donnie Rose Address: 6317 Rockfish Gap Turnpike City, State, Zip Code: Crozet, VA 22932 Phone Number: (434) 823-4107 Primary Email: donnie@rayanceylumber.com CC Email: B. Billing Information (leave blank if same as the Operator identified in Section I. A. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Name: Contact Person: Address: City, State Zip Code: Phone Number: Primary Email: CC Email: C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by credit card and to receive your permit coverage approval letter via email: YES Z' NO ❑ Rev 04/2019 PAGE 1 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section II. Construction Activity Location Information. Project site information. A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site. B. Construction Activity Name: Yancey Lumber Yard VSMP Address: 6317 Rockfish Gap Turnpike City and/or County and Zip Code: Crozet, VA 22932 Latitude and Longitude (6-digit, decimal degrees format): 38.046958,-78.719081 C. Construction Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): 6317 Rockfish Gap Turnpike, Crozet, VA 22932 Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration may need to obtain coverage under a separate VPDES permit. A. Offsite Activity Name: N/A Address: City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): B. Offsite Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Section IV. Site Information. A. Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest one -hundredth of an acre. Total land area of development (including the entire area to be disturbed as approved in the Stormwater 0.55 Management Plan): Primary estimated area to be disturbed (portions with 0.55 Erosion and Sediment Control Plan approval only): Offsite estimated area to be disturbed (if applicable): N/A C. Property Owner Status: B. Estimated Project Dates (M M/D D/YYYY) Start date: 08/01/2019 Completion date: 10/01/2019 FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE V D. Nature of the Construction Activity Description (i.e. commercial, industrial, residential, agricultural, environmental): Industrial E. Municipal Separate Storm Sewer System (MS4) name (if discharging to a MS4): N/A Rev 04/2019 PAGE 2 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 F. Is this construction activity part of a common plan of development or sale? YES ❑ NO 211, G. 6t" Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed. HUC RECEIVING WATERBODY(S) 02080204 Rivanna Section V. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES &KNO ❑ Erosion and Sediment Control Plan Approval Date (for estimated area to be disturbed).: C. Has land disturbance has commenced? YES ❑ NO L, D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section II. A.): N/A SEE THE FOLLOWING PAGE FOR SIGNATURE AND CERTIFICATION REQUIREMENTS AND INFORMATION Rev 04/2019 PAGE 3 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section VI. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where auth ority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Signature (signed in ink): Date: Section VII. Submittal Instructions. Submit this form to the Virginia Stormwater Management Program (VSMP) Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructionep@deg.virginia.eov If the locality is the VSMP Authority, please send to: fhe Local VSMP Authority (insert address below Rev 04/2019 PAGE 4 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. The following permit actions are covered by this form: new issuance, re -issuance, modification with an increase in acreage and plan modifications that do not result in an increase in acreage. Choose NEW ISSUANCE if this Registration Statement submittal is to obtain a new permit coverage, RE -ISSUANCE to renew an active, expiring permit coverage or MODIFICATION to modify an active permit coverage When modifying permit coverage, indicate if the modification is increasing the amount of acreage previous covered (MODIFICATION WITH ACREAGE INCREASE) or changing the site design with no increase in acreage (MODIFICATION WITHOUT ACREAGE INCREASE). Existing Permit Coverage Number. Provide the permit number for a modification or reissuance (i.e. VAR10####). Section I. Operator/Permittee Information. A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project site that are necessary to ensure compliance with the general permit). If an individual person is named as the operator, that person (or a representative of) must sign the certification in Section VI. An operator can be one of the following: 9VAC25-870-10. Definitions. "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. "Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities, and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates, charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter. "Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state, governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity. B. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they are the same, leave this section blank. C. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also allow the operator to pay by credit card and receive permit coverage approval letters immediately upon approval. Section II. Construction Activity Location Information. Location information related to the project site. A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your Virginia Stormwater Management Program (VSMP) authority if you have additional questions regarding site map requirements. B. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the Stormwater plans), 911 street address (if available), city/county of the construction activity, 6-digit latitude and longitude in decimal degrees format for the centroid, main construction entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W). C. Construction Activity Entrance Location. Provide an address or decimal degrees coordinates and a description of the main construction entrance where the permit coverage letter will be posted. Rev 04/2019 PAGE 5 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT Section III. Offsite Support Activity Location Information. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; (iii) the support activity does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v) appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all applicable state, federal, and local approvals are obtained for the support activity. If requesting permit coverage for offsite activities, please complete this section. List additional offsite areas to be included under this permit coverage on a separate page. Offsite areas not included on this registration will need to obtain coverage under a separate VPDES permit. A. Offsite activity location information. Provide a descriptive offsite project name, 911 street address (if available) and city/county of all off -site support activities. Provide the 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N,-77.1234W). Please note that off -site activities not covered under this permit may require separate permit coverage. B. Offsite activity entrance location. Provide an address or decimal degrees coordinates and a description of the main construction entrance Section IV. Site Information. A. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit coverage (the sum of all on -site and off -site disturbed acreages). B. Estimated Project Dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e. 07/30/2019). C. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e. federal, state or local governments) is PRIVATE. D. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation, Institutional, etc.). Describe the project (i.e. Commercial — one new office building and associated parking and utilities; Transportation — Roads, sidewalks and utilities; Agricultural — 3 Poultry Houses, etc.). E. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city, county, institute or federal facility where the construction activity is located. F. This construction activity is part of a common plan of development or sale. "Common plan of development or sale" means a contiguous area where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-10. Definitions. Le. a subdivision, commercial development, business park, etc. G. 6th Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6th order HUCs and receiving waters for the site and offsite areas that could potentially receive stormwater runoff discharging from this activity. The HUC can be either a 12-digit number (i.e. 0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving waters on a separate page. You may utilize DEQ's web - based GIS application, VEGIS, to obtain this information. • VEGIS application link: DEQ's VEGIS Mapping Application • Instructions for utilizing DEQ's VEGIS application link: CGP-GIS HUC Instructions Rev 04/2019 PAGE 6 17 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT Section V. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See 9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements. B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section IV. A. has been submitted to the Virginia Erosion and Sediment Control Program (VESCP) Authority for review and plan approval, choose YES. If you are submitting this application to reissue an existing permit coverage, please provide the date that the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area to be disturbed. C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading, excavating, or filling of land per §62.1-44.15:24. Definitions. D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that holds the approved annual standards & specification. • AS&S Entity Form link: Annual Standards and Specifications Entity Information Form Section VI. Certification. A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying and signing the Registration Statement. A person must physically sign the certification, a typed signature is unacceptable. State statutes provide for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be signed as follows per 9VAC25-880-70 Part III. K. 1.: a. For a corporation: by a responsible corporate officer. For the purpose of this part, a responsible corporate officer means: (i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively. c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part a principal executive officer of a public agency includes: (i) The chief executive officer of the agency, or (ii) A senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Section VII. Submittal Instructions. Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority may be either DEQ or your locality depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for additional submittal instructions. A blank area is provided for the Local VSMP Authority to include their mailing address. Who is the VSMP Authority for my project? DEQ or the locality? • DEQ: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are: ➢ within a locality that is not a VSMP Authority; ➢ owned by the State or Federal government; or ➢ utilizing approved Annual Standards and Specifications. • The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is available on DEQ's website here: Local VSMP Authority List. DEQ'S CONSTRUCTION GENERAL PERMIT WEBSITE http://www.deg.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGeneraIPermit.aspx Rev 04/2019 PAGE 7 17 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) This project includes the grading of an asphalt roadway adjacent to an existing retaining wall to ensure grades are within the design height limits of the wall. The limits of disturbance are 0.553 acres. These improvements are being made within the property boundary. The property is bounded by Rockfish Gap Turnpike (US 250) to the northwest, Yancey Mill Lane to the southwest, and wooded residential and commercial properties to the south and east. All construction shall take place in accordance with the Erosion and Sediment Control Sequence of Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration Statement. 0 Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, I Ix17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County PROJECT DESCRIPTION THIS PROJECT INCLUDES THE GRADING OF AN ASPHALT ROADWAY ADJACENT TO AN EXISTING RETAINING WALL TO ENSURE GRADES ARE WITHIN THE DESIGN HEIGHT LIMITS OF THE WALL. LIMITS OF CLEARING AND GRADING ARE 0.55 ACRES. ADJACENT PROPERTY THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY BOUNDARY. THE PROPERTY IS BOUNDED BY ROCKFISH GAP TURNPIKE (US 250) TO THE NORTHWEST, YANCEY MILL LANE TO THE SOUTHWEST, AND WOODED RESIDENTIAL AND COMMERCIAL PROPERTIES TO THE SOUTH AND EAST. EXISTING SITE CONDITIONS THE SITE IS CURRENTLY THE LOCATION OF YANCEY LUMBER YARD. OFF -SITE AREAS NO OFFSITE AREAS SHALL BE DISTURBED AS PART OF CONSTRUCTION. CRITICAL EROSION AREAS THERE ARE NO CRITICAL SLOPES WITHIN THE PROJECT AREA. EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION. STORMWATER RUNOFF CONSIDERATIONS NO NEW IMPERVIOUS SURFACE IS BEING ADDED AS PART OF THIS PROJECT. PRE -DEVELOPED FLOWS WILL BE MAINTAINED OR REDUCED. STORMWATER RUNOFF CONSIDERATIONS ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND THE CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS. STRUCTURAL PRACTICES: 1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. 2. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIMENT BARRIERS SHALL BE INSTALLED DOWNSLOPE OF AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT SEDIMENT FROM LEAVING THE SITE. 3. STORM DRAIN INLET PROTECTION - 3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL DRAINAGE STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION. 4. CULVERT INLET PROTECTION - 3.08 A SEDIMENT FILTER LOCATED AT THE INLET TO A CULVERT TO PREVENT SEDIMENT FROM ENTERING THE SYSTEM PRIOR TO PERMANENT STABILIZATION. S. DUST CONTROL - 3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO SURFACE AND AIR MOVEMENT. VEGETATIVE PRACTICES: 1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. 2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED. 3. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL BEAUTY. MANAGEMENT STRATEGIES 1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING SEED AND MULCH IMMEDIATELY FOLLOWING INSTALLATION. 2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. 3. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDERTO MINIMIZE PERIMETER CONTROLS. 4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT DOCUMENTS OR STATE LAW. PERMANENT STABILIZATION ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC. 3.32 PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS" AND "GENERAL SLOPES " IN THE HANDBOOK FOR SLOPES LESS THAN 3: 1. FOR SLOPES GREATER THAN 3: 1, SEED TYPE SHALL BE AS SPECIFIED FOR "LOW MAINTENANCE SLOPES" IN TABLE 3.32-D OF THE HANDBOOK. FOR MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED, FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING. SEQUENCE OF INSTALLATION 1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR, CONTRACTOR, OWNER, AND ENGINEER. THIS MEETING SHALL TAKE PLACE ON -SITE. CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1) WEEK OF NOTICE. 2. INSTALL PAVED CONSTRUCTION ENTRANCE AND INLET PROTECTION. 3. AFTER ALL EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE, SITE WORK CAN BEGIN. 4. ROUGH GRADE PROJECT AREA. 5. SEED ALL DENUDED AREAS PER VESCH STANDARDS. 6. FINE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS ACHIEVED. 7. ALL STORMWATER PIPING & STRUCTURES, INCLUDING DETENTION FACILITIES SHALL BE INSPECTED FOR SILT/SEDIMENT. IF PRESENT, SILT/SEDIMENT SHALL BE CLEANED OUT FOR THE SYSTEM TO THE SATISFACTION OF THE E&S INSPECTOR. '- S. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION 2 CONTROL MEASURES CAN BE REMOVED UPON APPROVAL FROM THE E&S INSPECTOR. Y ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND DISTURBANCE. ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE. ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE) ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY. MINIMUM STANDARDS: AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4. SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. MS-6. SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. B. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A 25-YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS- 16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SITE PROPERTY. D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION, E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA LISTED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, CHAPTER 8 PAGES 20-24. SOILS INFORMATION: 7B - BRADDOCK LOAM, 2 TO 7 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC SOIL GROUP: B 19B - CULLEN LOAM, 2 TO 7 PERCENT SLOPES, 60 TO 120 INCHES TO BEDROCK RESTRICTIVE FEATURES, WELL DRAINED, HYDROLIC SOIL GROUP: B 36B - HAYESVILLE LOAM, 2 TO 7 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC GROUP: B 36C - HAYESVILLE LOAM, 7 TO 15 PERCENT SLOPE$, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC GROUP: B 37C3 - HAYESVILLE CLAY LOAM, 7 TO 15 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC GROUP: B 37D3 - HAYESVILLE CLAY LOAM, 15 TO 25 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED, HYDROLOGIC GROUP: B 88 - UDORTHENTS, LOAMY, 2 TO 25 PERCENT SLOPES, MORE THAN 80 INCHES TO RESTRICTIVE FEATURES TABLE 3.31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS" PLANTING DATES SPECIES RATE (LBS./ACRE) SEPT. 1 - FEB. 15 50150 MIX OF ANNUALRYEGRASS (LOLIUM MULTI-FLORUM) & 50-100 CEREAL (WINTER) RYE (SECALE CEREALE) FEB. 16-APR. 30 ANNUALRYEGRASS 60-100 (LOLIUM MULTI-FLORUM) MAY 1 -AUG. 31 GERMAN MILLET 50 (SETARIA ITALICA) 8 3.31 NO Scale TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA TOTAL LBS. PER ACRE MINIMUM CARE LAWN COMMERCIAL OR RESIDENTIAL 175-200 LBS. KENTUCKY 31 OR TURF -TYPE TALL FESCUE 90-100% IMPROVED PERENNIAL RVEGRASS 0-5% KENTUCKYBLUEGRASS 0-5% GENERAL SLOPE (3:1 OR LESS) KENTUCKY 31 FESCUE 128 LBS. RED TOP GRASS 2 LBS. SEASONAL NURSE CROP20 LBS. 111 LBS. LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) KENTUCKY 31 FESCUE 108 LBS. RED TOP GRASS 21 BS. SEASONAL NURSE CROP' 20 LBS. CROWNVETCH " 20 LBS. 15D LBS. ' USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW. FEBRUARY 16TH THROUGH APRIL.................................. ANNUAL RYE MAY 18T THROUGH AUGUST 15TH ............................ FOXTAIL MILLET AUGUST 16TH THROUGH OCTOBER ............................... ANNUAL RYE NOVEMBER THROUGH FEBRUARY 15TH........................ WINTER RYE "SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA). IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INOCULATED. WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW -MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10-20 LBS./ACRE IN MIXES. PS s rOnE ]0' MIN. O,:ALTH op CONSTRUCT ON � A;;CE:,� 3^ SM-2A ASPHALT TOP COURST �LXIS'ING O� 'y 27 'PAVFMrNT UN 1THAXM. 5HOWALTER� I.¢. N,, 0402,057131 6" MN 1'A AGCREGAIE BASKPROFIL F" l r`slf1N A L ��C PGN+U'. tIJN rC` ASPHALT PAVE) �+ WASHRACK p o I 1% E%IST.NC I 2% PAVFVFNT= j E 12' M'. N.' __ w CE T2% �u vi LLi; 3 EMUS- E FN L'_ t41_TF -POSITVr DRA,NAGIF TO SEDIMENT w G 1p 6 J u m 2 IAN] GRESS OF NGRESSSS E OPERATION 1 TRA'�PtNG OrvlCr - O PLAN zW� d 3 O N u 06� z �IP Ulv-MUSTI w� 0 TO E'i','_' '_- IHA N� FV o N Lo av � rILTCR ^LL' L- SECTION A -A A ewwtuml wata tap of I inch nmst be installed with a nliummu 1 inch ba8cock slndoff o•ahre supplyvng a wash hose with a <hamete of 1. itches for adequate o conetant preslu Nash wata mast be carried away too, the elbelce to as a(aproved seNlins area to reuove seduned..All serilne t sha8 be preceded fronn e to i g storm chains, ditches or wate omses. 0 PAVED WASH RACK o a PAVED CONSTRUCTION ENTRANCE o NO Sple to DATE FaEV tOD SILT FENCE DROP INLET PROTECTION DROP INLET WITH 1. 0710112019 FRAME GRATE O Y DRAWN BY 5 FRAME Z. DAHL f DESIGNED BY IN. /%T] • '� a• • J. SHOWALTER _^ GATHER • CHECKED BY EXCESS AT C. KOTARSKI CORNERS • • PERSPECTIVE VIEWS SCALE STAKE • j^=2Q' FABRIC • II II I c� DETAIL A ELEVATION OF STAKE AND FABRIC ORIENTATIONSPEJ c I = THIS METHOD CINLE THE n THISMETHOD-ATARETPROTECTIONIS APPLICABLE5%) ERERE T EINLEDRAINS A SHEET m RELATIVELYFLAT AREA (SLOPE INGREATER THAN$%)WHERE THEINLETSHEETOR OVERLAND FLOWS (NOT EXCEEDING 1 L.F.S.) ARE TYPICAL. THE METHOD SHALL NOT W IP APPLY TO INLETS RECENING CONCENTRATED FLOWG, SUCH AS IN STREET OR 3.07-1 p HIGHWAY MEDIANS. O O LL STORM DRAIN INLET PROTECTION p n No Scale / i1 BLOCK AND GRAVEL DROP INLET SEDIMENT FILTER �ETE 0 / �JOAR E �BL6CK Lu m SCREE Q 2 r Q>J- > 0 _ Z _ � �o zY v w u O GRAVEL FILTER IJ r T HARE Of SCREEN FILTERED ¢ OVERFLOW WATER W $ RUNOFF WATER _RL DO W m'U WITH YQ N SEDIMENT � J n 5 °cF DROP INLET } p RC SEDIMENT WITH GATE LLJ v m SPECIFIC APPLICATION: THIS METHOD AN INLET PROTECTION IS APPLICABLE U p o11 11MERE SSHEAVY YTO PRE I EXPECTED CESSW PONDIN RE AN AROUND THE STRUCTURE, , 7 z y - IS NECESSARY TO PREVENT E%CESSIVE PONDING AROUND THE STRUCTURE. L IP d CD a z 'GRAVEL SHALL BE VDOT M3, fp5] OR AS COARSE AGGREGATE. � a STORM DRAIN INLET PROTECTION } O F¢ Na Scale , /1 a a 0 II W ea 'Sa III NO. $ u 43929 SHEET NO. ag C3.0 _ F E L p� 2 L' u%%TH1\'N. SHOMLTERT L¢. 1. Oa1,05,61 .SS��NAL ECG\2 Section 5. Stormwater Management Plan (Provide a reduced I Ix17 copy of the latest stormwater management plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County p� 2 L' u%%TH1\'N. SHOMLTERT L¢. 1. Oa1,05,61 .SS��NAL ECG\2 Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced I Ix17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County p�,��nLTy pF` UN ITKWA SHOWMTcx a 1p 04112011111 'sp 7/1/19 �`SSI(TNnL FF��2 its. aources of roiiutants. locations. ana Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures C. Sources of Pollutants continued. Common activities and minimum control and prevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and un- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clearing Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbent/oil dry for all paving machines to limit leaks ands ills Concrete washout shall occur in area Direct concrete wash water into a leak - Concrete washout and adjacent to the construction entrance as proof container or leak -proof settling basin cement waste designated on the Pollution Prevention that is designed so that no overflows can Plan. occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction, stucco, Structures in a flat unpaved area. Prevent the painting, and cleaning discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing compounds. Dewatering if necessary when Water shall be filtered, settled or similarly Dewatering operations converting culvert inlet protection treated prior to discharge as shown on shown on plans plan. Designated areas for material delivery and Material delivery and storage Adjacent to construction entrance and storage. Placed near construction construction trailer. entrances, away from waterways and drainage paths Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Containers have lids covered before periods of rain, or are in a covered Solid waste disposal As provided by contractor area. Scheduled collection to prevent overfilling. MATERIALS NOT TO BE BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be provided, and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better Wash area is located at the construction control as specified on plan. Minimize Wash Waters entrance. Adjacent diversion dike will the discharge of pollutants from divert wash water to sediment trap. e ui ment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all plan wash waters per the plan Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Constituents Location on Site Dust control water Sediment As shown on plan Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Discharge Pollutants or Pollutant Location on Site Constituents E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) Donnie Rose R A Yancey Lumber Corp 6317 Rockfish Gap Turnpike Crozet, VA 22932 434.293.3081 F. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills, leaks and discharges as follows; Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, saw dust, and plastic and metal trash containers. All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash containers for disposal. Report all spills, leaks and discharges as follows; (Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.) Reports will be made to the following: Virginia Department of Emergency Management Emergency Operations Center (EOC) Phone: (800) 468-8892 Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by registered land disturber each time a new E&SC procedure is constructed. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. This site discharges to impaired waters as detailed on the following sheets. Enhanced inspection frequency is required as outlined below: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) Donnie Rose R A Yancey Lumber Corp 6317 Rockfish Gap Turnpike Crozet, VA 22932 434.293.3081 Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification (Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this certification should be the owner of the property, the same signature as appears on the bonds and applications. Another operator can be designated on the delegation of authority form to follow.) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: Company: Title: Signature: Date: Mr. Donnie Rose R A Yancey Lumber Corp 6317 Rockfish Gap Turnpike Crozet, VA 22932 434.823.4107 Donnie Rose R A Yancey Lumber Corp President Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Donnie Rose Company: R A Yancey Lumber Corp Title: Signature: Date: Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 12. Inspection logs INSPECTION FREQUENCY: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County