Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: UVA Research Park Sewer Extension
WPO# 201800091
Address: 4211 Lewis and Clark Drive
Charlottesville, Virginia 22911
Prepared by:
Timmons Group
608 Preston Avenue, Suite 200
Charlottesville, VA 22903
434.295.8317
Prepared for:
University of Virginia Foundation
P.O. Box 400218
Charlottesville, VA 22911
Contact: Todd Marshall
434.924.2569
SWPPP Preparation Date: March 26, 2019
Revised: July 3, 2019
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM ID Number: _
CONSTRUCTION ACTIVITIES (VAR10) Technical Criteria: 1113 ❑ IIC ❑
REGISTRATION STATEMENT 2019
NEW ISSUANCE ❑
MODIFICATION WITH ACREAGE INCREASE ❑
Existing Permit Coverage Number (if applicable, VAR10####):
Section I. Operator/Permittee Information.
RE -ISSUANCE ❑X
MODIFICATION WITHOUT ACREAGE INCREASE ❑
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit).
Construction Activity
University of Virginia Foundation
Operator Name:
Todd Marshall
Contact person:
Address:
P.O. Box 400218
City, State, Zip Code:
Charlottesville, Virginia, 22904
Phone Number:
434-924-2569
Primary Email:
tmarshall@uvafoundation.com
CC Email:
B. Billing Information
(leave blank if same as the Operator identified in Section I. A. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Name:
Contact Person:
Address:
City, State Zip Code:
Phone Number:
Primary Email:
CC Email:
C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by
credit card and to receive your permit coverage approval letter via email:
YES ❑X NO ❑
Rev 04/2019 PAGE 1 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section II. Construction Activity Location Information. Project site information.
A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all water bodies receiving stormwater discharges from the site.
B. Construction Activity Name: Lewis and Clark Drive Sewer Extension
Address: 4211 Lewis and Clark Drive
City and/or County and Zip Code: Charlottesville, VA 22911
Latitude and Longitude
(6-digit, decimal degrees format): 38.146487,-78.43957
C. Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this
permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration may need
to obtain coverage under a separate VPDES permit.
A. Offsite Activity Name:
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit, decimal degrees format):
B. Offsite Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section IV. Site Information.
Rev 04/2019 PAGE 2 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
A. Acreage totals for all land -disturbing activities to be included under this
permit coverage. Report to the nearest one -hundredth of an acre.
Total land area of development (including the entire
area to be disturbed as approved in the Stormwater
455.85 AC
Management Plan):
Primary estimated area to be disturbed (portions with
7.36 AC
Erosion and Sediment Control Plan approval only):
Offsite estimated area to be disturbed (if applicable):
C. Property Owner Status:
B. Estimated Project Dates
(M M/D D/YYYY)
Start date:
3/01/2019
Completion date:
3/01/2020
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE
D. Nature of the Construction Activity Description (i.e.
commercial, industrial, residential, agricultural,
environmental): Utilitv: Sanitary Sewer
E. Municipal Separate Storm Sewer System (MS4)
name (if discharging to a MS4): Albemarle County Service Authority
F. Is this construction activity part of a common plan of development or sale? YES ❑X NO ❑
G. 6th Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed.
HUC RECEIVING WATERBODY(S)
02080204 RIVAN NA
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration
Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared.
B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES ❑X NO ❑
Erosion and Sediment Control Plan Approval Date (for estimated area to be disturbed).:
C. Has land disturbance has commenced? YES X❑ NO ❑
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity
Form. AS&S Entity Name (if different from the Operator identified in Section II. A.):
SEE THE FOLLOWING PAGE FOR SIGNATURE
Rev 04/2019 PAGE 3 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
AND CERTIFICATION REQUIREMENTS AND INFORMATION
Rev 04/2019 PAGE 4 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section VI. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date:
Section VII. Submittal Instructions. Submit this form to the Virginia Stormwater Management Program (VSMP)
Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the
locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructionep@deg.virginia.eov
If the locality is the VSMP Authority, please send to:
fhe Local VSMP Authority (insert address below
Rev 04/2019 PAGE 5 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. The
following permit actions are covered by this form: new issuance, re -issuance, modification with an increase in acreage and plan modifications that
do not result in an increase in acreage.
Choose NEW ISSUANCE if this Registration Statement submittal is to obtain a new permit coverage, RE -ISSUANCE to renew an active, expiring
permit coverage or MODIFICATION to modify an active permit coverage When modifying permit coverage, indicate if the modification is increasing
the amount of acreage previous covered (MODIFICATION WITH ACREAGE INCREASE) or changing the site design with no increase in acreage
(MODIFICATION WITHOUT ACREAGE INCREASE).
Existing Permit Coverage Number. Provide the permit number for a modification or reissuance (i.e. VAR10####).
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over
construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with
a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party
with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project
site that are necessary to ensure compliance with the general permit). If an individual person is named as the operator, that person (or a
representative of) must sign the certification in Section VI. An operator can be one of the following:
9VAC25-870-10. Definitions.
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a
large or small construction activity, operator means any person associated with a construction project that meets either of the following two
criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those
plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance
with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct
workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context
of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
"Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities,
and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or
country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates,
charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other
wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of
state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter.
"Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state,
governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity.
B. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they
are the same, leave this section blank.
C. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all
correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also allow the operator to pay by credit
card and receive permit coverage approval letters immediately upon approval.
Section II. Construction Activity Location Information. Location information related to the project site.
A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances
and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or
topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your Virginia
Stormwater Management Program (VSMP) authority if you have additional questions regarding site map requirements.
B. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the Stormwater plans), 911 street address (if
available), city/county of the construction activity, 6-digit latitude and longitude in decimal degrees format for the centroid, main construction
entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W).
C. Construction Activity Entrance Location. Provide an address or decimal degrees coordinates and a description of the main construction entrance
where the permit coverage letter will be posted.
Rev 04/2019 PAGE 6 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
Section III. Offsite Support Activity Location Information.
This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards,
material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly
related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does
it serve multiple unrelated construction activities by different operators; (iii) the support activity does not operate beyond the completion of the
construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v)
appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all
applicable state, federal, and local approvals are obtained for the support activity.
If requesting permit coverage for offsite activities, please complete this section. List additional offsite areas to be included under this permit
coverage on a separate page. Offsite areas not included on this registration will need to obtain coverage under a separate VPDES permit.
A. Offsite activity location information. Provide a descriptive offsite project name, 911 street address (if available) and city/county of all off -site
support activities. Provide the 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N,-77.1234W). Please note that off -site activities not
covered under this permit may require separate permit coverage.
B. Offsite activity entrance location. Provide an address or decimal degrees coordinates and a description of the main construction entrance
Section IV. Site Information.
A. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest
one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the
Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the
Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support
activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed
acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit
coverage (the sum of all on -site and off -site disturbed acreages).
B. Estimated Project Dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e.
07/30/2019).
C. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e.
federal, state or local governments) is PRIVATE.
D. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may
choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation,
Institutional, etc.). Describe the project (i.e. Commercial — one new office building and associated parking and utilities; Transportation — Roads,
sidewalks and utilities; Agricultural — 3 Poultry Houses, etc.).
E. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or
completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city,
county, institute or federal facility where the construction activity is located.
F. This construction activity is part of a common plan of development or sale. "Common plan of development or sale" means a contiguous area
where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-10. Definitions.
Le. a subdivision, commercial development, business park, etc.
G. 6th Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6th order HUCs and receiving waters for the site and
offsite areas that could potentially receive stormwater runoff discharging from this activity. The HUC can be either a 12-digit number (i.e.
0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving waters on a separate page. You may utilize DEQ's web -
based GIS application, VEGIS, to obtain this information.
• VEGIS application link: DEQ's VEGIS Mapping Application
• Instructions for utilizing DEQ's VEGIS application link: CGP-GIS HUC Instructions
Rev 04/2019 PAGE 7 18
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See
9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements.
B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section IV. A. has been submitted to the Virginia Erosion
and Sediment Control Program (VESCP) Authority for review and plan approval, choose YES. If you are submitting this application to reissue an
existing permit coverage, please provide the date that the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area
to be disturbed.
C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface
that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading,
excavating, or filling of land per §62.1-44.15:24. Definitions.
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form.
If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that
holds the approved annual standards & specification.
• AS&S Entity Form link: Annual Standards and Specifications Entity Information Form
Section VI. Certification.
A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying
and signing the Registration Statement. A person must physically sign the certification, a typed signature is unacceptable. State statutes provide
for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be
signed as follows per 9VAC25-880-70 Part III. K. 1.:
a. For a corporation: by a responsible corporate officer. For the purpose of this part, a responsible corporate officer means:
(i) A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who
performs similar policy -making or decision -making functions for the corporation, or
(ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with
environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather
complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or
delegated to the manager in accordance with corporate procedures.
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part
a principal executive officer of a public agency includes:
(i) The chief executive officer of the agency, or
(ii) A senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency.
Section VII. Submittal Instructions.
Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority may be either DEQ or your locality
depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for
additional submittal instructions. A blank area is provided for the Local VSMP Authority to include their mailing address.
Who is the VSMP Authority for my project? DEQ or the locality?
• DEQ: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are:
➢ within a locality that is not a VSMP Authority;
➢ owned by the State or Federal government; or
➢ utilizing approved Annual Standards and Specifications.
• The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ
as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is
available on DEQ's website here: Local VSMP Authority List.
DEQ'S CONSTRUCTION GENERAL PERMIT WEBSITE
http://www.deg.virginia.gov/Programs/Water/StormwaterManagement/VSMPPermits/ConstructionGeneraIPermit.aspx
Rev 04/2019 PAGE 8 18
Section 1. Registration statement
(Provide a signed completed copy of the DEQ registration statement)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
*Note: Due to the Linear nature of this project, there will not be a receipt of general permit coverage.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 3. Nature of activity
(Provide a detailed narrative of the construction activities. Include or reference a construction schedule
and sequence. Include any phasing.)
This project includes the construction of a new sanitary sewer line and associated site work. Limits of
disturbance is 7.36 acres.
These improvements are being made within the property boundary. The property is bounded by Airport
Road to the south, Dickerson Road and some industrial parcels to the west, the Rivanna River to the
north and Route 29 and some industrial and residential parcels to the east.
All construction shall take place in accordance with the Erosion and Sediment Control Sequence of
Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration
Statement.
0
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
(Provide a reduced, 11x17 copy of the latest Erosion and Sediment Control Plan. Do not reference
only.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
EROSION AND SEDIMENT CONTROL NARRATIVE:
MINIMUM STANDARDS:
GENERAL EROSION AND SEDIMENT CONTROL NOTES:
PROJECT DESCRIPTION
THIS PROJECT INCLUDES THE CONSTRUCTION OF A NEW SEWER LINE AND SITE WORK
LIMITS OF DISTURBANCE IS 7.36 ACRES.
ADJACENT PROPERTY
THESE IMPROVEMENTS ARE BEING MADE WITHIN THE PROPERTY BOUNDARY. THE PROPERTY IS BOUNDED BY
AIRPORT ROAD TO THE SOUTH, DICKERSON ROAD AND SOME INDUSTRIAL PARCELS TO THE WEST, THE
RIVANNA RIVER TO THE NORTH AND ROUTE 29 AND SOME INDUSTRIAL AND RESIDENTIAL PARCELS TO THE
EAST.
EXISTING SITE CONDITIONS
THE SITE IS CURRENTLY MOSTLY WOODED WITH SLOPED TERRAIN AND STREAMS THAT FEED INTO A
WETPOND.
OFF -SITE AREAS
NO OFFSITE AREAS WILL BE DISTURBED AS PART OF CONSTRUCTION UNLESS PERMITTED SEPARATELY.
CRITICAL EROSION AREAS
MANHOLE AND PIPE INSTALLATION IN EXISTING STREAM AND WETLAND AREAS ARE CRITICAL EROSION
AREAS. CONTRACTOR TO USE CAUTION AND PREPLANNING IN COORDINATION WITH ENGINEER AND ESC
INSPECTOR TO MAKE SURE NECESSARY ESC MEASURES ARE IMPLEMENTED AND MAINTAINED CORRECTLY.
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VESCH AND
THE CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS.
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL
PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED
OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING JURISDICTION.
STORMWATER RUNOFF CONSIDERATIONS
THIS PROJECT IS THE LINEAR INSTALLATION OF AN UNDERGROUND SEWER LINE WITH WILL NOT
SIGNIFICANTLY ALTER THE PRE -DEVELOPMENT CHARACTERISTICS AFTER COMPLETION AND FINAL
STABILIZATION. PER DEQ GUIDANCE MEMO No. 15-2003 NO STORMWATER MANAGEMENT IS REQUIRED.
STRUCTURAL PRACTICES:
1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE
PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE
MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD
TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF
2. SILT FENCE BARRIER - 3.05 SILT FENCE SEDIMENT BARRIERS SHALL BE INSTALLED DOWNSLOPE OF
AREAS WITH MINIMAL GRADES TO FILTER SEDIMENT -LADEN RUNOFF FROM SHEET FLOW AS INDICATED.
ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS AND PREVENT
SEDIMENT FROM LEAVING THE SITE.
3. STORM DRAIN INLET PROTECTION - 3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL
DRAINAGE STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM
ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION.
4. DIVERSION DIKE - 3.09 A TEMPORARY RIDGE OF COMPACTED SOIL TO DIVERT WATER FROM A CERTAIN
AREA.
5. DUST CONTROL - 3.39 DUST CONTROL IS TO BE USED THROUGH THE SITE IN AREAS SUBJECT TO
SURFACE AND AIR MOVEMENT.
VEGETATIVE PRACTICES:
1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED
AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND
SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION.
2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30
DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING
GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT
IS APPLIED,
3. PERMANENT SEEDING - 3.32 FOLLOWING GRADING ACTIVITIES, ESTABLISH PERENNIAL VEGETATIVE
COVER BY PLANTING SEED TO REDUCE EROSION, STABILIZE DISTURBED AREAS, AND ENHANCE NATURAL
BEAUTY.
4. SOIL STABILIZATION BLANKETS & MATTING - 3.36 A PROTECTIVE COVERING BLANKET OR SOIL
STABILIZATION MAT SHALL BE INSTALLED ON PREPARED PLANTING AREAS OF CHANNELS TO PROTECT
AND PROMOTE VEGETATION ESTABLISHMENT AND REINFORCE ESTABLISHED TURF.
PERMANENT STABILIZATION
ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING
IMMEDIATELY FOLLOWING FINISHED GRADING. SEEDING SHALL BE IN ACCORDANCE WITH STD. & SPEC.
3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED FOR "MINIMUM CARE LAWNS' AND
"GENERAL SLOPES" IN THE HANDBOOK FOR SLOPES LESS THAN 3:1. FOR SLOPES GREATER THAN 3:1, SEED
TYPE SHALL BE AS SPECIFIED FOR "LOW MAINTENANCE SLOPES" IN TABLE 3.32-D OF THE HANDBOOK. FOR
MULCH (STRAW OR FIBER) SHALL BE USED ON ALL SEEDED SURFACES. IN ALL SEEDING OPERATIONS SEED,
FERTILIZER AND LIME SHALL BE APPLIED PRIOR TO MULCHING.
SEQUENCE OF INSTALLATION
1. APRE-CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E&S INSPECTOR, CONTRACTOR,
OWNER, AND ENGINEER. THIS MEETING SHALL TAKE PLACE AT THE COUNTY OFFICE BUILDING.
CLEARING LIMITS MUST BE FLAGGED PRIOR TO THE MEETING WITH ONE (1) WEEK OF NOTICE.
2. CONTRACTOR SHALL DIVIDE PROJECT AREA INTO WORKING SEGMENTS. ALL STABILIZATION SHALL
OCCUR UPON THE COMPLETION OF EACH SEGMENT. PROJECT SHALL BE MANAGED SO THAT LESS THAN
ONE (1) ACRE OF LAND DISTURBANCE OCCURS ON A DAILY BASIS, IN ACCORDANCE WITH LINEAR
PROJECT REQUIREMENTS.
3. INSTALL TREE PROTECTION, INLET PROTECTION, SILT FENCE, DIVERSION DIKES, AND CLEAN WATER
DIVERSIONS.
4. CLEAR AND GRUB SEGMENT WITHIN LIMITS OF DISTURBANCE.
5. EXCAVATE TRENCH, INSTALL SANITARY SEWER SYSTEM, AND BACKFILL TRENCH.
6. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS
ACHIEVED.
7. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION
CONTROL MEASURES CAN BE REMOVED UPON APPROVAL FROM THE E&S INSPECTOR
AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LOCALITY MUST BE CONSISTENT WITH THE
FOLLOWING CRITERIA, TECHNIQUES AND METHODS:
MS-1. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE
APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN
DORMANT FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE
TO BE LEFT DORMANT FOR MORE THAN ONE YEAR.
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR
PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY
PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS
AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY
STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS
ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4. SEDIMENT TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT
SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL
BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE.
MS-5. STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
MS-6. SEDIMENT TRAPS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE
SERVED BY THE TRAP.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE
AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
MS-7. CUT AND FILL SLOPES SHALL BE DESIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION.
SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL
BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE.
MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE
PROVIDED.
MS-10. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT
SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR
OTHERWISE TREATED TO REMOVE SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL,
ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE
INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL.
MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE
ENCROACHMENT, CONTROL SEDIMENT TRANSPORTAND STABILIZE THE WORK AREA TO THE GREATEST EXTENT
POSSIBLE DURING CONSTRUCTION. NONERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF
CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY
NONERODIBLE COVER MATERIALS.
MS-13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY
SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL
SHALL BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
MS-15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN
ADDITION TO OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT
FLOWING STREAMS OR OFF -SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RESTABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE
MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED
THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED
ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL
DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES.
MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL
SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE
AUTHORIZED BY THE LOCAL PROGRAM AUTHORTTY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS
RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT
FURTHER EROSION AND SEDIMENTATION.
MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT
DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF
STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE
STANDARDS AND CRITERIA LISTED IN SECTION 19 OF VIRGINIA ADMINISTRATIVE CODE 9VAC25-840-40 MINIMUM
STANDARDS.
ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION
AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE
LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA
REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS.
ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND
EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN.
ES-3: PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING,
GRADING, OR LAND DISTURBANCE.
ES-4: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES.
ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS
(INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY
EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT
CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE.
ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND
SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE)
ES-7: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING
LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT.
ES-8: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE.
ES-9: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT.
MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL
DEVICES IMMEDIATELY.
SOILS INFORMATION
4D - ASHE LOAM, 15 TO 25 PERCENT SLOPES, 20 TO 40 INCHES TO RESTRICTIVE FEATURES, SOMEWHAT EXCESSIVELY
DRAINED, HYDROLOGIC GROUP: B
14E - CHESTER LOAM, 25 TO 45 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
15D - CHESTER VERY STONY LOAM, 15 TO 25 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES,
WELL DRAINED, HYDROLOGIC GROUP: B
27B - ELIOAK LOAM, 2 TO 7 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL DRAINED,
HYDROLOGIC GROUP: B
36B - HAYESVILLE LOAM, 2 TO 7 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
36C - HAYESVILLE LOAM 15 TO 25 PERCENT SLOPES GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES WELL
DRAINED, HYDROLOGIC GROUP: B
36D - HAYESVILLE LOAM, 25 TO 45 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
37D3 - HAYESVILLE LOAM, 15 TO 25 PERCENT SLOPES, SEVERELY ERODED, GREATER THAN 60 INCHES TO RESTRICTIVE
FEATURES, WELL DRAINED, HYDROLOGIC GROUP:
39E - HAZEL LOAM, 25 TO 45 PERCENT SLOPES, 20 TO 40 INCHES TO RESTRICTIVE FEATURES, EXCESSIVELY DRAINED,
HYDROLOGIC GROUP: B
47C - LOUISBURG SANDY LOAM, 7 TO 15 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP:A
47D - LOUISBURG SANDY LOAM, 15 TO 25 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES,
WELL DRAINED, HYDROLOGIC GROUP: A
65B - PACOLET SANDY LOAM, 2 TO 7 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
65C - PACOLET SANDY LOAM, 7 TO 15 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
67E - PARKER EXTREMELY STONY LOAM, 25 TO 60 PERCENT SLOPES, 48 TO 80 INCHES TO LTTHIC BEDROCK,
EXCESSIVELY DRAINED, HYDROLOGIC GROUP: A
94B - WEDOWEE SANDY LOAM, 2 TO 7 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
94C - WEDOWEE SANDY LOAM, 7 TO 15 PERCENT SLOPES, GREATER THAN 60 INCHES TO RESTRICTIVE FEATURES, WELL
DRAINED, HYDROLOGIC GROUP: B
Lia No. 0402048507
7103119
00
0
r
0
u
0
0
••
•
z
O
f
f
1210512018
DRAWN BY
A. MABEE
DESIGNED BY
3. SHOWALTER
C. KOTARSKI
SCALE
N/A
z
/O
V 1
W
W
L L_
W
j
U
Z
b
w
r J
Qa
w
am
a
U
oC
w
U)
W
Q
J_
Q
Lu
W
z
Q
ul
LLJ
O
z
J
O
z
O
U
z
W
0
W
L0
0-6
O
L
O
Of
W
JOB NO.
4186400011
C3.0
NOTE: FLUME STREAM
CROSSING SHALL BE
INSTALLED FOR 72
HOURS MAXIMUM.
UUU CI CI UUl
❑ ❑ ❑
STANDARD ORANGE VINYL OR PLASTIC CONSTRUCTION
FENCE ATTACHED TO POSTS (PRE -WEATHERED WOOD,
GALVANIZED STEEL, IRON OR THICK PVC PLASTIC), AT LEAST
40" ABOVE FINISH GRADE WITH SPAN BETWEEN POSTS NO
GREATER THAN VON CENTER. EVERY NINTH POST SHALL
CONTAIN A WARNING SIGN THAT CLEARLY IDENTIFIES THE
FENCE AS A TREE PROTECTION FENCE.
TP NO SCALE 3.38
TREE PROTECTION
No Seale
1. SET THE STAKES.
2. EXCAVATE A 4"X 4' TRENCH UPSLOPE
�H
ALONG THE LINE OF STAKES.
FLow
o 4
3.STAPLE FILTER MATERIAL TO STAKES AND
EXTEND IT INTO THE TRENCH.
I
4. BACKFILLANDCOMPACT THE
EXCAVATED SOIL.
III
SHEET FLOW INSTALLATION
(PERSPECTIVE VIEW)
3'
MAX.
FLOW
A
POINTS A SHOULD BE HIGHER THAN POINT B.
SF DRAINAGEWAY INSTALLATION 3.05-2
O
(FRONT ELEVATION)
No scale
COMPACTED SOIL
CM TO HAVE VDOT
STANDARD EG2
18-IN.
I - f
MATTING ON UPHILL
SIDE
FLOW
DD CWD 4.6'MIN.
3.09
TEMPORARY DIVERSION DIKE
�No ScaleScale
1. SET POSTS AND EXCAVATE A 4"X4- 2. STAPLE WIRE FENCING TO
TRENCH UPSLOPE ALONG THE LINE OF THE POSTS.
POSTS.
6'
X
FLOW I�•
4.
3, ATTACH THE FILTER FABRIC TO 4. BACKFILL AND COMPACT THE
THE WIRE FENCE AND EXTEND IT INTO EXCAVATED SOIL.
THE TRENCH.
0 1FLOjW ry: IIFT
II W
EXTENSION OF FABRIC AND WIRE INTO THE TRENCH.
FILTER FABRIC
WIRE
SSF III �,�II�I �I� 3.05-1 PS
No Scale
TEMPORARY BRIDGE CROSSING
SC
3.24
USC
VEHICULAR STREAM CROSSING
No Scale
(PERSPECTIVE VIEW)
FLOW
COARSE
AGGREGATE**
1'
CLASS 1 RIPRAP
3'
MAX.
(FRONT ELEVATION) —1
NOTE: INSTALL SILT FENCE BREAK AT LOW IN FENCE LINE
**COARSE AGGREGATE SHALL BE VDOT #3 OR #57 STONE
TABLE 3.32-D
SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT
AREA
TOTAL LBS. PER ACRE
MINIMUM CARE LAWN
COMMERCIAL OR RESIDENTIAL
175-200 LBS.
KENTUCKY 31 OR TURF -TYPE TALL FESCUE
90-100%
IMPROVED PERENNIAL RYEGRASS
0-5%
KENTUCKY BLUEGRASS
0-5 %
GENERAL SLOPE (3:1 OR LESS)
KENTUCKY 31 FESCUE
128 LBS.
RED TOP GRASS
2 LBS.
SEASONAL NURSE CROP*
20 LBS.
150 LBS.
LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1)
* SEE SLOPE STABILIZATION SEED MIX
* USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES
AS STATED BELOW:
FEBRUARY 16TH THROUGH APRIL.................................. ANNUAL RYE
MAY 1ST THROUGH AUGUST 15TH ............................ FOXTAIL MILLET
AUGUST 16TH THROUGH OCTOBER ............................... ANNUAL RYE
NOVEMBER THROUGH FEBRUARY 15TH........................ WINTER RYE
*' SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF
FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL
OTHER PERIODS, USE UNHULLED SERICEA). IF FLATPEA IS USED IN LIEU
OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED
MUST BE PROPERLY INOCULATED. WEEPING LOVEGRASS MAY BE
ADDED TO ANY SLOPE OR LOW -MAINTENANCE MIX DURING WARMER
SEEDING PERIODS; ADD 10-20 LBS./ACRE IN MIXES.
No Sale
3.32
AREA
FLUME PIPE CROSSING
i
i
PLAN VIEW w.
— F --
SECTION "A —A" SECTION '�B—B"
3.25
UTILITY STREAM CROSSING
Na Scale
Yd W�n_
PROFILE
oPEunon u� eca+ss � ` Tan =Ne o�•,crT
PUN
Avw f Ivp f I I6 -f BM LI -- u - h6v ck
sivvoff vk Iryn-. hh VI L f - he�f ' A 1 e
e„ren r ,a+a air i o��„
-PAVED WASH RACK
PAVED CONSTRUCTION ENTRANCE
No S.I.
ERNST CONSERVATION SEEDS
RIGHT-OF-WAY NON-NATIVE WOODS MIX - ERNMX-132
BOTANICAL NAME COMMON NAME
PRICE/LB
30.00% FESTUCA RUBRA CREEPING RED FESCUE 1.90
20.00% LOL/UM PERENNE, PERENNIAL RYEGRASS, 1.85
'FASTBALL RGL' 'FASTBALL RGL'
(TURF TYPE)
20.00% PHLEUMPRATENSE, TIMOTHY, 'CLIMAX' 1.20
'CLIMAX'
12.00% TRIFOLIUM HYBRIDUM ALSIKE CLOVER 3.25
10.00% AGROSTISPERENNANS, AUTUMN BENTGRASS, 14.00
ALBANYPINEBUSH- ALBANYPINE BUSH -
NYECOTYPE NY ECOTYPE
8.00% AGROSTISALBA REDTOP 8.00
100 % MIX PRICE/LB BULK: $3.61
SEEDING RATE: 40-60 LB PER ACRE
WOODLAND OPENINGS
THE SHADE -TOLERANT GRASSES AND CLOVER ARE GOOD FOR
WOODLAND OPENINGS AND PARTIALLY SHADED SITES. MIX
FORMULATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE DEPENDING
ON THE AVAILABILITY OF EXISTING AND NEW PRODUCTS. WHILE THE
FORMULA MAY CHANGE, THE GUIDING PHILOSOPHY AND FUNCTION OF
THE MIX WILL NOT.
Lic. No. 0402048507
7103J 19
0
O
s
0
Q
o
0
DATE
1210512018
O
DRAWN BY
A. MABEE
•
DESIGNED BY
•
J. SHOWALTER
•
CHECKED BY
C. KOTARSKI
•
SCALE
N/A
CL
O
J
^
z
W
Lu
p
x
X
[)
O
W
z
Q
Lu
ul
Lu
W
�
0
a
z
>
(LU r
J
-J
O
QQ
w
0
Q
z
_
LLI
�
LL
LLI
Q
O
W
0 -
Ln
z
_O
�w/
LL
LO
Q
LLJ
JOB NO.
41864.001
SHEET NO.
C3.1
L
EROSION CONTROL LEGEND I
— — — — LIMITS OF CONSTRUCTION (7.36 AC) I
SOIL AREA DIVIDE I
I \ \ (k� \ ` ` �.`� \ r / \ \ / \ \ PCE PAVED CONSTRUCTION ENTRANCE 3.02
TMP3 -ljl \ / /r \ \ \\ \ SF X SILT FENCE 3.05 /
GOLD LEAF LAIDD TRUST NO. 3 \ \ 1 II / `I
DB 1745-6961 1 / I j /�\ \ / — I \ '
SUPER SILT FENCE 3.05
/
INLET PROTECTION 3.07 /
CLEAN WATER DIVERSION 3.09
_ %' / / _ _ _ _ _ _ _ _ _ _ _ _ _ SC VEHICULAR STREAM CROSSING 3.24
UTILITY STREAM CROSSING 3.25
= TEMPORARY SEEDING 3.31
PERMANENT SEEDING 3.32
TP TREE PRESERVATION FENCE 3.38
a,,
DUST CONTROLSOIL TYPE:
3.39 '
— 1 I _ \1 , 1
O
- ,
47C �� 'i''= =_�= =,- \ \\ \r 1. ��( 1 I \ ` \\ I �' '�,,�n-. E L•'��� -BREAK - - -�
_-
'- - `'r
SSF
' /1" 1/'� / I / \ I // I - \ \ \ \ 1 l \ I \\ \\ �� \ '/ / ✓ CWD
--__ �-_ - --___
T N
SOIL TYPE, \ w
C C7'448 47C 540,
y1A�CONTRACTORTO CLEgRAND
GRUB OMITS OF DISTURBANCE- v v o
AS - - - - -�
MEASURES ANDIS�WER LINE v "s
2-0 ,a D r,� - 1 r i // r I I 1./ / TS l- ---- ss
DC
V v v �`1 ���� IP -,`�� l l / �I I PS-
V/' V' ' l I
,z43&144AbaZ::�^�
a — — � p'/ ;„.a,l � -' .� \• I \ ( I O / \ 1 EX/ST/NG SEP UMP
- N 588EXISTING SEPTIC T NK
\ JI- _ /ram I / ` EXISTING DOSE
9 \ _ 86'1 P q
/vr,��q �I APPROXIMATE LOCATION
` _ I , � �'aa..,• " - 1 �� I / / H�� OF EXISTING SEPTIC
AzvE PPRdXIMATE- \
ri ti, h / / / I OCATION _-o \VE OMPLE -YrhFLD PER PLANS OM \
�. y PF EXISTING ` � � �' / ENVlR0.K EAN ON Y
UPPLY LINE / / 58? _ 4
_JANUARYo �008
\
5
74,VA
"HYPE.
NTAXWAP 63206-00-00-066Rb 1 �_ , `-_\\\�� 572'
\4
3 I UNIVER\SIFYOFWRGI(f/A EOUXUA'TION , - = b
— I � TDB23i5
B 179-2;2, 2143
WON
SOIL TYPE.'
/'S5 / TAXMAP NAD83 1 \ \
r
47C � / ,' o3zoo-oo-oo-oosRo
UNIVERSITY
/ l \ 1 i \ \ \\ \ \ C �� - �\a�\".�v', /%c moo` `u IP ���•\L/�\ / OF VIRGINIA 1 SCALE I"=5011 \I II
e - I _ _ _ - ` \ \�a� PCE \01 'mil \ l / l FOUNDA7/ON 1 I I { II
" Y - - - - ,mil I DB 2712-325 _
DB 2179-222, 01 50 100 i II
+�. / \ 243&244
4/� vI v PLAT
ETE
:RAIL W J. KOTARSR
Lic. No. 0402048507
710311O
0
s
0
•
Nm
a
z
O
f
f
Ic
0 0
DATE
1210512018
DRAWN BY
A. MABEE
DESIGNED BY
J. SHOWALTER
CHECKED BV
C. KOTARSKI
SCALE
O
Fi
Z
W
X
Lu
Lu
Lu
Y
Q
a
U
Q
w
Lu
LL
D
z
g
J
O
Z
O
U
Z
Lu
Lu
06
z
O
O
ce
Lu
JOB NO,
1864.001
C3.2
EROSION CONTROL LEGEND At,TH
.}7E OF
— — — — LIMITS OF CONSTRUCTION (7.36 AC) I D
—__--------' A w � �v v III 1 I v 1
_ _ _ \ \ \ I \ 1 1 1 1 1 ' / \ - - 1 \ ` \ \ \ 1 SOIL AREA DIVIDE O 7
v v A v v 1 1 I 11 v I I v,` V ` v` v v v 1 I \ U CRAIG W. J. KOTARSKI
_ _ _ \ 1 \ ` ` \ I ` I O Lia No. 0402048507
- I 1 ` / / /I I \ \ ` ` \ \ �\ I \ \ \ \ ` I I I PCE � PAVED CONSTRUCTION ENTRANCE 3.02 710311
1 SILT FENCE 3.05 OSS G
•• �_ I 1 I `\\ I I� __ \ I / I / I \ / PONAl,
SUPER SILT FENCE 3.05
I
r _ `\ I \\ \ , I I r \ _r OIL TYPE: \
- - _ _ _ _ _ - \ _ ` _ - - \ \ \\ \ I \ \ \ I P 2 17/ / \I I1 / I 1 INLET PROTECTION 3.07 n 8
\Cl��/TCkIFIEL`D \ / I \ \ �� / l ® >E
C;ORP. CLEAN WATER DIVERSION 3.09 _ E
w
DB 1028-V071 �I l I _ C` - l
VEHICULAR STREAM CROSSING 3.24 a u o 3
530
_ _ _ _ _ _ _ _ / USC UTILITY STREAM CROSSING 3.25 w w - O w
-52 / TS TEMPORARY SEEDING O
—
\ _ _ 3.31 C .
j' ''_^��/'_ \ \\ w�o��s ��� \`\ �� 111\ _,\1 I \\11 \ `\ \ \\ ���'{��_✓ `I \\ -'-526------- --- — oa ?w oz
\ _
�_ _ _ _ _ -' '-� i �, -' , � i' —� �— \_ � • \ � `' � / `� � \ \ `� ` \ \ \ ` ` , \ � \ ` \ \ 1 _ `,S\O�L _ __ _ _ _ PS PERMANENT SEEDING 3.32 F 2 > O Q
'III ` \ 'S2522-_-_ _ _ _ —TP— TREE PRESERVATION FENCE 3.3
SSF
K�
_
__ DUST CONTROL 3.39
'Sjs .
-
\ m
512514
610
/------- - v �vS ILTYPE: I ____$osr\` v� o
�� -506. A V I I 11 1 1 1 1 III 1 v
47
TS--504'��
\ \ \ \ 81 502
DC l m 1 I I 11 l /II! / -t \" I- I\ \`�\ 500--�-__�\
- - PS _ \ w�\ I / / r r /C / 1 - \ \ �. - , -�___-_-_---49s _
\`\`
Z/ ■ ' 1 I I 1 1 / / / l / \ 1 ., G \ \ - _ — — -492 / I _ _ \ — — 1 I \ \ \ I `\ \ \ Q
4890
--------48-D486-
PS 48 ,\\\\\-\``-_
¢ p
oDATE
w■ V v r o' l I 11 �� '-' I I I 1 1 v v 1 / I I- _ A` V _ r I v v '� 1210512018
v 11 1 v v ( /' , I l I __ -'
SSF / I I I 1 I I I J/ �_
' / / l I I. \ // ` DPAWN BY
w I I _ SOIL TYPE:`
J A. MABEE
n - - 47D, / /,o
CWD - DESIGNED BV
/� � / "-� � � 11 1 I I > A� � \�V `V
SHOWALTER
SILT
- _ _ -572- I \ \ • CHECKED BY
•'.� / I / 1 / / / /�/'1 / (�/ . \ FENCE'-
I \\` _________ i— \= / \ , ` \ _ \ _ ---� - \ — % 1 • C. KOTARSKI
/,1 r 9 • �__- ` I `
/T i' 32�18 / i I \ - \ \ r 1 1 \ 1 - '_ -_ - - \71 = \ = ` - - ' ` - \ \ \� ,. \ . dbORDINATE iNSTALLATION_OF PIPE�18 TET 19 A1JD 51 T - \ _ _\ 1 • SCALE
(I 'T 3 OF / - \ \ I 1 \ _ _ _ _ _ \ 11 _ _ _ _ \� - 19 AN9 STRUCTURE -5 LW(lTH'LFWISAND�LLIRK-0RU[E _ _ _ `' \ ` \ \ - _ _ .508- _ _ •
rno \ I I l \ Vl(iGl""' ` _ _ \ _ _ _ _ _ - \ \ \ SILT _ - - \ _ _ 1_ 1 _ — _ `\ \ - PENSION PROJECT_ FOR €ROSIaN ANP SEDIMENT- '
\ FENCE _ _ A� _ _ _ _ _ .CONTR L, SEA BX M'N_8., U 2 'f6-091 TT O
_ _ _ \ - ` - , - _ _ , _ \ \ \ `\\` _ , \ `Q - _ ` ` \ f81L t5_ 4 \ _ _� �' ` -=. ? DENSE TREES
BREAK ' - \-�
D61802-682.�884 ` \ PLAT. . A ` v v AI SSF v� °A� 0 • J
_ CONTRAgOR TO-C(EAR�AND ` v 1 ` \ v v v ` \ `v` ` `v A I v v� I v V ` - - -� - _ _ ` - _ - - _ .A L
GRUB LIMI OPDISTUREANCE vCWD 1 — v v A , �v A v `v - _ �A 0
AS NECESSARY TO I[NSTALL'ESC \ \ 1 \ _ _ / \ \ \ \ \ \ 1 I I S 7'Y _ �- \ �` 49 O
I �EASURESA AG SEWER LIaE \ I I\ _ % CWD \ SqN�\ \� \/6 -
_ \\
§E�Ei I I r l rFbRI IOSIIN�&ILEykENTC ROOMEASURER
_
`� \, \ OC 4RGAKI. / / I / IA7 LEWIS D LARK!}E.EXT �SK)N, SEE \ r .�►
- _
\ \ \ `� -�,. �_„ \ \ \ I I \ \„ _ — — \ ` / / / r / I AV PLANS. SUB-ODi�'L TL \ `\\\ Lu
% _ z
`� LEWIS�� ,a76---_ �� v ��
bE/I15�g�ES �q18'— �-` V � �'� � � ` � �`4g Q
&i_
y 1 - -_NCE v� L
1 _ 1____ \ 1 I I l l
EA�� v
-- - - -- I,,'I, II,III, l l� /,'/_---- _ __- \ '� II _�,�Z _ O
I ` \ z , I I l ;, 6, l l/ l p V Fh
ear / lIl 111 I �.I /�'', — '-- �sB�
Lu
V ` \ A A i A I / l / / / / / l I I y J b�A � � o y• , Aga_
�Lu/�r�
`, A `v A TomV , v„Tp ,_ ��� A I / I / / / / /,/ /, r AI %I A99 / ���� ` �Z�• _ , 4j2 _ _ _ O Z
68--- �/ J
466. Q I --I
In8 Lu
W
�\.•
W
A A
�� R(10
iCWD 6O1) CTCIkTO LLEAR AND��
GR�6 LINN��6
11 I II /�00 ` �ASNEAESS YTb INSTALL ESC�
S v I 1 v v 1 v v I 1 / / I v I 1 III I1 v o MAN®61E �v A SH . A- I W
SILT r / 5 v SUR
FENCE
ce
LU
�OILvTYP�: Lu
\ L.V
--- - -- / / 6 I I �. / w y�.o v I ` `v v v47 A v v �` �• ��
--- - - -- -- _
�i �' � '(JYP.)/ // / r I IY� / � � � `D y• �V A \ 5`q,,
r 'SOIL TYPE \
S61L TYPE:1 / / / / / / / - / f " "�."'::"1"."..."'.."a°✓ _ - _ - -3�. - - 5'`0 5 'o �L� y. TAME'—C
4/ D%i .-j" �s� \
L / / • i i / r i, I i / Ih� , - ly'J" - _ _�- ;n_ _ _ _ _524� \ ,SCALE 9"=50'
/ I y�
�SUL IVTPEir' / �.�"'� , VAP�' �I v v` V v
/' -52 \got ` $ , 1864.001
o rT 6 0. so1001 ���'1
65
/ '� — � b b I I I I � y✓ � __ -_ 1
' / '� ---' h° `' I r I I I I l r •":�• - m__ �30 _ A v / � �I vV o I I. - � �� \ V '`I C3.3
. 0 11/ I V' 'I
/ . �� � // r ,I u \\III\ \y\ . \
I� I I/'�� \ \ iy rr, ' ,/ y EROSION CONTROL LEGEND
— — — — LIMITS OF CONSTRUCTION 7.36 AC
�4 )
, SOIL AREA DIVIDE
I_I i- I1r- A- • Il1rI�rI_;1_ �1 v/ -+ -�I��I _r�J_ �)vr_L. \ ; •1,-\I l Iv lami ti-I.�-- ,`�-/-���'-�.I -i_-�'Tr `,�`- Q�`•v' ir I_\ ' =- I I `_n '_I .."I�l/ � v(-'I I-�I_'/. ^_ I-r1I— ' A /II--15Ii1 )� /v1_I(IIIG\ \M��II_4_I_- \'�I,12I_y/ I_ —I�_� ^ IIm\ kl_ I�Ii �'_-_ PW_/V/'-I�� ^ I - I.
I_;`/I�\\�I/ I —V_ 11'/ \A \e1I,v\- I\�"1' �I1 �\ I `�/ ', \v\III,Ivv'=\I'zI\\. ,e1�\vI'� \I �\�;'v\`I,-_\\I�r, \ _I(�\ ` .) ��. `-i1AI ,� \_ ; \v •I/\�1 1 �c�\-,I `V,A\I�e` \� `. II ;_�I `-�\\�.\I-�v\A \\�r�_\��I \ I \��11\I�1IIA�\\ ` \II �1 1,�J�`l\\� Ae'\`I� _jI\ �. �- [�'v`��\�vI\'-�`N�\.v IA�`III; \�-�'' \ I`I1� v�A) �I)I\�TI�C �_y'�� `i-/ip !'`,/�/\1-U�`,1v/�WS�-`�//\v"`I\_' ,I`I �rl�,�FO�1_\V����\/l\I \�Fd��'�_1 , �_(7\11- /�����' \�AIfE�'/-_I 11 I i�/ .' / S lI/"I �J/l\�%�//�!� �/'� i'A�/$/ ,`I l/ /'I�'/I�' / I�,'I/ � r ')''- /I" /� )/ 1I`�/� Il/'1/`_r /-i';l/`t�\�_ /� l,,I�,^III� '���� i`, 'iI II(1 I/II//I`tl / / �-,'i,1/ ' I lj// �''_� ,:V'I_,I,/I l/� - /' j'`I ,� - 1_-,// -///; ,/ ,�' / l/1 t/ /'i7' ./= //r�I,I _/��' /Iz/ _ �I�//l/ zII�� - '/ =_--I� (� I, % �,I
_-_ ..� -_\- �-V _A'�-` -- ` - `I ��"�,`YA _-_ _-A�`-\� / �,_E'���i_/--�_9 /J/_��'rII_\-_ _ P 5 /_-�'� d��6f--'��2- 0G/ -_ ii .; �� N�� •_9 � ._/ �\-'99 �G'�-- ,'r\A__P�E�'_- P/-/ _-- � \_ gtg'- -0\-1i'_1J _ - -,/i �P/._0�---y� ��- -,-/ __1`-_\ Vo A/-_„�_ �-�_� ----'/il�-C` :_ - _._ W_ -/1^�--�/- /_ -!D'+\ �Z _- /�:�_
I�'VI�lP_•iAII\,rI` �/I , I\�/ l-� I I�'°o�IIr 1III�.° ' /\A A�\�I'I %1 ' y \/°rlI�I\�I� II"l /I °I \ '�rI� v <j /,11\FI-1�I �rI,1I� \vI�/II,' -I—Ip I �
3 ;n •I_�_FE`''l��
_A i/ -� �r>�-t-6�� �,I �-�fl/A, )/,I�>— `•,)`( e; d1� '��I ;°, z'1v �lI'\ ,�r�,
`
I'/_ 1� ;\I�\I'�\�'_,\I, •�/`/;i `
,
-_
�.
PAVED
AVED c\`\ CO\`��\NI\
\IS\�\TvA°\\_°rR�v(UI�
N f C�(1IA�2I-Iv
\\ T\
IS� \/
�O.VI\•N
\vI\
l
I \�A
�
�
�
e
31
0
rII\I
ENTRAN
2492 E"- - nlL TY " _ ---- P/
1 1 -4p,-X X SILT FENCE 3.05ASSOCIATES URVY
90 (TYFPSAOTLAN $ SOMAIL RWrSEW JP
SUPER SILT FENCE 3.05R SORVEY �; da 1 1 INLET PROTECTION 3.07
7-
CLEAN WATER DIVERSION 3.09; �,00000_
4 VEHICULAR STREAM CROSSING 3.24
� / SOIL TYPE: TEMPORARY SEEDING 3.31 UTILITY STREAM CROSSING 3.25
s6lLr
PERMANENT SEEDING 3.32
—TP—TREE PRESEAFENCE 3.38
DUST CONTROL 3.39
TfPEg0ILTYRE:S I _ v/ 0.
AS
- -___ - -- \\I
DC
23
p lSSPS TS
00 FENCE------_SIL- = SSF OWAV6REAk FNGESILT 27 6L TYPE
�
S01LTYP ,\ SILT
BREAK
RCTORTOCLERSlj, I BPNAN 33 tie0/CO 9ANOE U FENCE
MI
-NECESSARY TO INSTALL ESQ
AllMEASURE ANDSEWERLINE D____
PS
\
21
OIy�vP SFENCE
\ y /\I!/SSF4yP USC _/
BREA
SOILTYPEa mw
A Sc WD —470
510^ T
_5'0i CWD
USC` I
—5209TRE TYP/
SOILSYPE--
65B C
530 I/ITYiI
.�
�I\A
V
)
\v,✓�`:\�
l
�
,I.
I'
\\
$�
{L /SCAL
o /' . ,'ioy
n A � .✓� / / ' � / „ � L ` � � \ \ \ I ` A I I I j l , < < A I , � ( C I N � I' I i /' i / r r I II II II I I ( I\ IV 1 I I \ � . ^ - - _
/r I 1 \ \ I I \er
!RAIG W J. KOTARSIG
Lic. No. 0402048507
710311 O
•
a
z
O
f
f
DATE
1210512018
DRAWN BY
A. MABEE
DESIGNED BY
J. SHOWALTER
CHECKED BV
C. KOTARSKI
SCALE
O
Ill
Z
W
X
W
W
W
Y
Q
a
U
Q
Lu
w
D
z
g
J
0
L�
r
Z
0
U
Z
Lu
0
Lu
z
0
0
l
Lu
JOB NO,
1864.001
C3.4
EROSION CONTROL LEGEND
,
LIMITS OF CONSTRUCTION (7.36 AC)
\ / -
` SOIL AREA DIVIDE
PAVED CONSTRUCTION ENTRANCE 3.02
ao
SILT FENCE 3.05
SUPER SILT FENCE 3.05
^� `\ `�_ \ y \ \ \ _ ` _ `_ _ \ \ \\ \ ,\` / -` _ I / \` I i / \ ✓/ / IP INLET PROTECTION 3.07
`` CWO CLEAN WATER DIVERSION 3.09
I sc
VEHICULAR STREAM CROSSING 3.24
URLCIV STREAM CROSSING 3.25
\X111,
TEMPORARY SEEDING 3.31
'`PERMANENT SEEDING3.32
f
I \ 1 TP — TP — TREE PRESERVATION FENCE 3.36
DUST CONTROL 3.39
-500
:\�g�w \ I \, .,\\` `_ `\\\`,\ \\ \ `\ —\. \ ` i � `, � ,50�T�P��'/_/r/�'/ jl///�r,,llll• (� �\ I I . ,\\\1 ll I \ I 11 I
. \ , \
as
�`,\� •°\� i I\ \ \ \\ \\\\\ \\' \ \
490 -vA
A
:A 1 11`'� 1 \\\
\
\ \ 36'.-�11\ \
II 1 ^ice, / 1
II/ `I;\\\I\I / ,..�._ il; �/ 1 ' /, l / `, `)1 \\\
\ \.f.\\'`Fo���\1�• `��.._ \`�; \. ' \ , \ \ CY/ / 1 I IIII( / I \l / r / 1 I \\ \
`.t�8.. \\` ��` •\"\\ , _, . I �� \ \` \ \ \ ♦ / I I I I1111/r l'''/))Io \_ , , I / 1 1 I 11 `\\\\ ` \ /\,`i■ \ \\\ \ \ _ \
w 480
\\O `,___ /�\,1\`\�\I
Y♦ x wL
- \\ _ a \ r l l I r II 1\\ Illr,�\ �11I \ 1 ` \ ` \ , \ \ \ \` \� V\ \\ ' \\ \` \\ \ ✓
ll`\` �� `�-./ r „�����\ - - -ti , I/ �`.� ���'� --- OILTppYP�:'/ \\"�:\
\SSF��,�• ��o,)\\�\�I-1 i�'j\� \_�'_ -14y''/ IIII /I,I'11 IIII''1... ..y\`1 1\, \ IYI \\' ) \\ _ /,`\`\I \` )✓ \
\ I ♦\ IIII'/i1301L TYP (1 IIII I III I" ,11 _-------_
DC �`v
44 T
o rljr I P5 TS \v�1 vmV`A v`i, �vv _--- .I `` r
\` / i / / / , L I I \\ X
ILT ,r\1 I ` _\ I \
I2Epyl�'° OV TYPE.
'III /,/ II J `,�\•° \\\� ` _ _�_-_ ` J v- - -- \ IIIIj1 /' 15
ur
_ _ -� v
______��
//A
N ♦ - A ° ^� �� M \.ram \ — / - - _ - _ _ _ - _ 2 — `\ _ _ ` _ \ 4 0 __ \" _ ` / \
\ /`
,
Ll\ IfLOOLJWAY /- %C —� \�S - "\; _ -"'� F.►rrr z�. _ _ _ - _ _ - - _ \� / \ ` - _ ; _ _ ,�� _ ;� o _ / - \ \ � -/ �E7\=' FL 'P�'�Trri�.i,�_\,\ N� _���•_ - -- ` �'�� � _ 440� -� \` `�� � \ `\\
-- -. 37 \ \\ \ / (/ SILT �: �`/ - SSF \� \ •.�\` _ �,�:\` - �� _ .�\_ , / r` , `�C ,�_
DC �T' - ��o o a a - NE71E" I{�.•° `\}y-0►:'�\y= s�N-x, _?� ` \ // _ \` _� \ \; \\ / \ \_
TS _�-'- 4B = 40 �� `�` \ o\O -�SAN °... `_`V_�•-�\ ��, ./��_\���`; `` ��\`✓ / \ '
_ate `K�,
_ v ` �� I '� • o _ 7IIP'�' — <s -mil A �- 50
SAN -qq0�`\
a_ `� v ti- CWD/ /i ' ---__ `>^_- - �r --.>\ °loo // ��°•,,\ `PE.
3B`
/CONTRACTOR TO CLEAR AND,
�RIiBLIMITS OF DISTURBANC€ C
AS NECESSARY-, 0 IN$TALCESC
MEASJJRES AND SEWER'LME- ) // -=_c`-_430 _ _\� _ �, _ 3A_� \ \\�\ "�° a •r,-_ `...a. ��_ `,\
y� \\` 1% 39\/• i �/ / .r _ /%,'ram_ /_-_ _ - \ \, _ \ \` _--____�'__ CWD, —� cr-\` _ \y �\ `410-A- `I�
\\\\�Z \\, �, 'r'/'� ~\, yJl�'l'=- ��qS�; ���- --_! - _`\ \ `_\," SILT_ - �� /��i
—�_FE
-_��_��_� _____-
43
__ _ _
I ` / ', - - - -470 \ p$ TS \ ^�_ SSF `\y
480- SC USC ro '' ____•�`�i•\--_______-; __1�
PE-
\\�\\\\ _;___�'�_/ �_'/ _ "' - __�-- _- _ _\ 1 �� \ \ I\ �f77�/�O' SPA, 11��, //,- � � ;o�CWD-`
✓"' \ `\ `\�� \\ ) �1``. J - i _ _____-_ _'______�`„/�l/��l/ ��
- - �- - _-- - ,l\ \ n\ , 1 / , / / /' lire I'/ u s ''/o- �-�--- TS -
_ i --z-�\ \ \ Y 1 \ 1 / I // u/, l /"',.I� [A /_-
_ 1 ` - - - - - -
\ - - - —- �500\ �In a- /'/
------� --------�-_
61 "/ - —
y � ✓ 1 .. ' / .� � - � ~ _ ~�
-�,
77"
.'�OB"i
3tMGW J. KOTARS9
Lic. No. 0402048507
7103110
0
� RL
DATE
s
1210512018
0
DRAWN BY
A. MABEE
• DESIGNED BY
• J. SHOWALTER
• CHECKED BY
C. KOTARSKJ
• • SCALE
1
IL O
1--1
z
w
Lu 0
L
W>>>Lu
Y o z
J
w Lu LLl
_ CZ5
U
z
LI O
Q O
O w ce
LLl
Lu
]oe No.
1864.00�
SHEET N0.
C3.5
Section 5. Stormwater Management Plan
(Provide a reduced l 1x17 copy of the latest stormwater management plan. Do not reference only.)
This project is the linear installation of an underground sewer line which will not significantly alter the
pre -development runoff characteristics after completion and final stabilization. Per DEQ guidance memo
No. 15-2003 no stormwater management is required.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
(Provide a reduced l 1x17 copy of a site plan on which all of the following activity locations are clearly
marked. Keep this plan up-to-date with ongoing site changes and inspections.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
54Ci
SOILTY
- - - _—.. -- - -
v
pcv I
- T �r �\SOILTt:Ll
\ \
,,�I ,_�-i -.I/ ,J`Q—�I /v 5 /g\ �\g \ — a�I g\\G`I , /.\54V\��/ /V V 'ti\1 (—5ra �/Ag�'v\�II " A° 'A i-�AaVI \ J- 1 I -I 8 l,l_ I��"' •�7/ 1,I/UI�L�1 � I 1 i-v' `.5I",�'-4�I/. A v ��- 2ib/
II1I 5v_—'vI�\ _51 I /gA �II-\ I i.-5' 1 / 6_�_�b.fyA=£/1/��VY�� I/d ��,//(�9�/� //'(/3���\�3� 20V/1_\��- � 7�S\n�'r /��// 7l'1 �'7 � -//�C' � 7-��&Y\ev� � :t/��Y.°'y'� _w�-'' "c w�. I A -`� � "--A�: 7v— ti�.�*`�� �'`I1�1_��\.�'---."\ •I- .--'r=\�--�+-�,--I �'I�I. �J� -7�f \A,".-�C � WW1 t : %l� h-_t ! amA \I �1_. \ \\ �\/:(��11` j\\ \�IV\ I iI\ \\ i �II .=, -,=-�.r�teII`I `I /l��_<\ '.'r"ir/�\�\--��\ce/ �� i-=!c�/ - ' '� \-\p ° / — 1I-\_/pI `l-�A imO—' I I .�g�_',-_'I< _ _"- -__�'__IO_—//,--_-Oipyl-_-� v r�---�eI - --v -�I, /\/% —I i`�I/` l-- 3'p _`i\- __� ' — _/- _-,_� ,�- ��- �_/—__-\ -�' _ _ -,\e--_-� '--_-_ _-, ---�- \ �-'� - -�-_ � _=-'-� _1 ��--��--'\\i�\/�-\\L\� � =w\�—i:.. LF,�_'r.s-s-� _\ � �_\W�u -v c\ "`.�vA / \ ��\" vI AA\\�,�y \ - ,II'\/ � A\'�_•kF�\\J� I _ vVl�\ v 1\ \v\ / /v�I_—\ 1 �'J�I A 11\ - �\It_I I� sfI1mou--s - . \-I \�(- se�\ � A�I A\ ' ''\ I -I I ����I- -_�I' _Vi -II \--/�,� -\/\am i -I I / /2r/� / �.�/ // , ll_/i_r . /— _ \/r Ii\r I /\/ (vI ISlI /r I-o,I II I I 1_ I• / \�II I`A' \IjI �/I\ i 1� \I)/'I I 'II / / II I/ Iv �\/�aItIII / .\`. >/+a/v//yjII
1 �I\AI\(_ _ / /_ (\, __p�-_ �-_�_/`�•�_',_-�/��- i'J_ __YW`y_.,o_-/8 f- 7 � ��7--. A-�-/_ / _ �/4 5_/✓-at'/�i7�� ' �_//�-_JS/ / -��-�.iA . �I5�j/", ���/ ''/- �b/i-/i _ �
\
,w
-_ •za3• •orWx ���� un
uy
------------` oz
------ SAN m0
we- >
JAC�i
0
5� u CrvNDa
DATE
SOIL TYPE, 1. 1210512018
ABOVE GROUND FUE C?NTANjEI 0
C`T}/ _7C
AISUFFICIENT TO EA. MABEEVOA
LUME%)O-GEAREA$L.•vUE'�
bSFS7I1 .F(JR AC W DESIGNED BY
SHOWALTE
R
--/J CHECD
.`C. K
CAALE
1=50' G 15
IN
It
CLVEIN&F lN?43PB -57
OSSIBLE FT KPILE-
ng_4 I' _\ _ v- =-'\1 J-1 A \ '-�\�/- �—\\ �" =_ v /I _\ -\CjIv!\'"\+� �._i _-_ __/ 'I r I \_ l- J I l/ g� `II\-� /iII - I �- -_% y- 0'-,�1 '- v '" � / \_b-��_e_,\g2-2, /-,yr5\ I�/I //�vI I-5 \ �/vv /\rl v% \"�-//iI'�-\I\ / �VI � 17 \\- //I v\ \\ I \ IIp I 1-/\ ,I�Iw, ,�\,p iI,\/�' /`�1 smI I �- vIII ----\_ -I_--;�`-�= `\ I\I �\ \T \ \ \ v- ;I ;-I--�� -1Njr-I t-J' � \ \�I \\/v /\\�\ \ \ �\{�\ �a�\ \\\ -\ \�,J \�\_ \\� `�~\/ _ � t- -\_\� -�- �`\�\�.+.",,�_,•r�9_.\ - /\ �-\v-� o\�ti\\�-���-,;......a.,�-.� ..\\ � cI` % I o-\- t:._ .....\-, R-s��\`�'1e'�I�x�s''OE\ qvvqo\n F( � \E� a \ � �\R�Y \TO-'ILE-TS\10\ �-\- ` ^-t-• �\ -y v,/ \ =\ 1= ., %1/ /- ' / ®t1I` -\ ^_0/� ^0 p/ / / '/ (I', 5\7gz0. 1�'I'\S7�5 7_6 ` _\_ ` I -\ /_\' %��\/ , /� /��-�Y\\ 5 ✓i/A/ N / .i5�\ ��'-' >5/05 _ r�?,8�— -/- _/\' -
N." O'DNRi�AS�1�ce iTAG�yING>\ � AREA, T,2Y'
P>.
588
, II /\\
1I
/
\ I
I I
O W
PPROXIMA TE LOCATION
PER PLANS FROM
OF EXISTING SEPTIC
Y X
LU
EA
? NREOKh 3 -578-UAR
Q
N 0Lu
UNNTAXWAP 6320�00-00-066Rd 572 PROT O
IVERSUT OFRG/jA�OUTON U W�588Qa2179222143&2A TYPE: 03200 00-00 006RO Q
TAXMAP
UNIVERSITY ~ , .i
OF VIRGIN/A
N UPAVED CONSTRUCTIOA
ENTRANCE WITH LINED OR 2179-222, 1
CONCRETE WASHOUT 243 & 244
PLAT
EMPORAW
A NOTE:
2' I COOKCAANTDE LOCATON OF CONSTRUCTION
DUMP§TER WITH SEWW
CLARK DRI�ENSION PROJECT.
OADWA SSSUB- 18-00171 DESE TRIEES NAD 83% li zOaz�Jd
- SCALE 1"=50� �51
60' - 100�
_ A 47C 7
JOB NO.
LOT 7, BLOCK B
COVER'S AIRPORTACRES \ \ , r I \\ - _ - \ \ \ \ \ \\ \ _ - _ _ - °3, \ 12'•W \ - - ' ,i i41864.001
s OB 350f193 PLAT / \ _ I ( I _ - \ \ \ _ ` SHEET N0.
PPP-1.0
L
V A 1 A A A V A SOILTYPE:/ / --
-----' - ,
�
SOIL TYPE: I 1 I v I I I / �' o0
IMP / �I / I r li I v v �3
/ I A I -I I ( 1
Q / I /
CFi�/TdF/ELY7�'4-� E
\ fYORR. \ I I \ \ I I ' I II \ ` , / 1 I / 4\``l l I / / / l I r I y E
530
o
_ w z
526--�O
vvvA71 6TJ$ v_ 522--- — _' 11 r r r l r I l I r I I w w
\ 5 \
`518----- - - - - -__ / l l l I 1 u>!
-_--- ��� �c� - - ` \ \ dl I 1 II l r \1A `IllAA\I `IA V-v T ` • V A .���_ -5js512
_
T . a '�v v v V - v - l r III
\
/ v v S ILTYIE _ ----__ o_
---------- ` \ //, / I I \ \` \ 6�. �"�,_,,------ \ \\\`'� \\\------__---_
\ \\ m i4 C' /'/ / // I i I \ \ - \ \\ o
I �
BA\ - _A -_ -
-498--__ _- � \ \\\\ � 1`\� \-________
--- - ----
�---__1�-
- -
'-- --4ea v v v v v%i�' -- a
__' - \\\\\\ ` I I I \ I `--------486- o
484. _ _ _ - \ \ \ \ \ _ _ - 1 \ \ \ \ `I \ \ In N DATE
bg484
1210512018
U� I 1 ( 1 / D ,' / / / 1 I I I 1 A ( / / / I / �- �' L V - •��V ` v �Iv�`/I I J A \ O DRAWN BY
/
SOIL TYPE: ` A. MABEE
' --- -�47D,
DESIGNED BY
/ ,' / 1 J. SHOWALTER
1 I SILT \ I _ \ _ !- ` \ \ \ — _ / I 1 •
/ I1 I \ FENCE- \ \ \ \ `� -'S>2- / \ \ \
I / / 1 \ \ I • CHECKED BY
/ / ( \ \ \ \
I ` BR _ 4 �\ _ \ ` \ \ \\ \ \ ` \ _ _
9 I I _ _\��� \ `\ `� _ _ _ -510' l I \ \\ C. KOTARSKI
' _ _ ` I , , _ _ - _ _ - _ _ _ _ _ _ s POSSIBLE STOOKPILE 1 / , \ - 1 1 1 I _ \ \ _ I SCALE
e\ I I 1 .QiVD STAGING AFj1f r / 1 \ \ ` \ \ \
_ _
{/NIV.€RSITY - t - - _ \ \ - _ - _ _ ` _ \� - '508 - - -
0
1 ' I I � � _ _ ____ \ �
\ I I I ( IFOUMDATION' \ _ - \ `I \ \ ` FENCE' _ _ _ _ _ _ \` _ — — ` ` �\ �. \��\ _ TREAAA TYP. - - 490 - _
l ` _ \ \ - - - - _ _ _ _ ` ` \ \ \ \ ` _ L t �'. ,. _—\ _ _ .DENSE TREES
I I I I `OB 2712TI25 _ \ ^S]- \ \ \ \ BREAK \ `` \ \ '�
Db 1802-682.i384 = _ _W \
PLAT \\� �I_ \ \ I \`I 1 / _ \ \ \ \\ \ \ \\\ \\ \ \\ ` -_ -- - \\\ 5 •
vv \\\ \ \ 1 \1 \I I A II II SOIL TYPE
2 :- 400
` \ v I I 11 1 cf `--// 4ZE---- � I —I
V \ \ 1 \ 1 1 I I / `470- -
y514 ` I
I FENCEI I I / I 4� 47�� �4"10 \
,FpRIPOLLUTI RREVENTIONPLTNFaT � 's
I-ErI$ANO KI)RIVEti(TENS[ON. - \
LOAD O, ANS4�YB-2816-00171 - LU
_
\ \V I I / // I . �' / �SRi 8o v Av . A `� X
V v v 1 1v II 1 1 1 v � __—____—_____� \�`�BA[AK� LU
L d
D LU
LU
410
Y vv v V v v vv \ `v 'I I I I I r �/, r� d9° • / / a�° v v I `468 o
466
V vv �v /'v w ` v �-_', v I ' ' / I i ( � //' /// / /, I/ I � /� /.A /• / d ASS' _ ,_, � � v .�� v `I � � �6� � m Z
`-
�\
t�tidE-458
,.. d
\NSE D.
. ` LU
� vv �` Rro,
.OIL A v v LU
\ s\ \
�o
413
r r 1 / / - A s� ° .5 a y�,e 52a �5 .. � y5$ : �. � , a— — — yti� � v � 5OI L 7a'PE� • � e`s�e \
S61LTYPE:I I l l , l / ,,-- , :. .y.. "air"=_ _ _-�--- - 5'` s�o ��� Y. �L �j vN� V`
%�I 1 , / , , / Imo- ,, '/ �. :�.y..✓ -- -_ `�AD83� O�V v
L-524� \ SCALE'I"=50'
`vL fYPEi'-526 0
- A 41864. DO1
- . ` 50, 100, \ I A V ♦' 1
65�sMEE N0.
P PPP
- r I
L
WETLAND
� r l r r /.I _ ,-___' - ,\ � a ,-' �` -' �I \ ) _>.(TYPy.'y ii ,��dp•���i ,��� ,ll /// /
402� ,1 Igq L/fiY,PE;' __ ------
Iwo
— �GdfEsB
- _-_ ASSdCIATESEy
GROUP SAMTARY'SEW //mac Pe ^�Oq
gRS VEY i -� —L� wP
36C , _ {id
(� , ' I I I � _- __-__ / I ( =_ g•3 p,P ' ,-'p _ ', r/ / -1 � � I / - � � l r r "/� / // � Po
`� � •) I _-_---��'� �. /- 1 % / / 1 � / �--_ J��y O'1g1 // r/ � ���r'/'' I , r I I '� � / i -� / � � 11 I I I I /( I ��
y'
wJu� o f
! \ - / T 1 i ,' SOIL TYPE:�1 _
r 1
�'PE: -�
♦ ` �O - . j � � Y-� � SOI
r \_ - .. •_, , * ' _' /''� ---' 4D/ _ 1 IL TYPE. I 1 1,\.:
A S I YP V, �, o
T
//1i —�•� A� o v '� / 7,D3
�'/i r - tia� I 1 _ '►�n">< �..-�a'I _ „ / �\ 1 1 till,\`\\� \� �T� _ ���1\ ( ^—a \; \ ' 1 1 1\,� ` \\ ry
,TYP�\1�11 o
D III 1 �_��- _-_�'- \/ 1/^\�\I \ \`\\ \`�\�` \\ \ In NDATE
1210512018
- - - 23 \ _ _ 1 I / /' _ ^'� \\ 1 l 1, , `\ A, \ , \ ` \ \ DHAwry BY
41 \ - _ \� �, \ o. ` \ \\ �o A. MABEE
_ a` ` = J _ • DESIGNED BY
1:7'3A - \ \ , 1 SIL % ,-- _ 24 r I l I 1 / r/°°I ..°.. ,' �,, ��,�J _ 1� `\�� \ �\- • J. SHOWALTER
FENCE
SILT I I I I CHECKED BY
ENCE l r I I a7��>V-( ' OODW4i -- _ i•
.BREAM �__ ° II / II , �,�\` 1 ` \ • C.--RS-
�\ l llrrll l67 1v' I�\,\\\ , \ • v L TYPE. SCALE
Z__ -- - \ ✓�y/:-_� _, ��-r r l rl iI bbr rI ,�1 �t. \♦,\°°. ��\\ v � \
K _ \♦• ��`c`� `1� •
SILT r , I 1, \ �`��`� ��o !7/ .♦__ , �� / r
y
-BREAK- --- �\, � ���' �♦�����J�`
' ,'�� `,.� ,`,` �\ FEAR - °°A\♦� ��°�.A,` �A
ND STAGINGAREA, FKP. 25 'i ".._ i 1' I I ,� �"�
A \
'FEN
I �'rcr _ �44 \` ♦ �.ri\:`\\
BR
v°a' oyo .A �y �`�•,,A` i \
\ O ` r� r - •� \ / -- _ _ - \ 460' SILT CL
qqj'I� � \1'r ,',� , `% , r. rJ �_ 28 BREAK
r°FENCE~\ i '/ 1 1 ��_/' _� � \ \ \'t\•`��\�\,
\ \ \( 1 �/'"�SOILTYPE; �\ 111 li I
LUr`r
__ -- ^_-"•_- /! -500- _ � � \ \� � _�\� _\ I I ' � \� _ I I / _ - ���♦ W
----- --- - ------ �_ 1� -�� - _
I � vl.�� w` � a
LU
510 -�. v v - _
\I W
"I'll,
v' W
-s ��00 i
LU
-520
/�
a � � \ � , �-------'\� - �• `_ / rl /r - � l / i-_.-...`,. c„'- --� �� �l � 1 -, i ` l r , �/ /r I I ' l I l �, ' \ ` ' U J
- '�_\ -,1\) s' ,ri 11-I / - v \ \\ \ \`� t \, w `�` \ 1 �' ,6TREAFI (-Tl'Pd ce O
d
SOI
1 I l 1 I _ - V , A V 111_ r r 1
-- I `�1 �, 1 , 11 I jl �L / / l LU
I�TYR E-:
C\ �, ' \I, `I , \ 1 i r, l ■I/ / I I - \ r / 4 L ,I r r 65B . \ l \ 1 1 I 1 , I 1) I I�L-l' I / A I I / I 1 ! w
_ �` ; I , 1 , I 1 I I II y , ,
N1A1'-''
0 1 , , Ir r ,r r P I i �r / 11 I 111111111��1 1�
J53
.Il
�l I'
_ `( 1' r // r
^ I-
\
_
/ _ ` I 41864.001
\ ✓� / / � / ` L \ \ � 1 ) / / < l I � ` I l 1 � 1 i / i / , 11 1 , I I I I l I` \ - - -_ _ - SHEETN 0.
PPP-1.2
L
. .\\. \ � \\ � `\`� .\��_ ______-_' �//'--. \ �\�---. _�,� \ `` ,\ .\ �• � ,�_; \'� ,ice / -' /\ f , r' " r_ � -� i / � - n \ � _
<:`� v v /� / V` r 'I / I \ / wow
IS
z
4 a
> w
A_-500
�;;�•A � __,v n .� 1 v .(, , / � �� v � / '�i 11/// , /.: i vv eo• vVA v � v I
/
410 _' / I,7 C,/ �/ l i/ ���
o w N
�,\... \ \\\\� ` J \ ., / , —C�/IL t�P �`\ ` r/ (,l=� /%/
III
--"--���/`\t �';� 'Or,'//1 r r ' l v v v rvv v � ui �DATE
1210512018
V ¢� ` A I I I I ` A`\\Vv 1 A / IIIA VJ1v �'_ 11 I I V / / A A h. _ Y DRAwNBY
WV
A. MABEE
�IAIII �vII 8- \7�= v�I<I --1 v � .\`�\I I � �- vb III \\`1v � 1�\\-\�\ \\`�� A vv�-S\\�.A `-� 1O.°\\d �i\•° �`J\_Y\�<� ` �` \A1�\�\ �� `Y,\A\�� P.V`.•`, �^.\3A \B\ 1vI\ v\`\,\A1II �1 1I \AI\ �\\ Iv�vw�\vim'.v\`\�P\vv\\� \�\i ' �V (�\,�I b\�\l \ _``I\_' \v \�` vn-��.-;�_ A`. \AI v i`.� A_\V\.\v \`n r\I\1 \`A�bI� \1�°.�°�\-\.v ��`\ ����_,_\ \`- \�h \ \�`�- C✓ � ;�--�\r u_ �/r���` \����U��7'.'—/-/�6_ +'.�Hr�-'��•-����^_:,�1 . 1�'.'--�`.a-°vj1'�-�P�/__o,\%,1_/-9a �\I
�4�4_0-A„`VC�.`,`'-„\_-_t�--- __ �_ _ - - -___' _._�-_-____-�.�_. _-,_�`_� "��_ ,-`_ -- S- _ I- '�L_T__ _ '_mi_,-s_- l - _6_�-"_ � z\ _°J<a'_-_-,4_.\ �_o�'-i_ ," \ __-�"��---4_ - e . _,S/4o_<A6`/-. �-p erN �//--z�_ / '- I �;`QI I'�_ o1I _ I .,s�'1 �Iy�\�I ^ _I ,ItiI•/ "1 �1 �
;o \a/�`-+Y- \o\_�_� v�_ . -�-�-'_`\\ _ ,�� , ,\1 • � o ./'\ I\ _ _ I_\\ __\ 7-_V_ lV \_2=�ItQ',,S��I Sr � -N IBI\�\I-`�L�`-_IE1\-v�_S,\ _ I '- _1� �`S<\ OVA-\<��tiIvAL� \l1 1T.l��y`r\vY1r,\v _> ��P .I� \V�-�//�`�I. ,\\� I/`./\$ I\ '\` � /�\` /v,\\uv :I `:`:v,\ \ vI mi\>\-`\l\�\I\ A\`\ °,\ `\\"
I / �� / \-\ \\/ _\i_�I -/_E°`��`. r _\-( �o',Gs/�'� \A . /\ \(Vv\_ ;/ r 4��7�✓�a\\�\d��-vIr;
_
;
" O•�
••
LxDESIGNED
J. SHOWALTER
'
BY
'4F-
\-'470-
\ CHECKED BY
` C. KARSK
SCALE0
°__ ____
ILT PEANCIEI . __
CL
LU
7-l— LU
COZ dSILT ANw.
40 zLU
0 i
LU
39E-
FENCE 43
`Eer'T6?kMIV�
7MRuT9G1NGAREA:� Y
_ -_____ " io= w
-17--
- glo
ui
-BRFaFSILT—
IL-TYPF------------
--- -- - _ -
\ / \ 1 \\ \ I - -'s�= _> _. _ �- - _ �-, �\ '� Y `t <\ \\ \ I l 1 r I rrlll "/, �� __
_ `I __ _
y`.I,` \\ �lI \Ir—' - ---_ '---_` \ `-. - ..- �. `_ \, \ \ I\I l�l\�\1 I' I/r�l ''Irr rr I;, I/i /_ _ _ ✓ /�- _______- �. JOBNO.
�SOI YY ' l l..'/ f "./~ ~� -__ __'� _ - `�' \ 1 1 1 1 / I 1 1 1 11r/'/ /I lly\\1�i',' ,SCAI-Nj50��; / ✓_ 'J--
--- --- -- 41864.001
SHEETNO.
,_--_--\� ��'----' PPP-1.3
L
H. sources of roimants. locations. ana
Pollutant, or Pollutant Prevention Practices,
Generating Activity Location on site Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and un-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbent/oil dry for all paving
machines to limit leaks ands ills
Concrete washout shall occur in area
Direct concrete wash water into a leak -
Concrete washout and
adjacent to the construction entrance as
proof container or leak -proof settling basin
cement waste
designated on the Pollution Prevention
that is designed so that no overflows can
Plan.
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting, and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing compounds.
Dewatering if necessary when
Water shall be filtered, settled or similarly
Dewatering operations
converting culvert inlet protection
treated prior to discharge as shown on
shown on plans
plan.
Designated areas for material delivery and
Material delivery and storage
Adjacent to construction entrance and
storage. Placed near construction
construction trailer.
entrances, away from waterways and
drainage paths
Issued - 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Material use during building process
Building areas
Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
waterway. Containers have lids covered
before periods of rain, or are in a covered
Solid waste disposal
As provided by contractor
area. Scheduled collection to prevent
overfilling. MATERIALS NOT TO BE
BURIED ON -SITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash area is located at the construction
control as specified on plan. Minimize
Wash Waters
entrance. Adjacent diversion dike will
the discharge of pollutants from
divert wash water to sediment trap.
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other
materials present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing
site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater
discharges.)
D. Non-stormwater discharges
Discharge
Pollutants or Pollutant
Constituents
Location on Site
Dust control water
Sediment
As shown on plan
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Discharge Pollutants or Pollutant Location on Site
Constituents
E. Persons responsible for pollution prevention practices
(Provide the names and contact information for all persons responsible for prevention practices as listed
above.)
University of Virginia Foundation
P.O. Box 400218
Charlottesville, VA 22911
Contact: Todd Marshall
434.924.2569
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement
chemical spill and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows;
Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage
trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter,
sand, saw dust, and plastic and metal trash containers.
All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of
discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash
containers for disposal.
Report all spills, leaks and discharges as follows;
(Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.)
Reports will be made to the following:
Virginia Department of Emergency Management
Emergency Operations Center (EOC)
Phone: (800) 468-8892
Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
G. Pollution Prevention Awareness
(Describe training and procedures to provide awareness and compliance for all measures in this
document; waste management, wash waters, prevention measures, etc.)
The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention
measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land
disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by
registered land disturber each time a new E&SC procedure is constructed.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Guidance:
Section 76 of the VSMP Regulation, 9VAC25-870, establishes the requirement that linear development
projects control postdevelopment stormwater runoff in accordance with a site -specific stormwater
management plan or a comprehensive watershed stormwater management plan. The purpose of this
guidance document is to clarify the implementation of Section 76 with regard to the construction of linear
utilities (e.g., waterlines, sewer lines, electric lines, telephone lines, oil and gas distribution pipelines, etc.)
and was developed for use by the Department and local VSMP Authorities.
The VSMP Regulation does not distinguish between various types of linear development projects such as
aboveground or underground utilities, highway construction, rights -of -way, bridges, tracks and related
structures of a railroad company. The Department of Environmental Quality (DEQ) recognizes that the
construction of aboveground or underground linear utilities may not result in changes to the
predevelopment runoff characteristics of the land surface after the completion of construction and final
stabilization. Also, the application of the postdevelopment water quantity and water quality controls to
these types of projects and the preparation and implementation of a stormwater management plan may
provide minimum water quality benefit. Examples of such projects include:
• The installation of underground utilities (e.g., waterlines, sewer lines, oil and gas distribution
pipelines) beneath existing impervious cover (e.g., asphalt pavement, concrete pavement) that
will be returned to its predevelopment condition after the completion of construction and final
stabilization;
• The installation of underground utilities (e.g., waterlines, sewer lines, oil and gas distribution
pipelines) beneath existing pervious cover (e.g., forest/open space, managed turf) that will be
returned to its predevelopment condition after the completion of construction and final
stabilization; or
• The installation of aboveground (i.e., overhead) utility lines.
DEQ staff or the local VSMP authority should utilize their best professional judgment when evaluating
aboveground or underground linear utility projects. If the project will not result in significant changes to
the predevelopment runoff characteristics of the land surface after the completion of construction and
final stabilization, then DEQ or the local VSMP authority, at their discretion, may waive the requirement
for the preparation and implementation of a stormwater management plan. DEQ recognizes that on a site
specific basis a stormwater management plan may be required especially if the linear utility project will
significantly alter the predevelopment runoff characteristics of the land surface.
In addition, the construction of aboveground or underground linear utilities may be conducted without
requiring coverage under the General VPDES Permit for Discharges of Stormwater from Construction
Activities (Construction General Permit) provided that:
• The project does not significantly alter the predevelopment runoff characteristics of the land
surface after the completion of construction and final stabilization;
• The project is managed so that less than one (1) acre of land disturbance occurs on a daily basis;
• The disturbed land where work has been completed is adequately stabilized on a daily basis;
• The environment is protected from erosion and sedimentation damage associated with the land -
disturbing activity;
• The owner and/or construction activity operator designs, installs, implements, and maintains
pollution prevention measures to:
➢ Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash
water, and other wash waters;
➢ Minimize the exposure of building materials, building products, construction wastes,
trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste,
and other materials present on -site to precipitation and to stormwater;
➢ Minimize the discharge of pollutants from spills and leaks and implement chemical spill
and leak prevention and response procedures;
➢ Prohibit the discharge of wastewater from the washout of concrete;
➢ Prohibit the discharge of wastewater from the washout and cleanout of stucco, paint,
form release oils, curing compounds, and other construction materials; and
➢ Prohibit the discharge of fuels, oils, or other pollutants used in vehicle and equipment
operation and maintenance.
• The owner and/or construction activity operator provides reasonable assurance to DEQ or the
local VSMP Authority that all of the above conditions will be satisfied. This may be
accomplished by incorporating these conditions into an erosion and sediment control plan
developed for the project.
As previously noted, DEQ staff or the local VSMP authority should utilize their best professional
judgment when evaluating aboveground or underground linear utility projects. If the owner and/or
construction activity operator provides reasonable assurance to DEQ or the local VSMP Authority that all
of the aforementioned conditions will be satisfied, then the linear utility project may be conducted without
requiring coverage under the Construction General Permit. Please note that this does not relieve the
owner and/or construction activity operator from complying with any and all other applicable federal,
state, and local requirements. DEQ or the local VSMP Authority reserves the right to require a
registration statement for Construction General Permit coverage if the aforementioned conditions are not
satisfied.
If the linear utility project will significantly alter the predevelopment runoff characteristics of the land
surface requiring postdevelopment stormwater management or if other site specific conditions warrant
Construction General Permit coverage, DEQ or the local VSMP authority may require a registration
statement for permit coverage.
2
Section 7. Discharges to impaired waters, surface waters within an applicable
TMDL wasteload allocation, and exceptional waters.
This site discharges to impaired waters as detailed on the following sheets.
Enhanced inspection frequency is required as outlined below:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business
days or (ii) at least once every five business days and no later than 48 hours following a
measurable storm event. In the event that a measurable storm event occurs when there are
more than 48 hours between business days, the inspection shall be conducted on the next
business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
�'lllf�l\1,1 QFjQ
�..�'J (}F
James River Basin
Cause Group Code: H27111-01-BEN
Fact Sheets for
Impaired (Category 5) Waters in 2014
Flat Branch X-trib
Location: Flat Branch X-trib from the headwaters downstream to its confluence with Flat Branch. (Start Mile: 2.03 End Mile: 0.00 Total
Impaired Size: 2.03 Miles)
City / County: Albemarle Co.
Use(s): Aquatic Life
Cause(s) /
VA Category: Benthic-Macroinvertebrate Bioassessments / 5A
This segment is impaired due to violations of the General Standard for Benthics at stations: 2-XKL000.37 (Impaired for VSCI).
Initial List Date: 2010.
Flat Branch X-trib Estuary Reservoir River
Aquatic Life (Sq. Miles) (Acres) (Miles)
Benthic-Macroinvertebrate Bioassessments - Total Impaired Size by Water Type: 2.03
Sources:
Non -Point Source
Draft 2014 Appendix 5 - 401
Section 8. Qualified personnel
The following personnel are responsible for inspections;
(Provide the name, telephone number, and qualifications of the qualified personnel conducting
inspections.)
University of Virginia Foundation
P.O. Box 400218
Charlottesville, VA 22911
Contact: Todd Marshall
434.924.2569
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 9. Signed Certification
(Provide certification according to 9VAC25-870-370. For purposes of plan review and approvals, this
certification should be the owner of the property, the same signature as appears on the bonds and
applications. Another operator can be designated on the delegation of authority form to follow.)
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted
is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
Owner/Operator Name
Company:
Title:
Signature:
Date:
Todd Marshall
UVA Foundation
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
(Provide the persons or positions with authority to sign inspection reports or to modify the stormwater
pollution prevention plan. A formal, signed delegation of authority is needed.)
Delegation of Authority
I, (name), hereby designate the person or specifically described position below
to be a duly authorized representative for the purpose of overseeing compliance with environmental
requirements, including the Construction General Permit, at the
construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans
and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set
forth in the Construction General Permit (CGP), and that the designee above meets the definition of a
"duly authorized representative".
Operator Name: Todd Marshall
Company:
Title:
Signature:
Date:
UVA Foundation
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 11. General permit copy
(Provide a copy of the construction general permit, 9VAC25-880)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
General Permit No.: VAR10
Effective Date: July 1, 2014
Expiration Date: June 30, 2019
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION
ACTIVITIES
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT
In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia
Stormwater Management Act and regulations adopted pursuant thereto, operators of construction
activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of
Virginia, except those specifically named in State Water Control Board regulations that prohibit such
discharges.
The authorized discharge shall be in accordance with this cover page, Part I - Discharge Authorization
and Special Conditions, Part 11 - Stormwater Pollution Prevention Plan, and Part III - Conditions
Applicable to All VPDES Permits as set forth herein.
General Permit No.: VAR10
Page 1 of 21
PART I
DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS
A. Coverage under this general permit.
1. During the period beginning with the date of coverage under this general permit and lasting until the
general permit's expiration date, the operator is authorized to discharge stormwater from construction
activities.
2. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or
asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal
areas, borrow areas) located on -site or off -site provided that:
a. The support activity is directly related to the construction activity that is required to have general
permit coverage for discharges of stormwater from construction activities;
b. The support activity is not a commercial operation, nor does it serve multiple unrelated
construction activities by different operators;
c. The support activity does not operate beyond the completion of the last construction activity it
supports;
d. The support activity is identified in the registration statement at the time of general permit
coverage;
e. Appropriate control measures are identified in a stormwater pollution prevention plan and
implemented to address the discharges from the support activity areas; and
f. All applicable state, federal, and local approvals are obtained for the support activity.
B. Limitations on coverage.
1. Post -construction discharges. This general permit does not authorize stormwater discharges that
originate from the site after construction activities have been completed and the site, including any
support activity sites covered under the general permit registration, has undergone final stabilization.
Post -construction industrial stormwater discharges may need to be covered by a separate VPDES
permit.
2. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are
mixed with sources of nonstormwater, other than those discharges that are identified in Part I E
(Authorized nonstormwater discharges) and are in compliance with this general permit.
3. Discharges covered by another state permit. This general permit does not authorize discharges of
stormwater from construction activities that have been covered under an individual permit or required
to obtain coverage under an alternative general permit.
4. Impaired waters and TMDL limitation. Discharges of stormwater from construction activities to surface
waters identified as impaired in the 2012 § 305(b)/303(d) Water Quality Assessment Integrated
Report or for which a TMDL wasteload allocation has been established and approved prior to the
term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended
solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this
general permit unless the operator develops, implements, and maintains a SWPPP that minimizes
the pollutants of concern and, when applicable, is consistent with the assumptions and requirements
of the approved TMDL wasteload allocations. In addition, the operator shall implement the following
items:
General Permit No.: VAR10
Page 2 of 21
a. The impaired water(s), approved TMDL(s), and pollutant(s) of concern, when applicable, shall be
identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
5. Exceptional waters limitation. Discharges of stormwater from construction activities not previously
covered under the general permit issued in 2009 to exceptional waters identified in 9VAC25-260-30 A
3 c are not eligible for coverage under this general permit unless the operator implements the
following:
a. The exceptional water(s) shall be identified in the SWPPP;
b. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site;
c. Nutrients shall be applied in accordance with manufacturer's recommendations or an approved
nutrient management plan and shall not be applied during rainfall events; and
d. The applicable SWPPP inspection requirements specified in Part II F 2 shall be amended as
follows:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or
(ii) at least once every five business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted on the next business day;
and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to exceptional waters.
6. There shall be no discharge of floating solids or visible foam in other than trace amounts.
C. Commingled discharges. Discharges authorized by this general permit may be commingled with other
sources of stormwater that are not required to be covered under a state permit, so long as the
commingled discharge is in compliance with this general permit. Discharges authorized by a separate
state or VPDES permit may be commingled with discharges authorized by this general permit so long as
all such discharges comply with all applicable state and VPDES permit requirements.
General Permit No.: VAR10
Page 3 of 21
D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges
covered by this general permit shall be composed entirely of stormwater associated with construction
activities. All other discharges including the following are prohibited:
1. Wastewater from washout of concrete;
2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds,
and other construction materials;
3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
4. Oils, toxic substances, or hazardous substances from spills or other releases; and
5. Soaps, solvents, or detergents used in equipment and vehicle washing.
E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction
activities are authorized by this general permit when discharged in compliance with this general permit:
1. Discharges from firefighting activities;
2. Fire hydrant flushings;
3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been
used and the wash water has been filtered, settled, or similarly treated prior to discharge;
4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge;
5. Potable water sources, including uncontaminated waterline flushings;
6. Routine external building wash down where soaps, solvents or detergents have not been used and
the wash water has been filtered, settled, or similarly treated prior to discharge;
7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or
where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or
detergents have not been used; and where the wash water has been filtered, settled, or similarly
treated prior to discharge;
8. Uncontaminated air conditioning or compressor condensate;
9. Uncontaminated ground water or spring water;
10. Foundation or footing drains where flows are not contaminated with process materials such as
solvents;
11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have
been filtered, settled, or similarly treated prior to discharge; and
12. Landscape irrigation.
F. Termination of general permit coverage.
1. The operator of the construction activity shall submit a notice of termination in accordance with
9VAC25-880-60 to the VSMP authority after one or more of the following conditions have been met:
General Permit No.: VAR10
Page 4 of 21
a. Necessary permanent control measures included in the SWPPP for the site are in place and
functioning effectively and final stabilization has been achieved on all portions of the site for which
the operator is responsible. When applicable, long term responsibility and maintenance
requirements shall be recorded in the local land records prior to the submission of a notice of
termination;
b. Another operator has assumed control over all areas of the site that have not been finally
stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For residential construction only, temporary soil stabilization has been completed and the
residence has been transferred to the homeowner.
2. The notice of termination should be submitted no later than 30 days after one of the above conditions
in subdivision 1 of this subsection is met. Authorization to discharge terminates at midnight on the
date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through
1 d of this subsection. Termination of authorizations to discharge for the conditions set forth in
subdivision 1 a of this subsection shall be effective upon notification from the department that the
provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of the notice
of termination, whichever occurs first.
3. The notice of termination shall be signed in accordance with Part III K of this general permit.
G. Water quality protection.
1. The operator must select, install, implement and maintain control measures as identified in the
SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that
the operator's discharge does not cause or contribute to an excursion above any applicable water
quality standard.
2. If it is determined by the department that the operator's discharges are causing, have reasonable
potential to cause, or are contributing to an excursion above any applicable water quality standard,
the department, in consultation with the VSMP authority, may take appropriate enforcement action
and require the operator to:
a. Modify or implement additional control measures in accordance with Part II B to adequately
address the identified water quality concerns;
b. Submit valid and verifiable data and information that are representative of ambient conditions and
indicate that the receiving water is attaining water quality standards; or
c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3.
All written responses required under this chapter must include a signed certification consistent with Part
III K.
General Permit No.: VAR10
Page 5 of 21
PART II
STORMWATER POLLUTION PREVENTION PLAN
A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a
registration statement and implemented for the construction activity, including any support activity,
covered by this general permit. SWPPPs shall be prepared in accordance with good engineering
practices. Construction activities that are part of a larger common plan of development or sale and disturb
less than one acre may utilize a SWPPP template provided by the department and need not provide a
separate stormwater management plan if one has been prepared and implemented for the larger
common plan of development or sale.
The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans
such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of
the federal Clean Water Act or best management practices (BMP) programs otherwise required for the
facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II A. All
plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan
incorporated by reference does not contain all of the required elements of the SWPPP, the operator must
develop the missing elements and include them in the SWPPP.
Any operator that was authorized to discharge under the general permit issued in 2009, and that intends
to continue coverage under this general permit, shall update its stormwater pollution prevention plan to
comply with the requirements of this general permit no later than 60 days after the date of coverage under
this general permit.
A. Stormwater pollution prevention plan contents. The SWPPP shall include the following items:
1. General information.
a. A signed copy of the registration statement, if required, for coverage under the general VPDES
permit for discharges of stormwater from construction activities;
b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of
stormwater from construction activities (i.e., notice of coverage letter);
c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction
activities;
d. A narrative description of the nature of the construction activity, including the function of the
project (e.g., low density residential, shopping mall, highway, etc.);
e. A legible site plan identifying:
(1) Directions of stormwater flow and approximate slopes anticipated after major grading
activities;
(2) Limits of land disturbance including steep slopes and natural buffers around surface waters
that will not be disturbed;
(3) Locations of major structural and nonstructural control measures, including sediment basins
and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or
similarly treat sediment, that will be installed between disturbed areas and the undisturbed
vegetated areas in order to increase sediment removal and maximize stormwater infiltration;
(4) Locations of surface waters;
General Permit No.: VAR10
Page 6 of 21
(5) Locations where concentrated stormwater is discharged;
(6) Locations of support activities, when applicable and when required by the VSMP authority,
including but not limited to (i) areas where equipment and vehicle washing, wheel wash
water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels,
fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling
and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on
the construction site; and (vi) construction waste storage; and
(7) When applicable, the location of the on -site rain gauge or the methodology established in
consultation with the VSMP authority used to identify measurable storm events for inspection
purposes.
2. Erosion and sediment control plan.
a. An erosion and sediment control plan approved by the VESCP authority as authorized under the
Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as
defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan
prepared in accordance with annual standards and specifications approved by the department.
Any operator proposing a new stormwater discharge from construction activities that is not
required to obtain erosion and sediment control plan approval from a VESCP authority or does
not adopt department -approved annual standards and specifications shall submit the erosion and
sediment control plan to the department for review and approval.
b. All erosion and sediment control plans shall include a statement describing the maintenance
responsibilities required for the erosion and sediment controls used.
c. A properly implemented approved erosion and sediment control plan, "agreement in lieu of a
plan," or erosion and sediment control plan prepared in accordance with department -approved
annual standards and specifications, that adequately:
(1) Controls the volume and velocity of stormwater runoff within the site to minimize soil erosion;
(2) Controls stormwater discharges, including peak flow rates and total stormwater volume, to
minimize erosion at outlets and to minimize downstream channel and stream bank erosion;
(3) Minimizes the amount of soil exposed during the construction activity;
(4) Minimizes the disturbance of steep slopes;
(5) Minimizes sediment discharges from the site in a manner that addresses (i) the amount,
frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater
runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the
site;
(6) Provides and maintains natural buffers around surface waters, directs stormwater to
vegetated areas to increase sediment removal, and maximizes stormwater infiltration, unless
infeasible;
(7) Minimizes soil compaction and, unless infeasible, preserves topsoil;
(8) Ensures that stabilization of disturbed areas will be initiated immediately whenever any
clearing, grading, excavating, or other land -disturbing activities have permanently ceased on
any portion of the site, or temporarily ceased on any portion of the site and will not resume for
a period exceeding 14 days; and
General Permit No.: VAR10
Page 7 of 21
(9) Utilizes outlet structures that withdraw stormwater from the surface (i.e., above the
permanent pool or wet storage water surface elevation), unless infeasible, when discharging
from sediment basins or sediment traps.
3. Stormwater management plan.
a. New construction activities. A stormwater management plan approved by the VSMP authority as
authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-
870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10
from the VSMP authority, or a stormwater management plan prepared in accordance with annual
standards and specifications approved by the department. Any operator proposing a new
stormwater discharge from construction activities that is not required to obtain stormwater
management plan approval from a VSMP authority or does not adopt department -approved
annual standards and specifications shall submit the stormwater management plan to the
department for review and approval.
b. Existing construction activities. Any operator that was authorized to discharge under the general
permit issued in 2009, and that intends to continue coverage under this general permit, shall
ensure compliance with the requirements of 9VAC25-870-93 through 9VAC25-870-99 of the
VSMP Regulation, including but not limited to the water quality and quantity requirements. The
SWPPP shall include a description of, and all necessary calculations supporting, all post -
construction stormwater management measures that will be installed prior to the completion of
the construction process to control pollutants in stormwater discharges after construction
operations have been completed. Structural measures should be placed on upland soils to the
degree possible. Such measures must be designed and installed in accordance with applicable
VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits
must be obtained.
4. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -generating
activities that may reasonably be expected to affect the quality of stormwater discharges from the
construction activity, including any support activity. The pollution prevention plan shall:
a. Identify the potential pollutant -generating activities and the pollutant that is expected to be
exposed to stormwater;
b. Describe the location where the potential pollutant -generating activities will occur, or if identified
on the site plan, reference the site plan;
c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or
will be commingled with stormwater discharges from the construction activity, including any
applicable support activity;
d. Identify the person responsible for implementing the pollution prevention practice or practices for
each pollutant -generating activity (if other than the person listed as the qualified personnel);
e. Describe the pollution prevention practices and procedures that will be implemented to:
(1) Prevent and respond to leaks, spills, and other releases including (i) procedures for
expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii)
procedures for reporting leaks, spills, and other releases in accordance with Part III G;
(2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and
maintenance activities (e.g., providing secondary containment such as spill berms, decks,
spill containment pallets, providing cover where appropriate, and having spill kits readily
available);
General Permit No.: VAR10
Page 8 of 21
(3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction
materials, including the clean-up of stucco, paint, form release oils, and curing compounds
(e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with
stormwater; (ii) collection and proper disposal in a manner to prevent contact with
stormwater; and (iii) a similarly effective means designed to prevent discharge of these
pollutants);
(4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water,
and other types of washing (e.g., locating activities away from surface waters and stormwater
inlets or conveyance and directing wash waters to sediment basins or traps, using filtration
devices such as filter bags or sand filters, or using similarly effective controls);
(5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The
container or basin shall be designed so that no overflows can occur due to inadequate sizing
or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner
consistent with the handling of other construction wastes. Liquid concrete wastes shall be
removed and disposed of in a manner consistent with the handling of other construction wash
waters and shall not be discharged to surface waters;
(6) Minimize the discharge of pollutants from storage, handling, and disposal of construction
products, materials, and wastes including (i) building products such as asphalt sealants,
copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides,
herbicides, insecticides, fertilizers, and landscape materials; and (iii) construction and
domestic wastes such as packaging materials, scrap construction materials, masonry
products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or
building materials;
(7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes,
and sanitary wastes; and
(8) Address any other discharge from the potential pollutant -generating activities not addressed
above; and
f. Describe procedures for providing pollution prevention awareness of all applicable wastes,
including any wash water, disposal practices, and applicable disposal locations of such wastes, to
personnel in order to comply with the conditions of this general permit. The operator shall
implement the procedures described in the SWPPP.
5. SWPPP requirements for discharges to impaired waters, surface waters with an applicable TMDL
wasteload allocation established and approved prior to the term of this general permit, and
exceptional waters. The SWPPP shall:
a. Identify the impaired water(s), approved TMDL(s), pollutant(s) of concern, and exceptional waters
identified in 9VAC25-260-30 A 3 c, when applicable;
b. Provide clear direction that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events; and
(3) A modified inspection schedule shall be implemented in accordance with Part I B 4 or Part I B
5.
General Permit No.: VAR10
Page 9 of 21
6. Qualified personnel. The name, phone number, and qualifications of the qualified personnel
conducting inspections required by this general permit.
7. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part
III K, to sign inspection reports or modify the SWPPP.
8. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K.
B. SWPPP amendments, modification, and updates.
1. The operator shall amend the SWPPP whenever there is a change in the design, construction,
operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters
and that has not been previously addressed in the SWPPP.
2. The SWPPP must be amended if, during inspections or investigations by the operator's qualified
personnel, or by local, state, or federal officials, it is determined that the existing control measures are
ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the
SWPPP shall include additional or modified control measures designed and implemented to correct
problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary
for the control measure, revisions to the SWPPP shall be completed no later than seven calendar
days following approval. Implementation of these additional or modified control measures must be
accomplished as described in Part II G.
3. The SWPPP must clearly identify the contractor(s) that will implement and maintain each control
measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that
will implement and maintain a control measure.
4. The operator shall update the SWPPP no later than seven days following any modification to its
implementation. All modifications or updates to the SWPPP shall be noted and shall include the
following items:
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of the site; and
(3) Stabilization measures are initiated;
b. Documentation of replaced or modified controls where periodic inspections or other information
have indicated that the controls have been used inappropriately or incorrectly and where modified
as soon as possible;
c. Areas that have reached final stabilization and where no further SWPPP or inspection
requirements apply;
d. All properties that are no longer under the legal control of the operator and the dates on which the
operator no longer had legal control over each property;
e. The date of any prohibited discharges, the discharge volume released, and what actions were
taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge; and
g. Measures taken to address any evidence identified as a result of an inspection required under
Part 11 F.
General Permit No.: VAR10
Page 10 of 21
5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K.
C. Public Notification. Upon commencement of land disturbance, the operator shall post conspicuously a
copy of the notice of coverage letter near the main entrance of the construction activity. For linear
projects, the operator shall post the notice of coverage letter at a publicly accessible location near an
active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall
maintain the posted information until termination of general permit coverage as specified in Part I F.
D. SWPPP availability.
1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the
SWPPP available at a central location on -site for use by those identified as having responsibilities
under the SWPPP whenever they are on the construction site.
2. The operator shall make the SWPPP and all amendments, modifications, and updates available upon
request to the department, the VSMP authority, the EPA, the VESCP authority, local government
officials, or the operator of a municipal separate storm sewer system receiving discharges from the
construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are
present, notice of the SWPPP's location must be posted near the main entrance of the construction
site.
3. The operator shall make the SWPPP available for public review in an electronic format or in hard
copy. Information for public access to the SWPPP shall be posted and maintained in accordance with
Part II C. If not provided electronically, public access to the SWPPP may be arranged upon request at
a time and at a publicly accessible location convenient to the operator or his designee but shall be no
less than once per month and shall be during normal business hours. Information not required to be
contained within the SWPPP by this general permit is not required to be released.
E. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments,
modifications, and updates from commencement of land disturbance until termination of general permit
coverage as specified in Part I F.
1. All control measures must be properly maintained in effective operating condition in accordance with
good engineering practices and, where applicable, manufacturer specifications. If a site inspection
required by Part II F identifies a control measure that is not operating effectively, corrective action(s)
shall be completed as soon as practicable, but no later than seven days after discovery or a longer
period as established by the VSMP authority, to maintain the continued effectiveness of the control
measures.
2. If site inspections required by Part II F identify an existing control measure that needs to be modified
or if an additional control measure is necessary for any reason, implementation shall be completed
prior to the next anticipated measurable storm event. If implementation prior to the next anticipated
measurable storm event is impracticable, then alternative control measures shall be implemented as
soon as practicable, but no later than seven days after discovery or a longer period as established by
the VSMP authority.
F. SWPPP Inspections.
1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit
shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator
is responsible for insuring that the qualified personnel conduct the inspection.
2. Inspection schedule.
a. Inspections shall be conducted at a frequency of:
General Permit No.: VAR10
Page 11 of 21
(1) At least once every five business days; or
(2) At least once every 10 business days and no later than 48 hours following a measurable
storm event. In the event that a measurable storm event occurs when there are more than 48
hours between business days, the inspection shall be conducted no later than the next
business day.
b. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due
to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection
frequency may be reduced to once per month. If weather conditions (such as above freezing
temperatures or rain or snow events) make discharges likely, the operator shall immediately
resume the regular inspection frequency.
c. Representative inspections may be utilized for utility line installation, pipeline construction, or
other similar linear construction activities provided that:
(1) Temporary or permanent soil stabilization has been installed and vehicle access may
compromise the temporary or permanent soil stabilization and potentially cause additional
land disturbance increasing the potential for erosion;
(2) Inspections occur on the same frequency as other construction activities;
(3) Control measures are inspected along the construction site 0.25 miles above and below each
access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature
intersects the construction activity and access does not compromise temporary or permanent
soil stabilization); and
(4) Inspection locations are provided in the report required by Part II F.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and when applicable the date and rainfall amount
of the last measurable storm event;
(2) Record the information and a description of any discharges occurring at the time of the
inspection;
(3) Record any land -disturbing activities that have occurred outside of the approved erosion and
sediment control plan;
(4) Inspect the following for installation in accordance with the approved erosion and sediment
control plan, identification of any maintenance needs, and evaluation of effectiveness in
minimizing sediment discharge, including whether the control has been inappropriately or
incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping
measures;
(c) Completed earthen structures, such as dams, dikes, ditches, and diversions for
stabilization;
General Permit No.: VAR10
Page 12 of 21
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other measures installed to control
sediment discharge from stormwater;
(f) Temporary or permanent channel, flume, or other slope drain structures installed to
convey concentrated runoff down cut and fill slopes;
(g) Storm inlets that have been made operational to ensure that sediment laden stormwater
does not enter without first being filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access paved roads for minimizing
sediment tracking;
(5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for initiation of stabilization activities;
(6) Inspect areas that have reached final grade or that will remain dormant for more than 14 days
for completion of stabilization activities within seven days of reaching grade or stopping work;
(7) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu
of a plan," or erosion and sediment control plan prepared in accordance with department -
approved annual standards and specifications has not been properly implemented. This
includes but is not limited to:
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets or channels that
have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to
remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins
that discharge to surface waters. Inlets and catch basins with failing sediments controls
due to improper installation, lack of maintenance, or inadequate design are considered
unprotected;
(d) Sediment deposition on any property (including public and private streets) outside of the
construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed on portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins that
allow the discharge of stormwater from below the surface of the wet storage portion of
the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow the
discharge of stormwater from below the surface of the wet storage portion of the trap;
and
(h) Land disturbance outside of the approved area to be disturbed;
(8) Inspect pollutant generating activities identified in the pollution prevention plan for the proper
implementation, maintenance and effectiveness of the procedures and practices;
(9) Identify any pollutant generating activities not identified in the pollution prevention plan; and
General Permit No.: VAR10
Page 13 of 21
(10) Identify and document the presence of any evidence of the discharge of pollutants prohibited
by this general permit.
4. Inspection report. Each inspection report shall include the following items:
a. The date and time of the inspection and when applicable, the date and rainfall amount of the last
measurable storm event;
b. Summarized findings of the inspection;
c. The location(s) of prohibited discharges;
d. The location(s) of control measures that require maintenance;
e. The location(s) of control measures that failed to operate as designed or proved inadequate or
inappropriate for a particular location;
f. The location(s) where any evidence identified under Part II F 3 a (7) exists;
g. The location(s) where any additional control measure is needed that did not exist at the time of
inspection;
h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as
a result of the inspection or to maintain permit compliance;
i. Documentation of any corrective actions required from a previous inspection that have not been
implemented; and
j. The date and signature of the qualified personnel and the operator or its duly authorized
representative.
The inspection report and any actions taken in accordance with Part II must be retained by the operator
as part of the SWPPP for at least three years from the date that general permit coverage expires or is
terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection
report does not identify any incidents of noncompliance, the report shall contain a certification that the
construction activity is in compliance with the SWPPP and this general permit. The report shall be signed
in accordance with Part III K of this general permit.
G. Corrective actions.
1. The operator shall implement the corrective action(s) identified as a result of an inspection as soon as
practicable but no later than seven days after discovery or a longer period as approved by the VSMP
authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP
authority, or the department) is necessary, additional control measures shall be implemented to
minimize pollutants in stormwater discharges until such approvals can be obtained.
2. The operator may be required to remove accumulated sediment deposits located outside of the
construction activity covered by this general permit as soon as practicable in order to minimize
environmental impacts. The operator shall notify the VSMP authority and the department as well as
obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the
removal of sediments accumulated in surface waters including wetlands.
General Permit No.: VAR10
Page 14 of 21
PART III
CONDITIONS APPLICABLE TO ALL VPDES PERMITS
NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor
stormwater discharges or control measures, the operator must comply with the requirements of
subsections A, B, and C, as appropriate.
A. Monitoring.
1. Samples and measurements taken for the purpose of monitoring shall be representative of the
monitoring activity.
2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or
alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures
have been specified in this general permit. Analyses performed according to test procedures
approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under
regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46).
3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and
analytical instrumentation at intervals that will ensure accuracy of measurements.
B. Records.
1. Monitoring records and reports shall include:
a. The date, exact place, and time of sampling or measurements;
b. The individual(s) who performed the sampling or measurements;
c. The date(s) and time(s) analyses were performed;
d. The individual(s) who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
2. The operator shall retain records of all monitoring information, including all calibration and
maintenance records and all original strip chart recordings for continuous monitoring instrumentation,
copies of all reports required by this general permit, and records of all data used to complete the
registration statement for this general permit, for a period of at least three years from the date of the
sample, measurement, report or request for coverage. This period of retention shall be extended
automatically during the course of any unresolved litigation regarding the regulated activity or
regarding control standards applicable to the operator, or as requested by the board.
C. Reporting monitoring results.
1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in
accordance with this general permit, unless another reporting schedule is specified elsewhere in this
general permit.
2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided,
approved or specified by the department; or in any format provided that the date, location, parameter,
method, and result of the monitoring activity are included.
General Permit No.: VAR10
Page 15 of 21
3. If the operator monitors any pollutant specifically addressed by this general permit more frequently
than required by this general permit using test procedures approved under 40 CFR Part 136 or using
other test procedures approved by the U.S. Environmental Protection Agency or using procedures
specified in this general permit, the results of this monitoring shall be included in the calculation and
reporting of the data submitted in the DMR or reporting form specified by the department.
4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic
mean unless otherwise specified in this general permit.
D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which
the board may request to determine whether cause exists for modifying, revoking and reissuing, or
terminating this general permit or to determine compliance with this general permit. The board,
department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans,
specifications, and other pertinent information as may be necessary to determine the effect of the wastes
from his discharge on the quality of surface waters, or such other information as may be necessary to
accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall
also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required
to be kept by this general permit.
E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports
on, interim and final requirements contained in any compliance schedule of this general permit shall be
submitted no later than 14 days following each schedule date.
F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in
compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater
discharge from a construction activity.
G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of
sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous
substance or oil in an amount equal to or in excess of a reportable quantity established under either 40
CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs
during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge
that may reasonably be expected to enter surface waters, shall notify the Department of Environmental
Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24
hours after said discovery. A written report of the unauthorized discharge shall be submitted to the
department and the VSMP authority within five days of discovery of the discharge. The written report shall
contain:
1. A description of the nature and location of the discharge;
2. The cause of the discharge;
3. The date on which the discharge occurred;
4. The length of time that the discharge continued;
5. The volume of the discharge;
6. If the discharge is continuing, how long it is expected to continue;
7. If the discharge is continuing, what the expected total volume of the discharge will be; and
8. Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or
any future discharges not authorized by this general permit.
General Permit No.: VAR10
Page 16 of 21
Discharges reportable to the department and the VSMP authority under the immediate reporting
requirements of other regulations are exempted from this requirement.
H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a
"bypass" or "upset," as defined herein, should occur from a facility and the discharge enters or could be
expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours,
the department and the VSMP authority by telephone after the discovery of the discharge. This
notification shall provide all available details of the incident, including any adverse effects on aquatic life
and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to
the department and the VSMP authority within five days of discovery of the discharge in accordance with
Part III 1 2. Unusual and extraordinary discharges include but are not limited to any discharge resulting
from:
1. Unusual spillage of materials resulting directly or indirectly from processing operations;
2. Breakdown of processing or accessory equipment;
3. Failure or taking out of service of some or all of the facilities; and
4. Flooding or other acts of nature.
I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect
surface waters or may endanger public health.
1. An oral report to the department and the VSMP authority shall be provided within 24 hours from the
time the operator becomes aware of the circumstances. The following shall be included as
information that shall be reported within 24 hours under this subdivision:
a. Any unanticipated bypass; and
b. Any upset that causes a discharge to surface waters.
2. A written report shall be submitted within five days and shall contain:
a. A description of the noncompliance and its cause;
b. The period of noncompliance, including exact dates and times, and if the noncompliance has not
been corrected, the anticipated time it is expected to continue; and
c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.
The department may waive the written report on a case -by -case basis for reports of noncompliance
under Part III I if the oral report has been received within 24 hours and no adverse impact on surface
waters has been reported.
3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in writing
as part of the SWPPP. The reports shall contain the information listed in Part III 12.
NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP
authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours,
leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the
Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-
8892.
General Permit No.: VAR10
Page 17 of 21
4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect
information in any report, including a registration statement, to the department or the VSMP authority,
the operator shall promptly submit such facts or correct information.
J. Notice of planned changes.
1. The operator shall give notice to the department and the VSMP authority as soon as possible of any
planned physical alterations or additions to the permitted facility or activity. Notice is required only
when:
a. The operator plans an alteration or addition to any building, structure, facility, or installation that
may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-
420;
b. The operator plans an alteration or addition that would significantly change the nature or increase
the quantity of pollutants discharged. This notification applies to pollutants that are not subject to
effluent limitations in this general permit; or
2. The operator shall give advance notice to the department and VSMP authority of any planned
changes in the permitted facility or activity, which may result in noncompliance with state permit
requirements.
K. Signatory requirements.
1. Registration statement. All registration statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a
responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the
corporation in charge of a principal business function, or any other person who performs similar
policy -making or decision -making functions for the corporation; or (ii) the manager of one or more
manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the
explicit or implicit duty of making major capital investment recommendations, and initiating and
directing other comprehensive measures to assure long-term compliance with environmental laws
and regulations; the manager can ensure that the necessary systems are established or actions
taken to gather complete and accurate information for state permit application requirements; and
where authority to sign documents has been assigned or delegated to the manager in
accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or
ranking elected official. For purposes of this chapter, a principal executive officer of a public
agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer
having responsibility for the overall operations of a principal geographic unit of the agency.
2. Reports, etc. All reports required by this general permit, including SWPPPs, and other information
requested by the board or the department shall be signed by a person described in Part III K 1 or by a
duly authorized representative of that person. A person is a duly authorized representative only if:
a. The authorization is made in writing by a person described in Part III K 1;
b. The authorization specifies either an individual or a position having responsibility for the overall
operation of the regulated facility or activity such as the position of plant manager, operator of a
well or a well field, superintendent, position of equivalent responsibility, or an individual or position
having overall responsibility for environmental matters for the operator. (A duly authorized
General Permit No.: VAR10
Page 18 of 21
representative may thus be either a named individual or any individual occupying a named
position); and
c. The signed and dated written authorization is included in the SWPPP. A copy must be provided to
the department and VSMP authority, if requested.
3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a
different individual or position has responsibility for the overall operation of the construction activity, a
new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority
as the administering entity for the board prior to or together with any reports or information to be
signed by an authorized representative.
4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following
certification:
"I certify under penalty of law that I have read and understand this document and that this document
and all attachments were prepared in accordance with a system designed to assure that qualified
personnel properly gathered and evaluated the information submitted. Based on my inquiry of the
person or persons who manage the system, or those persons directly responsible for gathering the
information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the
possibility of fine and imprisonment for knowing violations."
L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit
noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water
Act, except that noncompliance with certain provisions of this general permit may constitute a violation of
the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds
for enforcement action; for state permit termination, revocation and reissuance, or modification; or denial
of a state permit renewal application.
The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean
Water Act for toxic pollutants within the time provided in the regulations that establish these standards or
prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been
modified to incorporate the requirement.
M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the
expiration date of this general permit, the operator shall submit a new registration statement at least 90
days before the expiration date of the existing general permit, unless permission for a later date has been
granted by the board. The board shall not grant permission for registration statements to be submitted
later than the expiration date of the existing general permit.
N. Effect of a state permit. This general permit does not convey any property rights in either real or
personal property or any exclusive privileges, nor does it authorize any injury to private property or
invasion of personal rights, or any infringement of federal, state or local law or regulations.
O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal
action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant
to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except
as provided in general permit conditions on "bypassing" (Part III U) and "upset' (Part III V), nothing in this
general permit shall be construed to relieve the operator from civil and criminal penalties for
noncompliance.
P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the
institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to
which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water
Control Law or § 311 of the Clean Water Act.
General Permit No.: VAR10
Page 19 of 21
Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all
facilities and systems of treatment and control (and related appurtenances), which are installed or used
by the operator to achieve compliance with the conditions of this general permit. Proper operation and
maintenance also includes effective plant performance, adequate funding, adequate staffing, and
adequate laboratory and process controls, including appropriate quality assurance procedures. This
provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by
the operator only when the operation is necessary to achieve compliance with the conditions of this
general permit.
R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or
management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such
materials from entering surface waters and in compliance with all applicable state and federal laws and
regulations.
S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of
this general permit that has a reasonable likelihood of adversely affecting human health or the
environment.
T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an
enforcement action that it would have been necessary to halt or reduce the permitted activity in order to
maintain compliance with the conditions of this general permit.
U. Bypass.
1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any
portion of a treatment facility. The operator may allow any bypass to occur that does not cause
effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient
operation. These bypasses are not subject to the provisions of Part III U 2 and 3.
2. Notice
a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall
submit prior notice to the department, if possible at least 10 days before the date of the bypass.
b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in
Part III I.
3. Prohibition of bypass.
a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take
enforcement action against an operator for bypass unless:
(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage.
Severe property damage means substantial physical damage to property, damage to the
treatment facilities that causes them to become inoperable, or substantial and permanent
loss of natural resources that can reasonably be expected to occur in the absence of a
bypass. Severe property damage does not mean economic loss caused by delays in
production;
(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment
facilities, retention of untreated wastes, or maintenance during normal periods of equipment
downtime. This condition is not satisfied if adequate back-up equipment should have been
installed in the exercise of reasonable engineering judgment to prevent a bypass that
occurred during normal periods of equipment downtime or preventive maintenance; and
(3) The operator submitted notices as required under Part III U 2.
General Permit No.: VAR10
Page 20 of 21
b. The department may approve an anticipated bypass, after considering its adverse effects, if the
department determines that it will meet the three conditions listed in Part III U 3 a.
V. Upset.
1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is
unintentional and temporary noncompliance with technology -based state permit effluent limitations
because of factors beyond the reasonable control of the operator. An upset does not include
noncompliance to the extent caused by operational error, improperly designed treatment facilities,
inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation.
2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -
based state permit effluent limitations if the requirements of Part III V 4 are met. A determination
made during administrative review of claims that noncompliance was caused by upset, and before an
action for noncompliance, is not a final administrative action subject to judicial review.
3. An upset does not include noncompliance to the extent caused by operational error, improperly
designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or
careless or improper operation.
4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through
properly signed, contemporaneous operating logs or other relevant evidence that:
a. An upset occurred and that the operator can identify the cause(s) of the upset;
b. The permitted facility was at the time being properly operated;
c. The operator submitted notice of the upset as required in Part III I; and
d. The operator complied with any remedial measures required under Part III S.
5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the
burden of proof.
W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP
authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon
presentation of credentials and other documents as may be required by law to:
1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or
where records must be kept under the conditions of this general permit;
2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of
this general permit;
3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and
control equipment), practices, or operations regulated or required under this general permit; and
4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as
otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any
substances or parameters at any location.
For purposes of this section, the time for inspection shall be deemed reasonable during regular business
hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection
unreasonable during an emergency.
General Permit No.: VAR10
Page 21 of 21
X. State permit actions. State permits may be modified, revoked and reissued, or terminated for cause.
The filing of a request by the operator for a state permit modification, revocation and reissuance, or
termination, or a notification of planned changes or anticipated noncompliance does not stay any state
permit condition.
Y. Transfer of state permits.
1. State permits are not transferable to any person except after notice to the department. Except as
provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the
state permit has been modified or revoked and reissued, or a minor modification made, to identify the
new operator and incorporate such other requirements as may be necessary under the Virginia
Stormwater Management Act and the Clean Water Act.
2. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a
new operator if:
a. The current operator notifies the department at least 30 days in advance of the proposed transfer
of the title to the facility or property;
b. The notice includes a written agreement between the existing and new operators containing a
specific date for transfer of state permit responsibility, coverage, and liability between them; and
c. The department does not notify the existing operator and the proposed new operator of its intent
to modify or revoke and reissue the state permit. If this notice is not received, the transfer is
effective on the date specified in the agreement mentioned in Part III Y 2 b.
3. For ongoing construction activity involving a change of operator, the new operator shall accept and
maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over
operations at the site.
Z. Severability. The provisions of this general permit are severable, and if any provision of this general
permit or the application of any provision of this state permit to any circumstance, is held invalid, the
application of such provision to other circumstances and the remainder of this general permit shall not be
affected thereby.
Section 12. Inspection logs
INSPECTION FREQUENCY:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at
least once every five business days and no later than 48 hours following a measurable storm event. In
the event that a measurable storm event occurs when there are more than 48 hours between business
days, the inspection shall be conducted on the next business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired
or for which a TMDL wasteload allocation has been established and approved prior to the term of this
general permit.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount (Inches) Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(Y/N)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Qualified Personnel
Note: If msepction report does not identify any mci
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
nce
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Other obvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leaving the
site? (Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describe measures taken to
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount (Inches) Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(Y/N)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Qualified Personnel
Note: If msepction report does not identify any mci
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
nce
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Other obvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leaving the
site? (Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describe measures taken to
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page 1
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount (Inches) Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(Y/N)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT STORMWATER DISHCARGE OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
164d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Qualified Personnel
Note: If msepction report does not identify any mci
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
nce
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Other obvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leaving the
site? (Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describe measures taken to
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?