HomeMy WebLinkAboutSUB201700112 Review Comments Road Plan and Comps. 2019-07-05County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
434-296-5832
Memorandum
To: Matthew Wentland
From: Christopher Perez, Senior Planner
Division: Planning
Date: July 5, 2019
Subject: SUB2017-112 North Pointe Northwest Residential Area - Road Plan
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the
following comments have been satisfactorily addressed:
[32.7.2.2, 14-410(H), 14-234(C)3] Sidewalks and Landscape Strips. Provide sidewalks and landscape
strips on both sides of all private streets throughout the development, regardless of driveways.
As discussed over the phone on Friday 4-19-19. Please revise the 20' buffer on the "rear" of lots 7-14
(Building 2) adjacent to Dillon Drive to depict and label a 6' landscape strip and a 14' buffer
easement, combined this area will make up the 20' buffer area to plant the required screening and the
required street trees. Rev 4. Comment addressed.
2. [32.7.2.2, 14-410(H), 14-422(D), 14-422(E), 14-422(F), 32.3.5(b)] Sidewalk and Landscape Strip
Design. The planting strips shall be located between the curb and the sidewalk. In order to flip the
arrangement of the sidewalks and landscape strips a Special Exception shall be approved by the PC.
This item has been scheduled for the May Th PC meeting. Rev 4. Comment addressed.
[ZMA2013-14, ZMA2000-91 Proffer 5.3.1(c)(1). Phase III Road Improvements required to be
approved and either built or bonded before final site plan approval. Rev 4. Comment provided for
informational purposes with road plan.
4. [ZMA2013-14, ZMA2000-91 Proffer 5.3.3.
5.3.3 Prior to the approval of plans for improvements at any U.S. Route 29 intersection,
Owner shall provide VDOT traffic signal network timing plans that VDOT finds acceptably
address the impacts of the proposed traffic signals for peak traffic periods.
Rev 4. Comment applicable and to be addressed on SUB2016-196.
[SP2006-34] Condition #1. County and VDOT approval of the final lane configuration for the
Northwest Passage over the stream crossing with the final road plans. Rev 4. Comment addressed.
6. [SP2006-34] Condition #2. County and VDOT approval of final design plans and
hydrologic/hydraulic computations for the stream crossing. Rev 4. SP condition has not been
satisfied.
7. [SP2006-34] Condition #9. All of the above noted landscaping shall be shown on the road plans
submitted for the Northwest Passage prior to final site plan approval. The plans shall include complete
planting schedule key to the plan. The plans are subject to approval of the Design Planner. Rev 4.
Comment addressed.
[SP2006-34] Condition #5. Provide a stream buffer mitigation plan for approval by the Natural
Resources Manager in accordance with this condition. Per conversations with Engineering the
applicant is taking care of this item in the WPO plan. Rev 4. Comment addressed.
9. [32.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the
final site plan. Additionally, landscaping shall also be in conformity with the conditions of approval of
SP2006-34, ZMA2013-14. The landscape plan requires revisions pursuant to the landscape comments
throughout this comment review letter. Rev 4. Comment addressed.
10.132.5.2(i),15.2.1(3,14-233(B)1,14-233(B)1,14-234,14-306] Submit a private street request, this must
be submitted and approved prior to final subdivision and final site plan approval. This private street
request can be reviewed administratively due to the presence of attached dwellings. A maintenance
agreement for the private street must be submitted for review and approval by the County Attorney's
Office with the final subdivision application. Rev 4. Comment addressed.
11. 132.7.9.51 Street Trees. Revise the landscape schedule to provide the caliper and the height at time of
planting for all street trees. Medium street trees are required to be 1" to 1.25" min caliper. Revise the
canopy calculations provided for the trees, as many do not correspond with the County's approved tree
canopy chart.
Ex) - Black Willow - Sugar Hackberry - Red Maple Rev 4. Comment addressed.
12. [32.7.9.5(d)] Street Trees. Revise the landscape and tree tabulation chart to utilize 1/40' standard of
medium shade trees for the private roads. Also, ensure all tree counts are correct with the modification.
Rev 4. Comment addressed.
13. [Comment] While it was previously decided the proposed layout could be submitted for review without
the County requiring a variation to the rezoning, the proposal shall still meet all required county
standards or obtain waivers to these standards. The County permitting the project layout to move
forward without a variation shall not be a reason for justification of the waivers. It appears this
development is having substantial trouble meeting the minimum road standards for private streets. This
issue continues to be the driving force behind most of the remaining comments. Waivers are intended to
be the exception not a requirement for the project being able to be built. Staff suggests you redesign to
avoid any waivers. Waivers have been received and are scheduled to the PC's May 7' meeting for
action. Rev 4. Comment addressed.
14. [Comment] The 6' planting strip scales 5' on the plans from the dashed line, which appears to
signifying the edge of the right-of-way, but crosses onto the driveways by 1', please explain what is
taking place. Is this a line error? Please correct it. Rev 4. Comment addressed.
15. [Comment] The plan has a revised note which reads: "5' sidewalk and landscape maintenance
easement"; previously this easement was labeled as a 10.5' easement. Should it truly be a 6'
landscaping maintenance easement as the sidewalks are included in the private street right-of-way now
and the 6' planting strips are on individual properties? Please explain what is taking place. Rev 4.
Comment addressed.
16. [Comment] The plans provides "no parking signs" and "stop signs" on individual lots outside of the
planting strip maintenance easement and the R/W. How will these signs be maintained? Will easements
be places over them? If so, depict and label the easements. Rev 4. Comment addressed.
17. [ZMA2013-14 Proffer 5.3.1(c), SP2006-34 Conditions] The road plan shall not be approved until SP
conditions #4 and #2 have been satisfied.
Condition #4: County approval of a grading and erosion and sediment control plan prior to issuance of
a grading permit for modification of the existing stream crossing. Condition #2. County and VDOT
approval of final design plans and hydrologic/hydraulic computations for the stream crossing.
Proffer 5.3.1(c) stipulates that prior to the approval of a subdivision plat or a site plan that the Owner
must obtain all associated permits and post all associated bonds required to construct the phase III road
improvements.
The grading and erosion and sediment control plan cannot be approved by the County until the final
design plans and hydrologic/hydraulic computations for the stream crossing are approved by VDOT and
the County. Please submit the final design plans and hydrologic/hydraulic computations for the stream
crossing to VDOT and the County for review.
18. [ZMA2013-14, ZMA2000-9] Proffer 9.2(b). Prior to road plan approval the County Transportation
Planner shall review and approve the locations of the two proposed bus stop locations. The plans were
distributed to Kevin McDermott. His comments will be forwarded once received.
19. [ZMA2013-14, ZMA2000-9, Engineering Design Standards Manual] Minimum Design. The
proposed guard rail mentioned in VDOT's review will need to be removed if unwarranted or
redesigned to VDOT standards. If it is to remain, it must be located within the VDOT ROW and not in
an easement on land to be dedicated to the County.
Please contact Christopher Perez in the Planning Division by using cperezkalbemarle.org or 434-296-
5832 ext. 3443 for further information.