Loading...
HomeMy WebLinkAboutSDP201900032 Review Comments Initial Site Plan 2019-07-02COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 Stephen C. Brich, P.E. Commissioner July 2, 2019 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Tori Kanellopoulos Re: Lochlyn Hill Phase IV — Initial Site Plan & Preliminary Plat SDP-20 19-00032 SUB-2019-00086 Review #1 Dear Ms. Kanellopoulos: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 20 May 2019, and offers the following comments: 1. PIease remove the parallel parking delineators; they will not be maintained. 2. Ensure that there is adequate sight distance at the Nicholson Street intersection. 3. Sidewalk outside the ROW will not be maintain. 4. Note that the final site and subdivision plans must show conformance with the VDOT Road Design Manual Appendices B(1) and F, as well as any other applicable standards, regulations or other requirements. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING