RE: SDP201900023 UVA Encompass Health — Initial Site Plan
Mr. Hash:
The Agent for the Board of Supervisors hereby grants administrative conditional approval to the
above referenced site plan.
The approval shall be valid for a period of five (5) years from the date of this letter, provided
that the developer submits a final site plan for all or a portion of the site within one (1) year
after the date of this letter as provided in section 32.4.3.1 of Chapter 19 of the Code of the
County of Albemarle, and thereafter diligently pursues approval of the final site plan.
In accordance with Chapter 18 Section 32.4.2. 8 Early or Mass Grading may be permitted after
the following approvals are received:
1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the
Code of the County of Albemarle.
2. Approval of all easements for facilities for stormwater management and drainage
control.
3. Submittal of a tree conservation checklist with areas for tree preservation identified.
The final site plan will not be considered to have been officially submitted until the following
items are received:
1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the
Code.
2. A fee of $1,613 for the final site plan application.
3. A Consistency with the Comprehensive Plan (CCP) application has been approved for the
proposed use of this development (`public use').
Please submit 9 copies of the final plans to the Community Development Department. The
assigned Lead Reviewer will then distribute the plans to all reviewing agencies (for ACSA, please
submit 3 copies of construction plans directly to them, as stated in their comments). Once you
receive the first set of comments on the final site plan, please work with each reviewer
individually to satisfy their requirements. Please note that there is a separate application
process for final ARB approval (please contact Margaret Maliszewski
mmaliszewski albemarle.or ).
The Department of Community Development shall not accept submittal of the final site plan for
signature until tentative approvals for the attached conditions from the following agencies/
reviewers have been obtained:
1. Albemarle County Engineering Services (Engineer)- 2 copies [Matt Wentland;
mwentland@albemarle.ore]
2. Albemarle County Planning Services (Planner)- 3 copies [Tori Kanellopoulos;
vkanello oulos albemarle.or ]
3. Albemarle County Inspections Services (Inspections)- 1 copy [Michael Dellinger;
mdellinger@albemarle.org]
4. Albemarle County Department of Fire Rescue-1 copy [Shawn Maddox;
smaddox@albemarle.org]
5. Albemarle County Service Authority- See comments for number of copies to ACSA
[Richard Nelson; rnelson@serviceauthority.or ]
6. Virginia Department of Transportation- 1 copy [Adam Moore;
adam. moore@vdot.vireinia.govl
7. RWSA —1 copy [Dyon Vega; dve a rivanna.or ]
If you have any questions about these conditions or the submittal requirements, please feel
free to contact me at 434-296-5832 ext. 3270 or vkanellopoulos@albemarle.org.
Sincerely,
Y
Tori Kanellopoulos
Planner
County of Albemarle
Department of Community Development
Memorandum
To: John Hash
From: Tori Kanellopoulos - Planner
Division: Planning Services
Date: June 20, 2019; updated July 12, 2019
Subject: SDP201900023- UVA Encompass Rehabilitation Hospital - Initial Site Plan
The Planner for the Planning Services Division of the Albemarle County Department Community
Development will recommend approve the plan referred to above when the following items
have been satisfactorily addressed. (The following comments are those that have been
identified at this time. Additional comments or conditions may be added or eliminated based
on further review.) [Each comment is preceded by the applicable reference to the Albemarle
County Code.]
Initial Site Plan Comments:
Required Prior to Initial Site Plan Approval:
1. ZMA2005-3 Proffers: Compliance with the following proffer is needed prior to initial site
plan approval:
a. Proffer 9: Historic resources: Prior to preliminary plat, preliminary site plan, or an
early grading permit in Tract 1, the Owner shall provide a survey to provide
archival record of the existing buildings within Tract 1, and shall meet VDHR
standards.
b. Updated July 12, 2019: County Zoning Staff has determined that this proffer
has been met.
Required Prior to Final Site Plan Approval:
Planning (Tor! Kanellopoulos)
2. 18-4.6.1 Frontage: A new parcel for this proposal is needed, which will have required
frontage on Loop Road. Approval of the road plan for Loop Road is needed before the
final site plan can be approved.
3. 18-4 Zoning overlays: Include the Airport Impact Area (AIA) Overlay District on Sheet
C0.0.
4. 18-32.5.2(k): Easements: Verify that all necessary easements for proposed water, sewer,
and any drainage facilities have been shown on the plan. Show and label existing and
proposed easements on utility plan and indicate if any easements are to be dedicated to
public use.
5. 18-4.1 Watersupplies and sewer systems and Proffers per ZMA2005-3: This site is on
public water and sewer (ACSA). Several of the proffers per ZMA2005-3 dealt with the
Fire Station and connection to public sewer. The site plan appears to show existing
connections to public sewer for the Fire Station. Please confirm if this connection exists,
or label as future proposed connection.
a. Proffers per ZMA 2005-3 (also attached): 8.1(D); 8.4; 8.5
6. 18-4.12.6 Parking: Please provide a letter from the zoning administrator showing the
approved parking requirements for this site, as the hospital use required spaces are
determined by the zoning administrator. If this determination has not yet been made,
please submit a request for the number of spaces needed, under public use and
hospital.
a. Updated July 8, 2019: Zoning Staff has provided approval of the proposed
number of parking spaces. An additional review will be required if the number
of spaces significantly changes for the final site plan.
7. 18-4.17 Lighting: Submit a lighting plan with the final site plan that meets the
requirements of 18-4.17 and ARB requirements.
8. 18-32.5.2 Contents of an initial site plan and 18-32.6.2 Contents of a final site plan:
a. Label the use on C0.0 as "Public Use: Hospital'
b. Include the following on sheet C0.0: "Proffers per ZMA2005-3"
c. include the Magisterial District (Rio) on Sheet C0.0.
d. Also include the Zoning District of adjacent parcels (along with owner and
DB/PG).
e. Include the distance to the centerline of the nearest existing intersection for
ingress and egress.
9. 18-32.7.9.4 Contents of a landscape plan:
a. Sheet 1-2.1 shows 8 shrubs Sheet L2.0 shows 100 shrubs for a total of 108,
however Sheet 1-3.0 lists 78 shrubs. Please revise.
b. Include a Conservation Checklist.
10. 18-32.7.9.5: Street trees:
a. Please see ARB comments as well for additional requirements.
b. The Road Plan will need to include the tree information (including caliper) and
count for the required street trees.'
11. Consistency with the Comprehensive Plan (CCP) for the use of the site
a. Per LOD2019-14, it was determined that this proposal is considered a "public
use". Staff also determined that a CCP application was needed. Tim Padalino
(Senior Planner) has been coordinating with Elise Cruz, Fred Missel, and Todd
Marshall at the UVA Foundation regarding this application. This application is
reviewed and either approved by the Planning Commission or sent to the Board
of Supervisors by the Planning Commission for final determination. Approval of
the CCP is required prior to final site plan approval.
12. ZMA2005-3 Proffers: Compliance with the following proffer is needed prior to initial site
plan approval:
a. Proffer 9: Historic resources: Prior to preliminary plat, preliminary site plan, or an
early grading permit in Tract 1, the Owner shall provide a survey to provide
archival record of the existing buildings within Tract 1, and shall meet VDHR
standards.
b. This proffer has been met.
13. ZMA2005-3 Proffers: Compliance with the following proffers per ZMA2005-3 is needed
prior to final site plan approval:
a. Proffer 3.1: Square footage: Include a table, as shown on previous site plans
under this rezoning, that shows total build out.
b. Proffer 4.3: Wetlands: Label the location of the wetlands area for future open
space.
c. Proffer 7.1: Landscaping and roads: All roads in the project must be landscaped
according to "Exhibit D: UREF's North Fork Street Tree Master Plan", filed with
Albemarle County on November 1, 1994. Ensure that the road plan for Loop
Road meets these landscaping standards.
d. Proffer 8: Fire Station
i. Proffer 8.1(D): The septic drainage field that was serving the Fire Station
must be closed and removed once the Fire Station is connected to public
sewer.
1. The submitted plat (under review by Tim Padalino) cannot be
approved until the connection to public sewer is made. The plat
shows the drainfield off -site, and drainfields must be on the same
parcel as the use they serve.
ii. Proffer 8.4: Prior to final plat or plan approval in this section of the
rezoning per ZMA2005-3 (Tracts 1 and 2 on Exhibit J): "the Applicant shall
design and construct at its sole expense, or provide sufficient bond or
other form of surety to the County in an amount sufficient to assure
construction and acceptance by the appropriate authority, a public sewer
to serve the Fire Station Parcel and, in conjunction with such construction
and upon request by the developer of the Fire Station Parcel, shall install
a lateral from the public sewer that connects the Fire Station to the
public sewer. If such a request is made, the developer of the Fire Station
Parcel shall reimburse the Applicant for its costs to design and install the
lateral, and shall pay all fees required for connecting the Fire Station to
the public sewer system."
1. Label the SAN Lateral connection to the Fire Station as "Future
Proposed SAN Lateral". This connection has not yet been made.
iii. Proffer 8.5: Once the Fire Station is connected to public sewer, the
applicant shall dedicate the Fire Station Parcel to the County within 90
days. This area is approximately 2.55 acres and is shown on Exhibit B with
the proffers approved with ZMA2005-2.
iv. Proffer 8.6: Road connection: Coordinate with Plan reviewers on the
Road Plan to ensure this connection is satisfactorily made.
14. ZMA2005-3 Proffers: Compliance with the following proffers is needed in future stages
of development. This is for informational purposes:
a. Proffers 5.3 and 5.4: All road improvements required on the application plan
(Exhibit M) for Phase I must be completed or bonded before the maximum build -
out of Phase I, based on square footage of uses. Or, VDOT must determine that
the intersections will still function at an acceptable level, as described in these
proffers. This includes the intersection of SR 649 (Airport Road) and Road A
(Lewis and Clark Drive).
i. These improvements are described in detail in Proffer 5.4(B).
ii. These improvements must meet the landscaping and buffer standards in
Proffer 7.2
b. Proffer 6.1: Recreation space: Must be completed prior to maximum build -out of
Phase 1.
15. Additional applications: The following applications and approvals are required prior to
final site plan approval:
a. 18-32.7.4.2 and 18-32.7.5.3: Easement Plats: It appears no private easements or
public non-ACSA easements are proposed. Any non-ACSA or private easements
must be included on an easement plat.
b. 18-32 and 14: Subdivision plat: A subdivision plat is needed prior to final site plan
approval. This plat has been submitted and is under review. Compliance with all
applicable ZMA2005-3 proffers is also needed prior to final plat approval.
c. 18-32.7.2 and 14: Approval of road plans is required prior to final site plan
approval.
d. 18-32.7.4.1: Approval of VSMP Plans is required prior to final site plan approval.
Engineering (Matt Wentland)
1. The UVa Research Park Loop Road VSMP and Road Plans will need to be approved
before the Final Site Plan can be approved and both will need to be bonded prior to
issuance of a grading permit for this plan.
2. The VSMP plans will need to be approved before Final Site Plan approval.
VDOT (Adam Moore)
1. See attached review comments.
Fire/Rescue (Shawn Maddox)
1. Due to the height of the building exceeding 30' the travel way must be 26' clear travel
width.
2. A knox box will be required. Please add a note indicating this requirement and that
location can be coordinated with the fire marshal's office.
3. The canopy shown at the main entrance should have a minimum clear height of 13' 6".
4. Afire flow test of the new hydrants will be required prior to final acceptance of the site.
ACSA (Richard Nelson)
I. Submit 3 copies to ACSA for review.
2. Final approval will not be given until final approval of the UVA Loop Road.
3. Final approval will not be given for Lewis and Clark designs until ACSA receives an
updated master plan.
4. Confirm if the second water meter is a redundant feed to the hospital. If so it will need
to be relocated to the other side of the site.
5. RWSA Sewer capacity certification will be required.
6. Confirm uses and licensing agency to ACSA to determine capacity fees.
7. North Fork South Zone Special Rate Fees apply.
RWSA (Dyon Vega)
1. See attached review comments.
Health Department (Alan Mazurowski)
1. No objection — see attached.
Inspections (Michael Dellinger)
I. No Objection.
Architectural Review Board (Margaret Maliszewski)
1. Administrative ARB approval. See attached review comments.
E911(Andy Slack)
1. -No Objection.
COMMONWEALTH of VIRGINIA
In Cooperation with the Thai as Jeff rvon Health Divrict' ALBEMARLE CHARLOI I L9v1LLL
State Department of Health FE(VANNACOUNTYiPAIMYRA)
1138 Rose Hill Drive GREENE COUNT Y (STANARDSL1Llf)
LOVSA COUNT Y1LOWSAj
Phone (434) 972-6219 i? 0. Box 7546 NELSON COUNTYILOVENG$ToNi
Fax (434) 972.4310
Charlottesville, Virginia 22906
June 19, 2019
Tori Kanellopoulos, Planner
Albemarle County Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: UVA Encompass Rehabilitation Hospital
Initial Site Development Plan
SDP2019-23
Ms. Kanellopoulos:
As requested, I've reviewed the Initial Site Development Plan, dated 5/6/19, for the
proposed construction referenced above. Since the water and sewer will be provided by
public utilities, and the spring vault does not appear will be impacted, I have no concerns.
If there are any questions or concerns, please give me a call, 434-972-4306.
Sincerely,
Alan Mazurowski
Environmental Health Supervisor
Thomas Jefferson Health District
alan.mazurowski[a,,vdh.virainia• gov
Tori Kanello oulos
From:
Dyon Vega <DVega@rivanna.org>
Sent:
Thursday, June 13, 2019 9:39 AM
To:
Tori Kanellopouios
Cc:
vfort@rivanna.org; Richard Nelson
Subject:
UVA Encompass Rehabilitation Hospital comments
Tori,
RWSA has reviewed the Initial Site Plan for UVA Encompass Rehabilitation Hospital as prepared by Timmons Group and
dated 05/06/2019 and has the following comments:
General Plan Comments:
An RWSA sewer flow acceptance letter may be required prior to final site plan approval, please provide estimates of
sewer flows for the development with the final site plan.
Dyon Vega
Civil Engineer
IVANNA
WATER &SEW€R.07HORITY�� .'
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.or�
,4.
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orarge Road
Stephen C. Srich, P.E.ulpeper Yrgrua 2270P.E.
Commissioner
June 14, 2019
Tori Kanellopoulos
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP-2019-00023-UVA Encompass Health — Initial Site Plan
Dear Ms. Kanellopoulos:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Timmons Group, dated May 06,
2019 and offer the following comments.
I. These comments are based on the assumption that the "Loop Road will be private.
2. Please provide turn lane warrants for the connection of the Private Loop Road and the
public Innovation Drive,
3. Please label on plans that Innovation drive is a public road, also label right of way, speed
limit and route number. And label Loop Road as private.
4. Please note that the final site plan must show conformance with the VDOT Road Design
Manual Appendices B (1) and F, as well as any other applicable standards, regulations, or
other requirements.
A VDOT Land Use Permit will be required prior to any work within the right of way. The
owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399
for information pertaining to this process. Please provide two copies of the revised plan along
with a comment response Ietter. If further information is desired, please contact Willis C.
Bedsaul at 434-422-9866.
Sincerely,
WA11-
Adam J. Mo re, P.E.
Area Land Use Engineer
Charlottesville Residency
WE KEEP VIRGINIA MOVING
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
MEMORANDUM
TO:
Tori KaneIIopoulos
FROM:
Margaret Maliszewski
RE:
Encompass Health Initial Site Plan
DATE:
June 14, 2019
I have reviewed the above -noted initial site plan dated 5/6/2019 and can recommend approval of the initial
plan to the Agent for the Site Review Committee for the ARB. Please note the following:
• Regarding reguirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and
recommended conditions of initial plan approval:
o None.
o Note that a Certificate of Appropriateness is required prior to final site plan approval.
• Regarding recommendations on the plan as it relates to the guidelines:
o None.
Regarding conditions to be satisfied prior to issuance of a grading permit:
o Include tree protection fencing on the landscape and grading plans.
o Include a conservation checklist in the plan.
Regarding the final site plan submittal:
A Certificate of Appropriateness is required prior to final site plan approval. The following items
and all items on the ARB Final Site Plan checklist must be addressed in an ARB
application/submittal for a Countywide Certificate of Appropriateness:
1. Provide large shade trees, 2%" caliper at planting, 40' on center along the loop road.
2. Provide large shade trees, 2%z" caliper at planting, 40' on center at all parking lot perimeters.
3. Some trees are shown very close to underground pipes. Ensure pipes are at least 7' from
trees.
4. Add the standard plant health note to the site plan: All site plantings of tree., and shrubs .shall
he allowed to reach, and be maintained at, mature height; the topping of trees is prohibited.
Shrubs and trees shall be pruned minimally and only to support the overall health of the
plant.
5. A single shrub type is proposed (78 Ilex Verticillata). Limit the number of proposed plants
for any one species to 25% of the total proposed for that plant type (tree or shrub).
6. Show tree protection fencing on the landscape and grading plans. Include a conservation
checklist in the plan.