HomeMy WebLinkAboutSDP201800037 Correspondence 2019-07-23WAI
WOOLLEY ENGINEERING
July 23, 2019
MEMORANDUM
To: Mr. Cameron Langille, Senior Planner
County of Albemarle, Virginia
From: Mr. Eric Woolley, PE
Woolley Engineering
Regarding: Crutchfield Corporation - SDP201800037 (TM 32 P 9C)
Minor Site Plan Amendment #1 to SDP200400108
Responses to comments from County Staff
With this memo, I am responding to the final comments that were directed to our office following
the review of our minor site plan amendment for the Crutchfield Corporation call center expansion
project located at 1540 Quiet Acres Lane. The comments were received in written format and dated
June 13, 2018 (1�` Revision: August 28, 2018). I have attached this response memorandum to five
(5) revised copies of the site plan.
Planning Second Review Comments
7. Note #6 and note #13 on C1.0 have been revised.
8. Recorded deed book and page numbers for the new SWM/BMP and drainage easements
have been added to the cover sheet and to the applicable plan sheets.
The site plan has been tentatively approved via an electronic submission and is ready for final
signatures. Thanks for being so responsive during the site plan approval process. It has been a
pleasure to work with you and the rest of the staff.
Sincerely,
RECEIVED
Eric Woolley, PE
JUL P 3 2019
Attached: (5) Site Plan COMMUNITY
DEVELOPMENT
Cc: Bill Crutchfield, Crutchfield Corporation
Bill Adams, Train Architects
File
WOOLLEY ENGINEERING 22o East High Street (434) 973-0045
Charlottesville, Virginia 22902