Loading...
HomeMy WebLinkAboutSDP198300014 Approval - County Final Site Plan and Comps. 1983-05-24OF ALSZ4, itGlly ROBERT W. TUCKER. JR. DEPARTMENT of PLANNING Director of Planning 401 McIntire Road Charlottesville, Va. 22901-4596 804-296-5823 May 25, 1983 Mr. James Gercke Gercke Development Company P. O. Box 7213 Charlottesville, VA 22901 RE: Riverrun, Phase II, Exton Court Site Plan (Portions of parcels 17A and 17B, tax map 62) Dear James, RONALD S. KEELER Assistant Director of Planning R. KEITH MABE Principal Planner NANCY MASON CAPERTON Senior Planner KATHERINE L. IMHOFF Planner The Albemarle County Planning Commission, at its meeting on May 24, 1983, approved the above -noted site plan subject to the following conditions: 1. Building permits for any unit or group of units will be processed when the applicant has met the following conditions: a. Albemarle County Service Authority approval of water and sewer plans; b. Staff approval of the landscaping plan; C. County Engineer approval of locations of easements; d. County Engineer review and approval of final drainage plans for any unit or group of units to include provisions for roof drainage and lot grading; e. County Engineer review and approval of grading plans for the townhouse units/lots. 2. Street signs shall be installed. 3. No certificate of occupancy shall be issued until the subdivision plat has been recorded. In order to expedite the completion of the above items, please have the appropriate agency or department notify Linda Thompson (296-5832) in the Inspections Department, in writing, that the applicable conditions have been met. Mr. James Gercke page 2 Please note that the Zoning Ordinance requires that construction be commenced within eighteen (18) months of the date of approval or the approval will be void. If you should have any questions, please do not hesitate to call me. Sincerely, N. Mason Caperton Senior Planner NMC/jcw cc: Planning staff Mr. James R. Butler Mr. Lou Rossi Mr. Maynard Elrod Mr. Thomas B. Lincoln Ms. Linda Thompson