Loading...
HomeMy WebLinkAboutWPO201900036 Bond Estimates 2019-07-29Project Name: VESCP /WP0201900036 Sime Pond WPO file number: WP0201900036 TM P(s): 04200-00-00-059BO Date Estimate Completed: 07-24-19, M. Myers- Revised 7-26-19 GE Erosion and Sediment Control Bond Estimate Item Item Number I stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length ft 9 Sediment Trap #1 10 earthwork for trap/basin 11 height of dam at toe 12 height of fill at faceOft ft 13 length of damft 14 top width ft 15 (area above transition 3 sf 16 (total width of dam) 2 ft 17 (height below transitio 0 ft 18 (area below transition; 0 sf 19 (total fill volume) 0.1 cy 20 length of spillway ft 21 width ofspillway ft 22 structures for basin 23 riser height '94ft 24 riser diameter 0 in 25 barrel length 0 ft 26 barrel diameter in 27 28 29 30 silt fence inlet protection (IP) 31 stone inlet protection (IP) 32 outlet protection (OP)-Trap#1 length ft 33 outlet protection (0P)-Basin#1 length ft 34 outlet protection (OP) length 0 ft 35 channel (SCC, matted) length 110 ft 36 check dam depth in channel _ 0 ft 37 construction entrance (CE) 38 wash rack 39 paved construction entrance 40 rip -rap, placed depth 3 ft 41 width 42 43 survey and layout (price per 0.1 mi.) acres - 44 mobilization 45 Mud Traps No. Unit Unit Cost Cost installed acres $5,000.00 $6,000.00 300. ft $5.00 $1,500.00 0.0 ft $5.00 $0.00 80 ft $13.00 $1,040.00 pipe -in $0.00 $0.00 cut at high side ft cut at faceOft ft length of cutft width of cut (area below transitic 3 sf (total width of cut) 5 ft (depth below transit 0 ft (area above transitic 0 sf (total fill volume) 0.1 cy (TOAL CY estimate 0 cy $13.00 $0.00 (spillway stone tons 0 tons $50.00 $0.00 (riser unit price) $0.00 $0.00 base plate or fdn $200.00 $0 (barrel unit price) $0.00 $0.00 barrel collars $200.00 $0 baffle length Mft $50.00 $0 $100.00 $0.00 $200.00 $0.00 width . 0 ft 0 $0.00 $0.00 width 0 ft $0.00 $0.00 width 0 ft $0.00 $0.00 width 4 ft $572.00 channel width 0 ft $0.00 $0.00 $2,500.00 $2,500.00 $2,000.00 $0.00 0 $3,500.00 $0.00 length 80.0 ft (tons) _ $60.00 $8,280.00 traps and basins $0.00 $600.00 3 @ 150 $450.00 7/29/2019 Project Name: VESCP IWPO201900036 Sime Pond WPO file number: WP0201900036 TM P(s): 04200-00-00-059BO Date Estimate Completed: 07-24-19, M. Myers- Revised 7-26-19 GE Erosion and Sediment Control Bond Estimate Item Item Number WP0201900035 2265 Decca Lane _ESC_bond_est_09-27-17_071619 KG No. Unit Unit Cost Cost installed cost sum $20,942.00 contingency $2,094.20 Total $23,040 7/29/2019 Approximate Earthwork computations for sed Assumes all cut and fill slopes are 2.1 for simplicty Cut at High Side h2 Height of Fill at Face h1 %, w Width of Cut Fill area above transition = h1(2h1) + h1(w) Fill area below transition; total width of fill (dam) = 2h1 + w + 2h2 height below transition = h2-h1, area = (width*height)/2 - height x height Length of Cut Top I-w transitic h1 Cut at Fa liment traps and basins Width ►n point \ Height of Dam at Toe h2 ice Volume = Length of Fill x Fill Area Cut Areas and Volume is the same as fill but using the cut dimensions Fill for Dam (imately)