RWSA has reviewed the Site Plan Amendment for Pleasant Green — Phase 1 as prepared by Collins Engineering and
dated 2/4/2019, with latest revision dated 7/22/2019 and has the following comments:
General:
1. An RWSA sewer flow capacity certification will be required for Pleasant Green Phase 1 prior to final site plan
approval.
2. RWSA recommends that the applicant explore options for connecting to an existing ACSA water line prior to
proposing a direct connection to the RWSA 12" water main at Blue Ridge Avenue. If alternative water sources
are proposed, then the RWSA water connection notes on sheet 6 may be removed.
3. The existing RWSA and ACSA water lines at Blue Ridge Avenue and Farmhouse Road are not shown correctly on
sheet 6. Please show and label the continuation of the 12" RWSA water main down Blue Ridge Avenue and the
8" ACSA water line and valve that ties into the RWSA main at Farmhouse Road.
These comments were originally sent on 5/28/19, and we are happy to meet with the applicant and ACSA if that is
helpful in addressing our comments. Let me know if you have any questions.
Thanks,
Dyon Vega
Civil Engineer
VAIIIINA
WATER & SEWERAUTHONTY
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA 22902
www.rivanna.org