Loading...
HomeMy WebLinkAboutSDP201900009 Review Comments Final Site Plan and Comps. 2019-07-30Megan Nedostup From: Dyon Vega <DVega@rivanna.org> Sent: Tuesday, July 30, 2019 9:00 AM To: Megan Nedostup Cc: vfort@rivanna.org; Richard Nelson Subject: Pleasant Green Phase 1 Comments Megan, RWSA has reviewed the Site Plan Amendment for Pleasant Green — Phase 1 as prepared by Collins Engineering and dated 2/4/2019, with latest revision dated 7/22/2019 and has the following comments: General: 1. An RWSA sewer flow capacity certification will be required for Pleasant Green Phase 1 prior to final site plan approval. 2. RWSA recommends that the applicant explore options for connecting to an existing ACSA water line prior to proposing a direct connection to the RWSA 12" water main at Blue Ridge Avenue. If alternative water sources are proposed, then the RWSA water connection notes on sheet 6 may be removed. 3. The existing RWSA and ACSA water lines at Blue Ridge Avenue and Farmhouse Road are not shown correctly on sheet 6. Please show and label the continuation of the 12" RWSA water main down Blue Ridge Avenue and the 8" ACSA water line and valve that ties into the RWSA main at Farmhouse Road. These comments were originally sent on 5/28/19, and we are happy to meet with the applicant and ACSA if that is helpful in addressing our comments. Let me know if you have any questions. Thanks, Dyon Vega Civil Engineer VAIIIINA WATER & SEWERAUTHONTY Rivanna Water & Sewer Authority (434) 977-2970, Ext. 170 695 Moores Creek Lane Charlottesville, VA 22902 www.rivanna.org