Loading...
HomeMy WebLinkAboutWPO201500004 Plan - As-built WPO VSMP 2017-05-02OWNER: 061A0-09-00-02900 CA THOLIC DIOCESE OF RICHMOND 1800 CAROUSEL LANE RICHMOND, VA 23294 ENGINEER: COLLINS ENGINEERING 200 GARRETT ST. SUITE K, CHARLOTTESVILLE VA 22902 TELEPHONE.` (4311)29.33719 FAX: (434)293 2813 CONTACT` MR. SCOTT COLLINS, P.E. E-MAIL: scott@collies en gin eering.com TAX MAP NO.: 061A000-0002900 (D.B. 1802/ PG. 311) AREA: 17.09 AC. ZONING: R— 4 RESIDEN T lAL (UNDER SPECIAL USE PERMIT SP— 98— 6 7) U✓A TERSHED: MEADOW CREEK WATERSHED TOPO & SURVEY: TOPOGRAPHY AND BOUNDARY PROVIDED BY LICENSED LAND SURVEYOR COMMONWEALTH LAND SURVEYING IN DECEMBER, 2016. NAD 83 FLOODPLAIN: FEv1A MAP NO: 51003C 0287D, DATE: 2/4/05 NOTE: THIS PROJECT IS NOT LOCATED WITHIN FLOODPLAIN LIMI IS. STORMWATE4 MANAGEMENT: A LEVEL I BIORETENTION BASIN WILL PROVIDE WATER QUALITY TREATMENT FOR THIS PHASE OF THE DEVELOPMENT. AN EXISTING DOWNSTREAM DETENTION FACILITY WILL REMAIN AND WILL PROVIDE WATER !QUANTITY TREATMENT FOR THIS POR TION OF THE SI TE. VICINITY MAP SCALE: III = 21000, LT *MWATER MANAGEMEI\JT mFLA1m\jm ASBUI STO Krm" SYM BOTANICAL COMMON NAME SWM FACILITY QUANTITY PERENNIALS/HERBACEOUS SC SCIRPUS CYPERINUS WOOLGRASS (75) 1 qt. Wool Grass, V o.c. .JC JUNIPERUS CHINENSIS & CVS. CHINESEJUNIPER (46) 3gal. Juniper, 4' o.c. PV PANICUM VIRGATUM SWITCHGRASS (26) 1gal. Switchgrass, 18" O.C. SHRUBS IV ILEX VERTICILLATA WINTER BERRY 3 CA CLETHRA ALNIFOLIA RUBY SPICE SUMMERSWEET 9 TREES BN BETULA NIGRA RIVER BIRCH 1 AR ACER RUBRUM RED MAPLE 1 LS LIQUIDAMBAR STYRACIFLUA SWEETGUM 2 RIU` MAGISTERIAL DISTRICT AL3030"EMARLE COUNTY, VIRGIN /-k 10 WIDE T EAR HEN GRADED SWM ACCESS ROAD` BIORETENTION BASIN FOREBAY ` VOLUME REO'D= 584 cf --�, (797 cf PROVIDED)', , ,: 5' WIDE FOREBAY TOP OF DAM''. ELEVATION=418' M P u V (26) .. M BIORETEN , MIN. EsA51N FLOOR LS {�) IV (3) AREA REC2'D=1,8o6 sf (1,997 sf PROVIDED) 6" SCHEDULE 40 PERFORATED PVC 7� \ CLEANOUT (TYP.) i=_�\ BN {i} i 0 1: SEE DETAIL ON THIS SHEET UNDERDRAINS, INSTALLED' u AR (1) THROUGHOUT THE LOWER STONE LAYER.— IDS- ' BUILT MULCH M LINE (TYP.) i� 6" SCHEDULE 40 SOLID PVC ` , : 1 ✓ OUTLET .. O SC (7.5) 1o' WIDE LEVEL EMBANKMENT u 77- FOR ACCESS TO SPILLWAY t��' SWM ACCESS & MAINTENANCE EASEMENT s. CAS y , { y 20' WIDE GRASS LINED EMERGENCY SPILLWAY w/ 4:1 SIDE SLOPES & RIPRAP OUTFALL CREST ELEVATION = 417' VDOT STD. CL. I EC-2 f RIPRAP OUTFALL r. p ; PROPERTY LIMITS BIORETENTION BASIN'A' DESIGN REQUIREMENTS & AS-BU ILT CONDITIONS: Treatment Volume (Per VRRM Calculations) 3,893 cf Minimum Treatment Volume Required 3,893 cf Minimum Forebay Volume Required (15%of Tv) 584 cf As -Built Forebay Volume Provided 797 cf * Minimum Surface Area Required (Tv/Storage Depth) 1,806 sf As -Built Surface Area Provided 1,997 sf * Area based off T Mix at 25% porosity, 3" pea gravel at 2% porosity, 12" stone at 40% porosity & 12" of ponding at 100% porosity STORMWATER MANAGEMENT FACILITY GRADING As -Built Area of Elevation Forebay Cell Volume (ft) Contours (sf) (cf) 414 32 0 415 121 72 416 184 223 417 283 455 418 404 797 Elevation (ft) As -Built Area of Filter Cell Contours (sf) Volume (cf) 411.5 1,997 0 412 1,997 998 N 413 1,997 2,996 414 1,997 4,992 415 1,997 6,989 x 416 1,997 8,986 Q) 417 2,316 � s= o 418 2,734 0- Existing Elevation Detention Area Volume (ft) Contours (sf) (cf) 408 1,366 0 410 2,653 3,948 411 3,686 7,104 412 4,768 11,319 PRCP -7. )f j, wSL QiH-'—LID— 1 .�i PEDAL V.. L: 0I3TJ BEZ r.L- FE:a CIHA L. EE _'74E'sL.ZEEC ry;`TH El--2 MA N ,G,. `'.CLL E! `AA .; .::U..L r? iALL C01r 3Q CIF !JL a 2C CI G''C r,a fir x f }xVI_c.L R;ADr-v. ,,_+%d:•5t .0', C. a 4u,i-.- _r T'H-E i,d`.J1•�.. _r45vx ':" rk i-. ,ems- CQ„i(i!�Y'�C EU-�2L.�y��i,tu`-i,�`LL SH tl 'LE,_7 E: :. B_S d:i.. .{i 4�i ��',.1 t... ..'-H .,.,OFF , .., .A, OR' DEN, '�� . �_:F L'.�55% .-,F .';'4 i,.., !a ,; ..e...p x��1] h4l..S Perforated asr Figure - . , T�, � 3fofetenkm Bashi Besm SJ C;TTC A-9: TYP14C_ C,; HIC'A_L DETAIL HQMQgCrkgQ as fill r , •,`.,. 4a min trenc —4' below S ON4_ 1 a rna-Iericl TYPICAL HOMOGENEOUS EMBANKMENT f K FOUNDATION DRAIN ,,'VI E!PMGf-T CA ON TE1 tir11(�I:AI:_ ENID F PIPE dvyin Odin P" =�Tr�rr��tri f€li�s- HIMNEY DRAIN Iran it fill __Rock: or gravel '-EIiarikeI drain BLANKET DRAIN R000, or lgerlyAd ---Tr,pna1tiort filter 1O RAIN 4° P_ 4CNC;":IzJPERFORLATE'G r`5 r;2,z C1 F IP.— Figure 9-B. t. 4" P.V.C. Cleanout Detail O SCOTT R. COLLINSZ" ,C-) Lic. No. 035791,E o ��SSroNAL