Loading...
HomeMy WebLinkAboutWPO201900024 Inspection 2019-07-31 (2)COUNTY 01 ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 CharlottesvlIle, Virginia 22902-45% Phone 434 2%-5832 Fax 434 972-4126 July 30, 2019 Augusta Professional Park, LLC Attn: Mr. Michael McGinnis Little North Mountain Vine Yard 879 North Mountain Road Swoope, VA 24479 RE: Hillcrest Vineyard and Winery, LLC Tax Map & Parcel 06900-00-00-02000 WPO-2019-00024 NOTICE TO COMPLY Dear Mr. McGinnis: Under § 17-900 of the Albemarle County Code, you are hereby notified to make corrections on the above referenced property to address the installation of erosion control measures, soil stabilization, and any necessary drainage corrections as approved by the County. This Notice to Com lly shall remain in place until all rqquired corrections are im lemente ins ected and approved. Rewired Correction(s) under Notice To Comply: 1) The interception channel shown on the plan sheet to divert runoff around the building is not as shown. There is a berm along the top of the slope to channel runoff to the east and west. Please show this change on the as -built plans. 2) A lay down area has been installed along the top of the slope and behind the new building. This area needs to be removed along with the construction road to it and the disturbed area seeded with straw mulch applied. 3) There is a stone lined swale along the toe of the slope at the rear of the building, that discharges into a pipe that drains to the basin. The rip -rap will need to be reworked in this area so as not to block the flow of water into the pipe and the slope at this location may also be too steep. 4) install stone armored swales (B) and (C) to forebays as shown on plan sheet C-2.01. 5) Install forebays with 4' aquatic bench as shown on plan sheet C-2.01 and a pooling area in each forebay. 6) Check stormwater basin size. The bottom should be 110' from forebay to forebay and 10' wide, with 4:1 side slopes. 7) Principal spillway barrel pipe is not watertight at the riser structure. Ask your Engineer how to make this a watertight connection. 8) Trash rack with anti -vortex plate as shown on -thee plan sheet will need to replace the existing cover on the riser structure. 9) Address the area at the discharge pipe we talked about by installing matting material, seeding and straw mulch. 10) As stated on the approved plan sheet " Plant 1 gal. creeping juniper at 1' o.c. for soil stabilization on all slopes steeper than 3:1" 11) Some areas of the project may require silt fence to be installed until permanent vegetation can be established. The County Erosion Control Inspector, will let you know of these areas. The Department will work with your Engineer and contractor to bring the site into compliance. If the corrections listed have not made by Friday, August 16, 2019, Albemarle County may pursue remedies per 17-900 of the Albemarle County Code. If you have any questions or concerns with steps necessary to correct this violation, please contact either Kenny Thacker or John Yerby at 296-5832, Ext #3390. Sincerely, envyter Erosion Control Officer