Loading...
HomeMy WebLinkAboutWPO200800054 Correspondence Erosion Control Plan 2008-06-28 of A 0111:HkiES Q= GV �e .° te• L . apV County of Albemarle 0' t\* Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper,Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 28 june 12 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond maybe released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: Faulkner Falls TMP: 04200-00-00-07000/70E/70F SITE PLAN NUMBER: 2008-00054 FACILITY DESCRIPTION Type(s) and number of BMPs 1 —wet pond (incl.non-structural) 1 —biofilter Description of Outfall Bio#1 -24"pipe from 48" riser,underdrains (Ex: 24"RCP from 36" CMP riser) Bio#2- Converted to wet pond due to base flow from spring,Bio filter still under water. Water Quality 171 Yes • n No Design Storm ® l0yr . ❑ 2yr Any Additional Information Approved in the fled by Glenn (incl.stream buffer mitigation) Acopy of the site plan and details of the BMP(s) are attached) J' - P'l lr�r�i✓tY 'e.- eec' f :a. i I:\DEPT\Community Development\Fomu\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc