HomeMy WebLinkAboutWPO200800054 Correspondence Erosion Control Plan 2008-06-28 of A
0111:HkiES Q=
GV �e .° te•
L . apV County of Albemarle
0' t\* Department of Community Development
Memorandum
To: Ana Kilmer,Management Analyst
Greg Harper,Water Resources Manager
From: Mark Hopkins
Division: Inspections—E&S Control
Date: 28 june 12
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond maybe released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: Faulkner Falls
TMP: 04200-00-00-07000/70E/70F
SITE PLAN NUMBER: 2008-00054
FACILITY DESCRIPTION
Type(s) and number of BMPs 1 —wet pond
(incl.non-structural) 1 —biofilter
Description of Outfall Bio#1 -24"pipe from 48" riser,underdrains
(Ex: 24"RCP from 36" CMP riser) Bio#2- Converted to wet pond due to base flow
from spring,Bio filter still under water.
Water Quality 171 Yes • n No
Design Storm ® l0yr . ❑ 2yr
Any Additional Information Approved in the fled by Glenn
(incl.stream buffer mitigation)
Acopy of the site plan and details of the BMP(s) are attached)
J' - P'l lr�r�i✓tY 'e.- eec' f :a. i
I:\DEPT\Community Development\Fomu\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doc