Loading...
HomeMy WebLinkAboutWPO201800017 Correspondence 2019-08-07David James From: Jonathan Showalter <Jonathan.Showalter@timmons.com> Sent: Wednesday, August 07, 2019 2:37 PM To: David James Subject: RE: Lighthouse WPO - comment David, Yes. I double-checked and 19.30 cfs is a conservative estimate of the flow to the channel combining the TR-55 flows with rationale for the offsite drainage area. If the rational flow was taken from the pipe calcs and (9.03 cfs from pipe 114) and 5.27 cfs from offsite using a i of 6.54 in/hr the total flow would be closer to 14.3 cfs for the 10 year so 19.3cfs is a good conservative calculation. Thank you, Jonathan From: David James <djames2@albemarle.org> Sent: Wednesday, August 07, 2019 2:06 PM To: Jonathan Showalter <Jonathan.Showalter@timmons.com> Subject: Lighthouse WPO - comment Jonathan, Please confirm that all drainage areas, including the 0.96ac offsite area (Sheet C6) are being accounted for in the channel designs - channel A -A & C-C. Thanks, David James