HomeMy WebLinkAboutSDP201900033 Review Comments Final Site Plan and Comps. 2019-08-09 (2)County of Albemarle
Department of Community Development
Memorandum
To: Patricia Saternye
From: Emily Cox
Date: 12 June 2019
Rev. 1 Date: 07 Aug 2019
Subject: Northside Material Recovery Facility — Final Site Plan (SDP201900033)
The final site plan for Northside Material Recovery Facility has been reviewed by Engineering. The
following comments will need to be addressed before approval:
1. VSMP Plan (WPO201500001) must be amended and approved before final site plan can be
approved. Rev. 1: Comment not addressed.
2. Plans should be signed, sealed and dated by professional. [18-32.6.1 ] Rev. 1: Comment
acknowledged.
3. Specify the type of stone for the stone access aisle cross-section. [Sheet C6] Rev. 1: Comment
Addressed.
4. Provide a cross-section of the proposed berm. Rev. 1: Comment Addressed.
5. Rev. 1: Please provide a copy of the exhibit that shows adequate sight distance at the
entrance.