Loading...
HomeMy WebLinkAboutWPO201900021 Review Comments WPO VSMP 2019-08-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit Plan review Project: UVA Research Park Loop Road — VSMP Plan Plan preparer: Jonathan Showalter, Timmons Group f onathan.showalter(a timmons.com] 608 Preston Ave., Suite 200 / Charlottesville, VA 22903 Owner or rep.: University of Virginia Foundation / P.O. Box 400218 Charlottesville, VA 22904 [tmarshallAuvafoundation.com] Plan received date: 25 Mar 2019 (Rev. 1) 21 Jun 2019 Date of comments: 8 May 2019 (Rev. 1) 9 Aug 2019 Reviewer: John Anderson WP02019-00021 County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied for reasons outlined, below. The application may be resubmitted for approval if all comment items are satisfactorily addressed. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. a. Sec. 1 (Registration Statement): Revise to include: i. An e-mail address for Todd Marshall, UVA Foundation (Rev. 1) Addressed. ii. Registration Statement signature (Rev. 1) Acknowledged. Applicant response: `A signature will be provided once a contractor has been selected.' Acceptable to Engineering b. Sec. 9 (Signed Certification): Please sign (Rev. 1) Acknowledged. Applicant response: `A signature will be provided once a contractor has been selected.' Acceptable to Engineering. c. Sec. 11 (General Permit Copy) Please include 2014 VAR10 (Rev. 1) Partially addressed. As follow-up: please replace 23-pg. 2014 General VPDES Permit with 2019 General VPDES Permit (link: httns://www. dea.virizinia. eov/Portals/0/DEO/Water/StorinwaterMana2ement/CGP%2OADA/CGP2019.ndf?v er=2019-05-06-131630-407) d. List WP02019-00021 on cover of SWPPP (Rev. 1) Addressed. e. New: Sec. 7, Enhanced inspection frequency changed with 2019 General VPDES Permit. Please ref. II G.2.a (pg. 13 /.PDF —ref link, above). Revise Sec. 7, SWPPP. The PPP content requirements can be found in County Code section 17-404. 1. If Sec. 6 PPP Exhibit is revised, please provide an updated Exhibit (Rev. 1) Partially addressed. As follow-up: Include rectangle labeled concrete washout for dedicated concrete truck washout (differs from mortar mixing station). 2. New: Indicate rain gauge location (`x' or rectangle or similar). Label rain gauge. 3. New: Recommend revise construction entrance label /legend to ref. paved construction entrance (PCE). Engineering Review Comments Page 2 of 8 C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons listed, below. The stormwater management plan content requirements can be found in County Code section 17-403. Revise plan title to include ref. to VSMP /WP020900021. (Rev. 1) Addressed. VSMP Plan and Road Plan Design Calculations & Narrative, 3/25/19: a. SWM Quantity Narrative —Include information highlighting (via prior -approved graphic, narrative, zoning, site, or WPO data) how eastern side of project drains to a large wet pond that was designed to handle stormwater quantity for the full build out of the research park. Recommend information identical to Timmons Group Lewis and Clark Drive Road Extension VSMP Plan and Road Plan Design Calculations & Narrative booklet, d. 3/25/19, pg. 18-19. (Rev. 1) Addressed. b. LD-229: Provide computational data requested at D. ESC Plan, items 7 and 8. (Rev. 1) Addressed. c. Revise SWM routings — see items 14, 15, below. (Rev. 1) Addressed. Also, items 14, 15, below. 3. Ensure dry pond design details on VSMP /WPO match design details on SUB201900049, or preferably limit design detail provided for dry pond on the Road Plan to conceptual outline, saving details for the VSMP /WPO Plan. (Rev. 1) Partially addressed. As follow-up: See item 18.d., below. 4. Show proposed SWM Facility /Access /Drainage Easements. (Rev. 1) Partially addressed. As follow-up: Revise `10' wide grass access road' label to `SWM Facility Access.' Outline SWM Facility easement/s. (Please show /label SWM Facility Access on SUB201900106 —UVA Research Park Loop Road Final Plat.) S. Provide curb break /mountable curb to provide SWM Facility Access (ACDSM, pg. 12). Provide access label or note on plan and linework with proposed grading that meets ACDSM standard, text image, below for dry pond Access: (image removed w/ Rev. 1 comments) (Rev. 1) Addressed. 6. Provide typ. detail, transition from CG-6 to mountable (rolltop) curb at point of SWM facility access. (Rev. 1) Not addressed. Applicant response: `Detail has been added to sheet C1.1.' Sheet C1.1 is not included the plan, and C1.1 is not listed in C0.0 sheet list table. Please restore typ. detail from C1.1 to plans. 7. Recommend ref. SUB201900049, UVA Research Park Loop Road (Road Plan), on C0.0. (Rev. 1) Addressed. 8. Sheet C1.1 is not strictly necessary. Recommend remove this sheet from the VSMP /WPO Plan. (Rev. 1) Addressed. Also, see item 6., above. (Typ. detail). 9. C1.2: Provide VDOT IS-1 detail (inlet shaping). (Rev. 1) Not Addressed. Ref items 6./8.; restore detail to plans. 10. C4.2, C4.3 are not strictly necessary. Recommend remove these sheets from the VSMP /WPO Plan. (Rev. 1) Addressed. 11. C5.3 is not strictly necessary. Recommend remove this sheet from the VSMP /WPO Plan. (Rev. 1) Addressed. 12. C6.1 /Stormwater Quality: VSMP Plan and Road Plan Design Calculations and Narrative (booklet) 3/25/19 submitted with SUB201900049 does not appear to include runoff reduction spreadsheet (VaRRM .xls); apparently no booklet submitted with WP0201900021. Provide VaRRM .xls. (Only booklet ref. to Water Quality in booklet, image below —pg. 3) (Rev. 1) Partially addressed. The only VaRRM.Xls data included with Calc. booklet is Drainage Area `A' , which appears three times: twice with DA total acreage of 2.10 Ac., once with DA total acreage of 2.80 Ac. Please review /revise calculation booklet to include VaRRM.xls site, water quality compliance, runoff volume and CN, and summary tab information, and as many discrete drainage area tabs as there are DAs routing to a BMP practice. It may be that DA `A' appears multiple times to reflect routing to practices 16 and 17, but all three DA `A' tab data appear to relate to the filtering device. Engineering Review Comments Page 3 of 8 Water Ouality The current site is undeveloped. 4.66 acres of disturbed area was analyzed for water quality. There will be 1.08 lbs/year to be treated via manufactured treatment device. The remaining 0.22 lbs/yr of required nutrient credits area to be purchased from a DEQ- Approved Nutrient Credit Bank in Accordance with CA code 62. 1-". 15:35. 13. Note: Applicant must coordinate nutrient credit purchase with Ana Kilmer, Albemarle County, once plan review comments are addressed prior to purchasing credits. Purchase of nutrient credits is required for VSMP plan approval. (Rev. 1) Partially addressed. Applicant response: `Design has been revised so that offsite credit purchase is no longer necessary.' This is not immediately apparent. See item 12, above. Include VaRRM.xIs data with calculation booklet, or VaRRM.xIs data clearly presented on plans so that site and summary data depict phosphorus load reduction required, and practices which reduce phosphorus to the point that offsite credit purchase is not required. Please do not send VaRRM.xIs to reviewer to address this comment, since email or e- attachments are not approved with a VSMP /WPO plan. Engineering, however, appreciates digital VaRRM.xIs submittals. Please confirm if .xIs sent via email, and if so, date sent. 14. C6.1: A fair portion of the 3.10 Ac. off -site post -development area cannot reach the dry pond without inlet west of N-S leg of loop road similar to inlet south of E-W section of the loop road. See images, b (blue outlined area) (images removed w/ Rev. 1 comments). Please provide inlet /pipe connection to route this off -site runoff to the dry pond, to qualify for quantity compliance as well as to collect flow at an otherwise low -point that lacks drainage outfall, unless runoff is to sheet over the curb onto the paved surface. (Rev. 1) Withdrawn. Review of development plans for areas west will likely accommodate drainage needs at this location. Applicant response (acceptable in interim): `The area indicated sheet flows over the curb or across the edge of pavement and flows to the gutter and inlet.' (inlet 114) C5.1: offsite routed low point without collection blue circle /highlight (contour 576't): 15. Ensure plan CN /Acreage match routing report values. Sub -catchment 3S, 9S report values do not match plan data. Revise routings, consistent with plan sheet C6.1. /ages (images removed w/ Rev. 1 comments): (Rev. 1) Addressed. 16. L1.0: VDOT Std Class Al riprap dimensions need not appear on this sheet. (Rev. 1) Addressed. Sheet L1.0 removed from WPO plan set. 17. L1.0: Recommend shift leader line of label reading `Tie to nearest inlet (Typ.)' to more clearly indicate UD-4 (Typ) is to tie to nearest inlet. (Rev. 1) Addressed. Lt.0 removed from WPO plan set. 18. Choose BMP practice from approved list, or an approved proprietary measure i. Use plan labels that identify /match a best management practice listed at https://www.swbmp.vwrrc.vt.edu/ (t&a image, bee)W) (images removed w/ Rev. 1 comments): (Rev. 1) Partially addressed. Applicant response: `Labels added to sheet C5.0 calling out Stormtech Isolator Row (Practice 17, filtering device) and Baysaver Barracuda (Practice 16, hydrodynamic device).' As follow-up: Please provide design plan /profile details for Str. 102 (flow-splitter) —see example; photos, below. Include elevations. 24' PREFABRICATED ENO CAP. PARTS SC74DEPE24B TYP OF ALL SC-740 24' CONNECTIONS AND ISOLATOR ROWS PROPOSED 21E NYLOPLAST (24' SUMP MINHDESIGN BY ENGINEERI PROPOSED BARRACODA $6 WE SNEET4 - Engineering Review Comments Page 4of8 PROPOSED FLOW SPLITTER STRUCTURE IDESICN BY ENGINEERI PROVIDED BY aTryERS) N N .d� F^ Qtt aw� LL— W osa a ° O awg �w odsg cnwaai- (x,y�.Jy i x r0toOr��^ry o rn o S e b. If design proposes an Extended Detention (ED) Pond, use link to visit the Clearinghouse and carefully consider design criteria listed at VA DEQ Stormwater Design Specification No. 15, Section 6, including: i. 6.1 — Overall Sizing ii. 6.2 — Treatment Volume Drawdown and Detention Design iii. 6.3 Requied Geotechnical Testing iv. 6.4 — Forebay Design v. 6.5 — Conveyance and Overflow vi. 6.6 — Internal Design Features vii. 6.7 Landscaping and Planting Plan viii. 6.8 Maintenance Reduction Features ix. 6.9 ED Pond Material Specifications c. Provide detailed plan and profile for a listed practice that meets design criteria. d. Provide Landscaping and Planting Plan Example of partially approved Ex. Det. Pond profile /recent VSMP /1' nlan submittal (pheto, below): (photo removed w/ Rev. 1 comments) (Rev. 1) Partially addressed. Applicant Engineering Review Comments Page 5 of 8 response: `Extended detention is not provided as part of this project. A dry pond will be used to control stormwater quantity, but it will not be considered a BMP for stormwater quality.' Asefollow-up: A SWM quantity measure requires design plan /profile detail and calculations comparable to a SWM quality facility. Provide plan /profile, design and calculations that demonstrate design intent, consistent with HydroCAD routings. Profile information, in particular, is essential for construction, inspection, bond estimates, and As -built comparison with design. C6.0 /C7.0 plan and riser details are insufficient. Label pond floor dimensions. 19. Additional SWM Plan (VSMP /WPO) review comments possible, once plan re -submitted. (Rev. 1) Applicant response: Acknowledged. 20. New: Provide additional legible terrain contour labels west of Loop Road. 21. New: Compare C3.3 pipe layout, which appears to route runoff north, then east, off -site, bypassing dry detention pond, with C6.1 post -developed routed area/s. If area shown in top image below bypasses dry detention pond, please revise relevant plan sheets, revise routings, design, etc. IP C,FJJI WATER 1 CNE0.- RNER$T SITE 1 -. TC CT�KF�IGE E P8 IPIZI P 1 TtMPONARv ,Y XCpE � � _ It P IPell - ��__'. STRUCrt1RE a0a �� EEHPalTFNP. ROPE .. � STRIICttME �O1 q �-15 XPpE PIPE TO BE REu0�E40NCE TXE IIST AHCEBVEieN XAs EESry EBTA&18fE01OTXE ORy PETEIRgN Po,Tp.FWiOwF1GTXE REMovAt OF TXE 15 HOPE, STRUON,REAW AlW PIPE T0, � TO eE INSrIUEEOACC0ltaxcLY ETUIN� f weTUNo �r O PL Tli O I IP WITH+ �.. UNIVER!!TF'OF NRfiEM41 FOiWOA --'- '` ` -- AE -ND - -n9 TIlG�. .. ucLa'�" �` v�•S - _-- __ - ___ -� �® •- - 81 GRTCH GRnOE �. _ _ REMI CIIR§ 0.NU GETTER �_ _ _ •-•�� \ A2 NW RERiTMH'I ITYP-1 t—'FTE'���II '�� - BTKIRNG INFRONT OF ENTRANCE _ CONTRACTOR TO APPLY POR ANC OBTAIN htL NECESSARY REMOVE ASPHALT FOR J PERMn'5 FROM Y00T BEFORE BEGIHNIrvG COrvSTRUGT(pw Iry 'I — —a - _ UTILITY TRENCHiN� HER IGl1TOF WAY. CONTRACTOR TO COOROINATE MOT WITH MIO FIRE ATTO ANO FRGM FIRE REMOVE CURB VUOT CS STATION SECTION TO BE EFAINTAINEn AT ALP TIMES EAWCUT CURE AT -°'- NEARESTJOEYT (TYPJ _ - - law tax avvacclA%�MMI Palt,'tir '�• �}• \ _ '' - •;� C6.1 ROUTED AREA: AREA = 3.10 ACRES i CN = 61 TC = 12.6 MIN. ♦ y ..Z...t,.ui*-li-ll'���--' -- , - -r Engineering Review Comments Page 6of8 DRY POND AREA: - AREA = 1.70 ACRES CN = 76 TC - 6 MIN. Y, -POST-DEVELOPED I ' UNROUTED AREA-.. i AREA = 0.40 ACRE,j,'� CN = 61 i•.TC = 6 MIN.- . - ==nIt m POST -DEVELOPED D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved for reasons listed, below. The erosion control plan content requirements can be found in County Code section 17-402. 1. C3.1: Provide Paved Wash Rack detail (ACDSM, pg. 8) (Rev. 1) Addressed. C3.2: 2. Show break in SSF at stone weir outfall, ST2. (Rev. 1) Addressed. 3. Label ST1, ST2 stone weir dimensions (L X W) in plan view. (Rev. 1) Addressed. 4. C3.3: Provide Str. # consistent with C3.0 Phase II Sequence. (Rev. 1) Partially addressed. As follow-up: Please see /address New SWM Plan comment 21, above. 5. Cannot locate temporary 15" HDPE pipe. Edit /revise C3.0 Phase I sequence, as needed. (Rev. 1) Addressed. 6. C3.3: Check C3.0 Phase H sequence Note 2.1 against C5.0. Revise if pipe /str. re£ should be Str. 300, 301. (Rev. 1) Addressed. Applicant response: `Note 2.1 on C3.0 has been revised to clarify that storm system associated with dry pond must be operational prior to removal of temporary HDPE pipe, which allows offsite runoff to bypass project site during construction' 2.1. ONCE THE CONTRIBUTING DRAINAGE AREA TO SEDIMENT TRAP #1 HAS BEEN PERMANENTLY STABILIZED AND APPROVED BY THE ESC INSPECTOR, REMOVE SEDIMENT TRAP # 1. CONTRACTOR TO ENSURE SILT FENCE ALONG THE TOE OF SLOPE IS INSTALLED AND IN GOOD CONDITION AT ALL TIMES TO ENSURE EXISTING WETLANDS ARE PROTECTED. ONCE THE STORM SYSTEM ASSOCIATED WITH DRY DETENTION BASIN IS OPERATIONAL, REMOVE THE TEMPORARY 15- HDPE PIPE AND END SECTION. INSTALL STRUCTURE 402 AND PIPE 401 ACCORDINGLY. 7. LD-229 submitted with SUB201900049 does not appear to include design computations for pipe 301. Evaluate design flow and discharge velocity against pipe capacity and riprap outfall dimensions. (Rev. 1) Not addressed. Applicant response: `Pipe 301 is routed as part of the Hydrocad analysis for the dry pond.' Please indicate, using Hydrocad analysis or other means, that pipe 301 capacity and riprap at pipe 301 outfall are sufficient to meet Q2-vel.l10-capacity (dry pond) routed flows. Also, see dry pond riser structure detail (image, below). Routings include relevant parameters, but do not explicitly address this comment. Engineering Review Comments Page 7 of 8 100 YR WSE 10 YR WSE 1 YR WSI 1� S 01 �d yOy ff1�� •G O�p�p � �i0 W NQa> c4i U,PK aa> z EXISTING GRADE 575 575 570 570 = 571.25 I = 570.60 301 565 _ 51.96'. _ 565 24" RCP = 569.11 Q 0.95% 560 560 PROPOSED GRADE 9+50 10+00 11+00 11+50 9 STR 302 - STR 300 HORIZ SCALE: 1'=50' VERT SCALE: 1 "=5 TRASH RACK RECTANGULAR (SEE SHEET C1.2) NOTCH WITH ORIFICE TRASH RACK 100 YR WSE DI-1 TOP 571,25 ELEV. 570.55 _ _ _ 10 YR _WSE 570.60 24" I I I I 1 s I I ELEV 569.30 I I � 1 YR WSE I I 569.11 ELEV. 568.00 I 4.75" 12" THICK DI-1 WALL BEYOND,TYP. DRY POND DI-1 RISER STRUCTURE 302 DETAIL NO SCALE 8. Evaluate discharge velocity against riprap outfall, Str. 200 NDOT ES (capacity appears sufficient). (Rev. 1) Addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been addressed. For re -submittal, please provide .PDF preview prior to print submittal. Engineering Review Comments Page 8 of 8 Engineering plan review staff is available from 2-4 PM on Thursdays if you wish to meet to discuss this review. Process After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application (SWPPP Registration Statement). DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. Easements must be recorded prior to VSMP approval. Proof of purchase of nutrient credits is required for paln approval, and to receive a Grading Permit. After DEQ coverage is issued, the County can hold a pre -construction conference. Applicants will need to complete the request using a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.orWdeptforms.asp?department=cdengmTo Ifyou have questions /concerns, please contact me atjanderson2aalbemarle.org or at 434.296-5832-x3069. Thank you J. Anderson, Engineering Div. WP0201900021 UVA Research Park Loop Road rev080919