HomeMy WebLinkAboutSDP201900049 Correspondence 2019-08-09**
s
TIMMONS GROUP
`:oust VISIOU ACHI VFD THROUGH OURS.
August 9, 2019
Cameron Langille
Senior Planner
County of Albemarle
Dept. of Community Development
401 McIntire Road, North Wing
Charlottesville, VA 22902-4596
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
RE: SDP201900001 Berkmar Drive Apartments — Initial Site Plan
Mr. Langille:
P 804.200.6500
F 804.560.1016
www.timmons.com
On behalf of our client, Breeden Investment Properties, LLC, we are pleased to resubmit for Albemarle
County's review the site plan for Berkmar Drive Apartments, revised per comments provided by county Staff.
Please find attached to this letter 11 full size sets (24"x36") of the revised site plans.
Below is the latest edition of the County's review comments, followed by the response in bold italics:
Albemarle County Planning Services
Cameron Langille
(200) 14.16.11 The site plan does not demonstrate compliance with the minimum recreation standards
required for developments proposing more than 30 units at a density of more than 4 du/acre. A
minimum of two hundred square feet per unit of recreational area shall be provided in common area or
open space on the site, this requirement not to exceed five (5) percent of the gross site area. The
following facilities must be provided in the recreation areas:
a. [4.16.2.1] One (1) tot lot shall he provided for the first thirty (30) units and for each additional
fifty (50) units. A total of six (6) tot lots must be provided within proposed recreation areas.
Each tot lot must measure at least 2,000 sq. ft. and shall be fenced. A total of 12,000 square
feet of tot lot recreation area must be provided within the project. Each tot lost must contain
the following equipment:
i. One (1) swing (four (4) seats);
ii. One (1) slide;
iii. Two (2) climbers;
iv. One (1) buckabout or whirl;
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
*see#•
TIMMONS GROUP
)t?t.i�:R !!E'�it.+i•B '."=#�e:;rru i�:4Zi�i.iC';� P.aiCi�:9.
v. Two (2) benches.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
1'804'200.6500
F 804.560,1016
wwwAimmons.00m
Rev. 1: Comment Martially addressed. The recreation substitntion request (see
attached exhibit) states that the proposed equipment will be shown in detail on the
final site plan submittal
Response: The detailed design of the recreation areas and amenities is currently
underway, and detailed plans reflecting the equipment shown in the previous exhibit
will be provided prior to final site plan approval.
cl. the recreation areas must: be shown on all applicable drawings and comply with the equipment
and sire standards specified in Section 4.16.1 of the Zoning Ordinance.
Rev. 1: Cornment partially addressee]. Additional details cif' the playground area will be
provided with the final site plan.
I'. 14.16.31 The following notes must he added to the site plan:
vi. "R.ecreational equipment and facilities shall he maintained in a safe condition and
replaced as necessary. Maintenanceshall lie the responsibility of the property owner if
rental units or a homeowners' association if sale unit:s." Rev. 1: Corntnent not
addressed. Please acid these notes to the final site plan.
vii. "Recreational facilities shall be completed when fifty (50) percent of the units have
received certificates of occupancy." Rev. 1: Comment not. addressed. Please add
these notes to the final site plan.
Response: The required notes will he added with the detailed amenity plan on a
subsequent submission.
3. [32.5.2 (a)]The setbacks shown on the drawing are incorrect. There is no 20' setback in the R-,15 zoning
district (this includes front, side and rear). The maximum front setback is "25 :feet from the right-of-
way or the c,xterior edge of the sidewalk if the sidewalk is outside of the ri ht-of -way." ' I'he front: setback
should be applied on the eastern development boundary, which means Building 7 currently does not
meet the rnaxirnurn front setback. Building 7 will need to lie moved closer to property lines to comply
with the: setback. Rev. 1: Comment no longer applicable. 'boning staff have reviewed the plan and
determined the actual front setback. See canmrerrt 1142 tirr additional details.
Response: The front .setback has been revived in accordance with comment ##42.
a. At least one building; must comply with the minimum and tnaxirnum front setback. Staff
suggests reversing the location of building 7 and the row of parking east of Building, 7. 'Phis will
move the building closer to the property line to comply with the rriaxitnurn 25' front. setback.
Rev. 1: Comment no longer applicable. Zoning, staff have reviewed the plan and determined
the actual front .setback. See coturnent.1/42 for additional details.
Response: The front setback has been revived in accordance with comment 942.
CIVIL FNGINFFRINC, I ENVIRONMENTAL I SURVFYINt- I GIS I LANDSCAPE ARC.H11 ECTURE I C)NSTRUC:TION SERVICES
� 1001 Boulders Parkway P 804.200.6500
1v I' !' iMONS GROUP Suite 300 F 804.560.1016
YOUq VTSIOt4 ACHIEVED THROUGH OURS, Richmond, VA 23225 www.timmons.com
Comments to Be Addressed eriior to Final Site Plao Approyall!
3. [32.5.2 (a)] Please state the full Tax Map Parcel (TMP) numbers for all parcels within the development
in Note 5 on Sheet C0.0.
a_ PIease be aware that boundary line adjustment applications have been submitted to the County for
review and approval related to this project. Prior to final site plan approval, the TMP numbers may
need to be revised so that the plans accurately identify all properties that are within the project
boundary. Rev. 1: Comment stands and must be addressed prior to final site plan approval. Per
applicant response, the TMP numbers will be revised accordingly once the boundary line
adjustment plat is approved and recorded
Response: The Boundary Line Adjustment has been approved, and the revised TMP number (32-
54) has been added under note #5
4_ [32.5.2 (a)] Prior to final site plan approval, a boundary line adjustment application must be
submitted, reviewed, approved, and recorded that combines TMPs 32-55, 32-54, and the RA Rural
Area zoned portion of TMP 32-52 into a single parcel of record that measures 17.4 acres. Rev. 1:
Comment not fully addressed. The BLA plat, SUB201800226, is still under review with the County.
This comment will be addressed once the plat is approved and recorded and the deed book and
instrument number for the plat is referenced on the final site plan. All boundary lines should be
updated as necessary prior to final site plan approval
Response: The BLA plat SUB20.180026 has been approved and recorded, creating a single parcel
as TMP 32-54.
6. (32.5.2 (a)] Please add a note to Sheet C0.0 that states the instrument numbers (deed book and
pages) for all recorded plats and deeds associated each parcel within the development. Rev. 1:
Comment not fully addressed. Per applicant response, the listed numbers will be revised on the final
site plans as necessary once the BLA plat is approved and recorded. Please be aware that the
easement plat referenced in comment #39 below should also be referenced on the final site plan once
it is recorded.
Response: The BLA plat has been approved and recording. The deed book and pages for all plats
associated with the project will be listed once additional easement plats are submitted, approved,
and recorded.
7. 132.5.2 (a)] Add the primary zoning district to the property labels for all adjacent parcels shown on
theplans.
Response: The primary zoning district has been added at the bottom of all adjacent property labels
[32.5.2 (a)] See Engineering Division comments regarding the cemetery located at the southwest
corner of "Parcel C." Parcel C appears to be the property currently known as TMP 32-53. See the
recorded plat from Deed Book 5107, pages 617-620 for a survey of the cemetery location. Provide
information that the necessary precautions required by law will be taken to avoid disturbances and
preserve human remains. Rev. 1: Comment partially addressed_ Cemetery location has been revised
and shown on initial site plan and appears to be consistent with the cemetery location identified on
the survey plat recorded in DB 5107 pages 617-620. Please be aware that the Code of Virginia,
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING j GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
7- 1001 Bouklen, Parkway 1'804'200.6500
1 I M GROUP Suite 300 1- 804.560.1016
a �E:, v: .r.s.� :.? ;:_•., .::A r=j� ©u .i auas. Richmond, VA 23225 www.timmons.com
Section § 57-27.1 requires owners of private property on which graves or cemeteries are located to
provide an access easement granting ingress and egress to certain parties wishing to visit the
cemetery. Prior to final site plan approval, air access easement will need to be reviewed, approved,
and recorded grant ing ingress and egress to die cemetery, in accordance with provisions of the Code
of Virginia. Please visit dic Code of Virginia using the hollowing link for additional infonnation:
LINK.
Response: An access easement to the cemetery will be .shown on the final site plan pending
coordination with property owners.
9. [32.5.2 (a)j Please state the application numbers of all approved Special Use Permit and Zoning
Map Anlendments (ZMA) that apply to the development in Note 7 on Sheet C:OR Per applicant
response, all applicable ZMA and SP application numbers will be referenced on the final site plan
prior to approval.
a. TMPs 03200-00-00-05500, 03200-00-00-05400, and 03200-00-00-05300 are subject to the
proffers associated with Z.MA199200014. Per applicant response, all applicable ZMA and SP
application numbers will be referenced on the final site plait prior to approval.
b. 'PMI's 03200-00-00-05500, 03200, 00-00-05400, and 03200-00--00-05300 are subject to the
conditions of Special Use Permits SP 199300013 air(] SP 199500025. Per applicant response, all
applicable ZMA and SP application numbers will be referenced on the final site plan prior to
approval.
c. Please add all pages of the approve(lAct.ior).Letter from SP199S00025 as nn exhibit on Sheet
C 1.0. Per applicant response, all applicable %N1A and SF' application numbers will be referenced
on the final site plan prior to approval.
Response: 1MA-92-14, 7MA-93-06, and.VP-9343 are shown on the PrgJfered Condition .S'heet
('LL
11. [:32.5.2 (a)l Please state all applicable Overlay %awing Districts that apply to parcels within the
dcveloptrient in Nate 7 on Sheet (-.'0.0.
b. There are areas of Managed and Preserved Steep Slopes Overlay District within the boundaries
of the development.. "These should be listed in Note 7, and shown on all applicable drawings
where visible. Rev. 1: C:oinment not fully addressed. Areas of Managed and Preserved Steep
Slopes are not shown on the site plan drawings. Tlrese features need to be shown and labeled
on each drawing prior to final site plan approval. A mote should be added to the plans stating the
source used to identify the locations of both Managed and Preserved Steep Slopes Overlay
District areas (i.e. Albemarle County GIS, field run topographic; survey, etc.)
Response: The locations of the Managed Steep .Vlopes arras have been hatched in light grey on all
plan .sheets. A reference to the source of these locations, Albemarle County GIS, has been included on
sheet CO.0 under note #7.
12. [32.5.2 (a)] Add a irate to Sheet ( 0.0 stating the minimum and maximurn building and garage setback
limes, and building; separation requirements as specified in Section 4.19 of the Zoning Ordinance.
Phis development is classified as non-iniill and is subject to the following, setbacks:
a. Front Miraiinuru (building): 5 feet from the right--of-way or the exterior edge of the sidewalk if
CIVIL ENGTNFFRING I FNVIRONMENTAL I F:LJRVCY[N(; I GIS I LANDSCAPF ARCHiT'F("TLJRF I C;nNST-PLICFION SERVICES
4
TIMMONiS GROUP
YOUR VIa10,4 ACHIEVED T!;ROUGH OURS.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
P 804.200.6500
F 804.560.1016
wwwAimmons.com
the sidewalk is outside of the right-of-way; Rev. 1: Comment not fully addressed. The exact
language used in the comment should be added to the table on Sheet CO.0 for the front
minimum building setback.
Response: The exact building setback language has been added to sheet C.0 under note 24.
b. Front Maximum (building): 25 feet from the right-of-way or the exterior edge of the sidewalk
if the sidewalk is outside of the right-of-way; Rev. 1: Comment not fully addressed. The exact
language used in the comment should be added to the table on Sheet CO.0 for the front
maximum building setback.
Response: The exact building setback language has been added to sheet C.0 under note 24.
c. Side Minimum: None; see Non-Infill Building Separation. Rev. 1: Comment not fully
addressed. The exact language used in the comment should be added to the table on Sheet CO.0
for the side minimum building setback
Response: The exact building setback language has been added to sheet C. 0 under note 24.
g. Front Minimum (off-street parking and loading spaces): Front loading garage: 18 feet from the
right -of- way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way.
Side loading garage: 5 feet from the right-of-way or the exterior edge of the sidewalk if the
sidewalk is outside of the right-of-way. Rev. 1: Comment not addressed. The setback note on
Sheet CO.0 makes on mention of garage setbacks
Response: The exact garage setback language has been added to sheet C.0 under note 24.
h. Building Separation — Minimum: 10 feet, unless the building shares a common wall; provided
that in the R-10 and R-15 districts if the abutting lot is zoned residential other than R-10 and R-
15, rural areas, or the Monticello Historic district, any building that exceeds 35 feet in height
shall be separated from any other building by 10 feet plus one foot for each foot the building
exceeds 35 feet in height. Rev. 1: Comment not fully addressed. The exact language used in the
comment should be added to the table on Sheet CO.0 for the side minimum building separation.
Response: The exact building separation language has been added to sheet CO under note
24.
14. [32.5.2 (a)] Please show the correct minimum and maximum building and parking setback lines on
SheetsC4.0 through C4.3
a. Setback lines should state whether each line is a front, side, or rear setback. Labels should also
state whether each setback is a minimum or maximum setback line. Rev. 1: Comment partially
addressed. Please revise the front setback line on all applicable drawings, per comment #42.
Please also revise the front maximum setback note on Sheet CO.O per comment #42.
Response: The front setback line has been revised in accordance with comment #42 on all
applicable drawings. Refer to the response under comment #42 for additional information.
15. [32.5.2 (a)] The setback lines shown on Sheets C4.0 through C4.2 do not correspond with the setbacks
that apply to the R-15 Zoning District. For example, there is a "20' setback" line shown around the
eastern, southern, and western project boundaries. However, there is no minimum or maximum
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE : CONSTRUCTION SERVICES
. 000
GROUP
+
1001 Boulders Parkway P 804.200.6500
T I Gp U P Suite 300 F 804.560.1016
Ric hrnond, VA 23225 www.timmons.com
setback of 20' Ibr inFll developments in the 1t-15 Zoning; District, per Section 4.19. Rev. 1:
(.;cnnrnent partially addressed. ]'lease revise the: front setback line on all applicable drawings, per
comment #42.
Response: The front setback line has been revised in accordance with comment 1142 on all
applicable drawings. Refer to the response under comment ##42 for additional information.
16. 132.5.2 (b)] Please provide a table indicating, the quantity of units proposal within cacti buildings.
']'he table should include colurrms indicating; how many units measuring; less than 500 sq. It., 1
bedroom, and 2 or more bedroollts are proposed within cacti Building,. Rev. 1: Corrmrctit not fully
addressed. Per applicant response letter, a table wills the unit count will be provided with the final
site plan.
a. The total unit count by hedroonrs should be specified so that staff can verify that adequate
parking; ~paces are provided in accordance with the multifamily dwelling units parking
requirements specified in Section 4.12.6 ol'the Zoning Ordinance. Rev. 1: Comment not fully
addressed. Per applicant response letter, a table with the unit count will be provided with lire
final site plan. Staff will verify that the parking provided complies with the Zoning Ordinance
requirements at that time.
Response: A final unit bedroom table has been requested from the architect and will he
provided on the site plan prior to approval
18. [ 32.5.2 (d) ] Please show the locations of all Managed and Preserved steep slopes across all applicable
drawings.
a. Add a legend to each drawing? where these teatimes are visible and label each feature. Rev. 1:
Comment not fully addressed. No Managed or.l'reserved Steep Slopes are drawer on the plans.
Per applicant response letter, ally Managed or Preserved Steep Slopes within the development
will he delineated on the final site plan prior to approval.
Response. The areas of Managed ,Steep .Vlopes are depicted with a light grey hatch on all plan
sheets and labelett No I're<served Meep ,Vlopes exist within the development.
20. [32.5.2 (h)] In accordance with Section 18--4.12.13 (e), please showthe dimensions for the dumpstcr
pad and associated improvements oti Sheet C4.2. Rev. I : Per applicant response, durnpst.er pad and
enclosure details will be provided as cut -sheets on the final site plan.
Response: ']'rash enclosure detail.- will he provided on a suhsequent .suhmission pending
coordination with the architect.
21. 14.12..19 and 32.7.9.7 (a)(3)] Please provide a profile view detail with dimensions and materials of
the trash compactor enclosure to verify compliance with ttic screening requirements contained in the
Zoning; Ordinance. Please note that fences or other constructed screening measures must be a
minitnurn of six feet (6') in height, as specified in '32.7.9.7 (e). Rev. I: Per applicant response,
compactor and enclosure details will he provided as cut sheets on the final site plats.
Response: Compactor and enclosure details will be provided on a suhsequent submission pending
coordination with the architect:
CIVILENGINEERINC I ENVIRONMENTAL I SURVEYING I GIS ] IANFISCAPF AF2l.HT'rEC:rURF I CONSTRUCTION SERVICES
TIMMONS GROUP
YOUP VISION ACHIEVEn T'HRCtJG!-i OURS.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
P 804.200.6500
F 804.560.1016
www.timmons.a xn
22. [32.5.2 (j)] Please label all existing sewer and drainage easements by type and include a
size/width measurement. State the deed book and page for the recorded instrument number in
each existing easement label.
Response: An existing VDOT permanent drainage easement is located adjacent to the ROW
by the site's entrance. The type, width, and deed book /page number of the easement are
labeled.
23. 132.5.2 (k)] Please label all proposed sewer and drainage easements by type and include a
size/width measurement. State the deed book and page for the recorded instrument number in
each existing easement label. Rev. 1: Per applicant response, the final site plan will show all
proposed easements associated with this project. See comments #23a and #23b below for
process & timing for submittal, review and approval of easement plat application (this is
separate from the final site plan application). See also information regarding revisions to final
site plan that are required prior to final site plan approval.
Response: There are currently no sewer or drainage easements proposed with this project
The applicant notes the easement plat requirements for any future easements
a. An easement plat application must be submitted, reviewed, approved and recorded
prior to final site plan approval for all proposed easements.
b. Once the easement plat is recorded, the final site plan must be revised to show the
recorded instrument number for the easement plat (deed book and page number). The
newly created easements will need to be labeled with the instrument number, easement
type, width dimensions, and whether it is public or private.
24. [32.5.2 (n)] ADA compliant striping must be provided across all parking lot drive aisles where
handicap accessible parking spaces are provided on opposite sides of the travelway. For
example, the handicap spaces in front of the clubhouse should be connected by striping.
Response: ADA compliant striping has been added to connect ADA spaces on opposite sides of the
drive aisle.
25. [32.5.2 (n) and 32.7.2.31 Per Engineering Division comments, a sidewalk and staircase
should be installed to provide access to buildings 8 and 9 from the four (4) parking spaces
south of the structures. Additionally, a sidewalk and staircase should be installed to provide
access from the four (4) parking spaces between buildings 4 and 5 to the recreation area to
the south. Rev. 1: Site layout has changed. Per applicant response, sidewalks and stairwells
will be added to the final site plan as recommended by the Engineering Division. Locations
of these improvements, if necessary, will be determined during review of the final site plan.
Response: Stairs have been added to provide a connection from the parking area to
Building 8. The grading has been revised and additional stairs have been added
throughout the site where neederL
26. 132.7.2.31 Add a sidewalk along the south/west side of the travelway between building 7 and
building 8. ADA compliant ramps and crosswalks should be installed at the north mouth of
the travelway to connect the sidewalks. Rev. 1: Comment not fully addressed. Crosswalk
striping must be added between the sidewalk at the south end of the parking area near Building
CIVIL ENGINEERING i ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
GROUP
t 13oOders Parkway P 804.200.6500
T I M V R P Suitc 700 F 804.560.1016
YOU, VIS10" E;CWIVED T€-a i;LjGZ1' ©V- sSs Richmond, VA 23225 www.timmons.aom
5. See E"tigincering conrtttents for additional details regarding installation of CG-12 ramps
where sidewalks terminate at drive aisles.
Response: A crosswalk has been added between the two CG-12 ramps near Building S.
29. [32.5.2 (r)] Provide a Legend on each drawing showing all symbols and abbreviations visible.
Response: Sheet-specifir legends are depicted on all plan sheets.
30. [32.5.2 (n)] Please state the height of all proposed fences arid retaining walls in the labels used oft
the drawings. Profile view details of all proposed .fences, retaining; walls, and constructed Screening
measures will be required with file final site plait. E.-tell will need to show the types of materials used
and dimensions. Rev. I: Per applicant response, details of all proposed fences, retaining walls,
railings, etc. will be provided on the final site plant
a. ties i'.ngrneering Division and Inspections Division continents flor additional details on retaining
wall requirements. Rev. 1: Per applicant response, details of all proposed fences, retaining
walls, railings, etc. will be provided on the final site plan.
Response: Details of all fences, retaining walls, railings, etc. will he provided on a subsequent
suhmivsion pending coordination with the architect and wall designer.
31. 14.7 (d)] All proposed open space areas that will be privately owned shall be sul jest to a legal
instrument ensuring the maintenance and preservation of the open space that is approved by the
agent and the count' attorney in conjttnction with the approval of the subdivision ]flat or site plan.
Rev. 1: Per applicant response, the instrument: for privalely owned open space will be submitted,
reviewed, and approved prior to final site plait approval.
a. Prior to final site plart approval, an casement or maintenance agreerrlent mustbe resubmitted,
reviewed, and approved by the County that demonstrates that private open space areas (including
the tree save areas that will be used to earn the density bonus, and recreational open space areas)
meet this requirement for maintenance and preservation. Rev. 1: Per response noted above, the
instrument ensuring rrtaintcnarlce of privately owned open space will be submitted during review
of the final site plant. ']'his can be accomplished through an subdivision easement application.
Response: The instrument for privately owned open spare will be submitted, reviewed, and
approved prior to final site plan approval
32. [32.5.2 (e)] Please provide more details about the existing landscape features as described in Section
18- 32.7.9.4(c).
a. The Alberrr_arle (_ourity Conservation Plan _(.;hecklisi arid Cbaptcr 3.38 of the Virginia erosion
and Sediment Control handbook. The Conservation Plan Checklist will need to be signed by the
owners and provided as an exhibit on major arnendrnent prior to approval. This is required to
verily that the proposed 10% density bonus for maintenance of'existing vegetation is possible.
Sec; Section 18.4.1 foradditional details. Rev. 1: Comment stands. The checklist will need to
be provided as an exhibit on the final site plan and signed by the owners.
Response: Density bonus is no longer heingpursued.
b. 132.7.9.4 (c)] in both tree save areas, please identify the locations Of all exislirtl; VCgUtatiara
types that will be preserved. Use callous: to identify the species of each vegetation type. Add a
CIVIL ENGINEERING t FNViRONMEVTAL I SURVFYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
8
# { W rA d� Q
1001 Boulders Parkway P 804.200.6500
T IMMONS GROUP Suite 300 F 804.560,1016
YOUR VISION ACHIEV .o THROUr.H OURS. Richmond, VA 23225 www.timmons.com
table to the Landscape Plans that identify the quantities, caliper, and height of all vegetation
within these areas that will be saved to earn the density bonus. Rev. 1: Comment not fully
addressed. The landscape plan identifies existing wooded areas to be preserved, but specific
information on types of vegetation, including species, quantity, caliper, height are not noted.
Response: Density bonus is no longer being pursued
The grading drawings and landscape plans should show the tree and vegetation protection
measures that will be installed to protect existing vegetation from disturbance. The limits of
disturbance should be labeled on both drawings and symbology should be added for the
fences or other protection measures that will be installed. Rev. 1: Comment not addressed.
The grading drawings do not identify any tree protection measures being installed around the
existing wooded areas that will be preserved. Please show this information on the final site
plan.
Response: Limits of disturbance and tree protection measures are shown on the Phase I
and II erosion control plans (sheets C3.1 & C3.2).
33. [32.7.9.61 The landscape plans do not include a calculation for the minimum 5% landscaping
required within the parking area. Based on the 1.66 acres of parking area on site, a minimum of
3,616 sq. ft. of canopy coverage is required within the parking area. Please add this calculation to
Sheets L 1.0-L2.0 and provide a table identifying the trees and shrubs proposed that will meet this
requirement. Rev. 1: Comment not fully addressed. On the Interior Parking Lot Requirements table
on Sheet L2.0, the table says that 10,774 sq. ft. of canopy coverage is being provided. However,
the 31 total trees proposed in the parking area add up to 9,539 sq. ft. based on the Plant Schedule
canopy coverage column. Please clarify.
Response: Table on LZ 0 has been revised to properly reflect the updated calculations based
upon landscape plan revisions
a. 132.7.9.6 (c)] Provide a table stating the species, quantity, size at time of installation (caliper
and height) of all proposed vegetation that will be used to meet the 5% interior landscaping
canopy requirement. All vegetation proposed to be installed should be from species listed on
the Albemarle CouM Recommended Plants List.
b. The table should state the canopy coverage per single item in each individual vegetation type,
and a column stating the total canopy coverage based on the overall quantity of each vegetation
type. Please consult the Plant CanORY Calculations table for this information.
34. [32.7.9.71 The "Parking Screening Requirements" table on Sheet L1.0 indicates that no parking
screening is being provided. However, the parking spaces on the north and south sides of the
development must be screened in accordance with the Ordinance because properties to the
north/south are zoned residential and rural areas. The landscape plans will need to be revised so that
screening is provided. Rev. 1: Comment not fully addressed. A small double row of staggered PIN
TAE trees are shown on the southwest corner of the site that appears to be an attempt to screen
parking in front of Building 9. However,
a. 132.7.9.7 (c)] Add a table to the landscape plans stating the species, quantity, size at
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
. *ago
•
t�
1.001 boulders Parkway 11 804.2.00.6500
T i1. 1� GROUP Suite 300 F 804.560.1.01.6
YOU,. VIS Orii vVKLI. Richmond, VA 23225 Www.temrnOns.ppm
time of installation (caliper and height) of all proposed vegetation that will he used to
meet the parking lot screening requirement. All vegetation proposed to be installed
should be from species listed on the Albemarle County Reccmmerrded Plants List.
i. f vergreen trees shall he a minimum four (d) feet in height when planted. Shrubs shall be a
rninirnurll eighteen (18) inches in height when planted. All trees to be planted shall meet
the specifications of the American Association ofNurserymen.
1►. The table: should state the canopy coverage per single iterrr in each individual vegetation
type, and a column stating the total canopy coverage based on the overall quantity of each
vegetation type. Please consult the Plant Canopy C'alculations table 11ir this information.
Rev. 1: Comment not fully addressed. Additional parking screening, is needed, see
comment below. Update the Plant: Schedule: on Sheet 1.2..0 once the additional
landscaping is added.
Response: Table. on LZ 0 has been revised to properly reflect the updated calculations
hayed upon landscape plan revisions to incorporate barking lot screening along the
entirety of the ,Southern and Eaviern property lines.
c. 132.7.9.7 (d)] On the south side, a planting strip measuring a mininrurn of20' in depth must be
provided between the parking areas and development. boundary. '17his should be shown and
labeled on Sheet 1.,1.0. Rev. 1: Comment not rally addressed. The 20' wide planting row needs
to extend for the full length of the southern preliect. boundary in order to screen it from view of
the residential and rural area zoned properties to the south. ],lease show these materials on the
final site plan, and update the Plant Schedule on Sheet 1_,2.0 as necessary —Both trees and
shrubs should be provided in the double; staggered raw, not just olT.sTt trees. An additional row
o1'double staggered trees and Shrubs is needed along the eastern properly boundary to screen
the parking in front of Building, 5. Please add this to the final site plan.
Response: The landscape plan has been revised to incorporate parking lot screening along
the entirety of the .Southern and Eastern property lines.
:35. 132.7.9.S] The "'free Canopy Calculations" table on Sheet L1.0 is incorrect, a minimum of 20%
overall canopy must be provided, not 10%. Please revise. Rev. 1: Comment partially addressed.
The overall canopy provided will change based on previous comments. Please update the
calculations on Sheet 1.2.0 so that it reflects the total canopy coverage of all existing materials that
will be retained, and all proposed landscaping. This includes parking screening, parking trees,
shrubs, etc.
Response: Calculations have heen updated on LZO to reflect the total canopy coverage of all
existing and proposed lanclsraping.
a. An overall canopy calculation table should be provided stating the total arnount of veget:at.ion
that will be installed and preserved to tned this requirement. This includes all new materials
being; installed in accordance with Sectimis 32.7.9.5, '32.7.9.6, and :32.7.9.7. Rev. 1: Comment
partially addressed. The overall canopy provided will change based on previous comments.
Please update the calculations on Sheet. 1.2.0 so that it reflects the total canopy coverage of all
existing rr►aterials that will be retained, and all proposed landscaping. ']'his includes parking
screening, parking trees, shrubs, etc.
CIVIL ENGINEERING I ENVIRONMENTAI I $L1RVEYING I GIS I LANDSCAPE AKC:HITECTURE I CONSTRUCTION SLRVICES
10
TIMMO IIS GROUP
YOUP VISION ACHIEVLD TBROUGF-1 OURS.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
P 804.200.6500
F 804.560.1016
wwwAimmons.aom
Response: Calculations have been updated on L2.0 to reflect the total canopy coverage of all
existing and proposed landscaping.
38. [32.7.8 and 4.171 The initial site plan does not include a lighting plan in accordance with the
requirements of Section 4.17 of the Zoning Ordinance. Please include a lighting plan on the next
submittal and address the following: Rev. 1: Comment not fully addressed. Per applicant response
letter, a full lighting plan complying with the Zoning ordinance requirements will be provided with
the final site plan submittal.
Response: Refer to L3.0 Lighting Plan that is in compliance with the requirements of Section 4.17
of the Zoning Ordinance. All notes have been added per county comments.
a. [4.17.4] Please provide a luminaire schedule stating the quantity of each outdoor luminaire
proposed, the model number, the fixture type, wattage emission, etc.
b. [4.17.4 (a)] Please provide documentation from the manufacturer that all proposed outdoor
luminaries exceeding 3,000 lumens are full -cutoff fixtures.
c. Please state the pole height of all outdoor luminaires.
d. [4.17.4 (b)] Please show foot-candle measurements within the development and along all
existing and proposed street right of ways and property boundaries. The spillover of lighting
from luminaires onto public roads and property in residential or rural areas zoning districts shall
not exceed one-half ('/a) foot candle.
e. Please add a note to the lighting plan which states "Each outdoor luminaire equipped with a
lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged
or shielded to reflect light away from adjoining residential districts and adjacent roads. The
spillover of lighting from luminaires onto public roads and property in residential or rural areas
zoning districts shall not exceed one-half footcandlc."
39. [32.6.2 (d) and Chapter 141 Please submit an easement plat and application to the County that
shows all new easements proposed by the site plan. This includes all new drainage, stormwater,
public access easements, etc. The easement plat must be reviewed, approved, and recorded prior to
approval of the final site plan. Rev. 1: Per applicant, response, an easement plat application will be
submitted to the County for review, approval, and recordation prior to final site plan approval.
Response: The required easement plat showing any proposed easements will be submitted to the
County prior to final site plan approval.
40. [General Comment] Prior to final site plan approval, a WPO plan must be submitted, reviewed,
and approved by the Engineering Division. Please see Engineering comments below for additional
information. Rev. 1: Per applicant response, a WPO application will be submitted for review and
approval prior to final site plan approval.
Response: A WPO plan has been submitted in conjunction with this site plan submittal.
42. [18-4.19] The site layout has changed since the initial submittal. Building 5 on the east side of the
development is the building that must meet the minimum and maximum front setbacks. Zoning and
Planning staff have reviewed the new layout. See the language below from footnote #3 of Section
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIs i LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
11
+'Odle*
1 1� .1.001 boulders Parkway P 804.200.6500
T I MGROUP 5uitr 300 F 804.560.1016
Yz "ir,' V-!�I xs- �;,;a :°*h .5 � ' ;`' our`.-. Richmond, VA 23225 www.timmons.00m
4.19 of the Zoning Ordinance fir non-infill front Setbacks: "The rnaxirnum front setback for a non-
infill development sliall be increased to the depth necessary to avoid existing utilities, significant
existing vegetation steep slopes, perennial and intermittent. streams, stream buffers, public spaces
and public plazas shown as such on an approved site plan or subdivision plat, to satisfy a condition
of a. certificate of appropriateness, and in circumstances where there are multiple buildings on the
same lot and prevailing development 1'oatterns. On any parcel with multiple main buildings, at least
one main building shall meet the maximum setback." Based on the parcel shape, location and site
design, the maximum front setback for this site is 61' as shown for Building 5. Please revise the
Cover Sheet: where it lists maximum front setback to state "Front Maxiipum: 61' from eastern
property boundary in accordance with the provisions specified in Section 4.19, footnote 11:3 of the
Albemarle County Zoning Ordinance."'
Response: The applicant appreciates the review and recommendation ol'the maximum building
sethack based on site constraints. Building 5 currently sits a distance of 71'from the front property
line, not 6.1'. the maximum front setback has been labeled as 71' on the rover sheet and layout
plan to permit Building 5 to .satisfy this requirement. The, applicant requests the planning staffs
confirmation or comments on this setback change.
43. (General Corrnncrrtl The f,xistirrg (:ondit.ions drawing identifies in "Existing 35' R/W per plat in
DB 569, page 32" running across 'l Ml' :;2• 55 (Parcel A). Pleaso provide more information on who
owns this easenrent, and how it will be vacated in order to allow the site to be developed a,5 proposed.
if other property owners hold rights to this easement, they will need to be party to and sign an
casement: plat that vacates the 35' R/W.
Re. ponce: The 35' RlW easement has been vacated by the Boundary Line Adjustment plat.
a. Upon review of ether recorded plats for adjacent parcels, specifica.11y'I'MP 32-57A which is not
p,,& of this development proposal, it appears that the labeling used in DB 569, page :32 may be
incorrect. A dirtroad does lie within the area identified as "35' R/W." However, staff cannot
verify if this was ever actually recorded as a road righwil-way, or Wit is simply an access road
that was surveyed and shown on plats that has not actual casement: or right of way
deed/agreement tied to it. Refer to the instruments in DB 632, pages _32-:35 and DB 1715, pages
716-719 for additional clarity on this comment. DB 1715, 716-71() in particular notes it as "Dirt
road beI _, used for access by '.I'.MP 32•.55" but stakes no mention of a recorded instrument that
establishes an actual right°°of=way over The dirt road.
Response. the 35' R/W easement has been vacated by the Boundary Line Adjustment plat.
CIVIL. ENGINE-ERTNG I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE AW HITEC'TURF I CONSTRUCTION SERVICES
1.2
..� 1001 Boulders Parkway P 804.200.6500
T I M M ONS GROUP Suite 300 F 804.560.1016
YOUR ViSIGN ACFtEVED "i"hAOUGH OOHS, Richmond, VA 23225 www.timmons.com
44. [General Comment] The location of the on -site cemetery has been revised and shown on these plans.
The Code of Virginia, specifically § 57-27.1, states that "owners of private property on which a
cemetery or graves are located shall have a duty to allow ingress and egress to the cemetery or graves
by i) family members or descendants..." Prior to final site plan approval, a private access easement
must be provided into the development in order to allow access to the cemetery in accordance with
the Code of Virginia. This can be done as part of the easement plat application referenced in previous
comments. A deed of easement for access to the cemetery will need to be provided for review by
the County Attorney. The deed will need to specifically mention the parties that are granted access
to the cemetery in accordance with the Code of Virginia. Use the following link to access the Code
of Virginia: LINK.
Response: An access easement to the cemetery will be shown on a subsequent submission pending
coordination with property owners.
Albemarle County Engineering Services
John Anderson
SDP201900001— For ISP approval (Engineering defers to Planning)
1. Boundaries of TMP #32-53 do not match current real estate records. Sheet C2.0
indicates parcel boundary to be abandoned by separate instrument, but this poses
several issues: (Rev. l) Not addressed. Applicant response: `A proposed boundary
line adjustment remedying this issue will be submitted and recorded prior to final
site plan approval.'
Response: The 35' RIW easement has been vacated by the Boundary Line
Adjustment plat.
a. If ISP were approved and boundary is not abandoned with new boundaries
created to match ISP, there are design implications, beginning with site plan
approval for an unrecorded parcel.
b. Similar to a., Sheet 0.0 bonus density relies on boundary adjustment that
creates a parcel of 17.40 Ac., which does not exist at present. Engineering
recommends against bonus density that reflects 17.40 Ac. unless recorded
boundaries match overall acreage shown on C0.0 andC2.0.
2. (Rev. 1) Addressed. Applicant response: `The ref. SDP# has been added to the top right corner of each
plan sheet.'
(Rev. 1) Addressed. As follow-up: See item 24, below.
4. Engineering cannot check stormwater quality and quantity values intended to show on -site
SWM facilities and offsite nutrient credit purchase ensure compliance with VSMP
requirements, since calculations are not provided. Energy balance equation is required at
each discharge point, since release is to multiple natural undefined channels. Provide
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
13
some
p 1001 Boulder, Parkway 13 804.200.6500
T i M GROUP P Suite± "300 F 804.560.1016
VOUR %•tstari THRO , G. - ou S. lticlimmid, VA 23225 www.bmmons.com
preliminary design data to support quality /quantity values shown on Q6.0 (including
VaRRM .xls), or disclaimer Nate that reads: "SWM values presented withinitial site plan
are estirrnales. Albemarle County has not reviewed err approved estimates." (Rev. 1)
Comment. persists. Applicant response: `Final SWM management design, calculations,
details, and supporting information will be provided prior to final site plan approval.
Response: The grading and drainage plan, including .storm sewer profiles and schedules, is found on
sheets CG. 0 to C0.6. The hydrology plan is found on .sheets C7.0 to [77.2. Mormwater management
calculations demonstrating quantity and quality requirements are provide in conjunction with this site
plan submission.
5. (Rev. 1) Addressed.
For Finable Plan
_(Iri_l') p rrcl oval: Nearly all comments, below (6.49.) persist.. Comment response
/typical response: `[1`I EMI will be submitted for approval prior to final site plait approval.' For this
reason, unless specifically addressed with no follow-up required, items below need to be addressed for
final site plait (FSP) approval.
Note: Certain items partially addressed require; follow-up.
G. [_2.(l: lrivest.igate F.x. SWM basin shown near north boundary of Parcel C. SWM facilities
are rat-cly eliminated without design of a replacement system. Provide VSM1'/WP0 plan that
considers impact to any existing; SWM facilities. Address loss of'storrnwater quantity or
quality control due to final site plan design, if any.
(Rev. 1) `Will be provided prior lo...'
Response:.11 has been determined that the existing riser structure is notfunctioning and is no longer
in use. The structure is called to be removed on sheet t" 2.1 Demolition flan.
7. Investigate suspected cemetery at southwest corner o1' Parcel C. 'fake necessary precautions and
measures required by law to not disturb and to preserve human remains, or burial caskets. Avoid
impacts via design. Properly identify, address, and mitigate any permissible encroachment upon
suspected burial grounds.
(Rev. 1) `Will he provided ...prior to...'
Response. A chain -link safety fence is depicted around the cemetery to provide protection during
clearing and grading operations. The detail hos been added to .sheet C3.2.
8. ()btain all necessary VI )OT permits to work within public right-of-way, Berkinar Drive, SR 1403.
(itev. 1) `Will be applied for...'
Response: The applicant notes VDOTROW requirements and will apply for permits prior to start of
construction.
9. Obtain and furnish copy of wetland delineation coordination with the U.S. Army Corps of
Engineers. Provide copy or evidence of permit coordination with the i JSACI? for impacts to
waters of the U.S., or wetlands, consistent with federal and state law.
(Rev. ])'Will be obtained prior to...'
Response: Wetland delineation coordination is underway and will he provided prior to final site plan
approval.
CIVIL LNGINEERING I ENVIRONMENTAL I SURI/FYING I GIS
LANO:.;LAPE ARC HITEC`fURI I CONSTRUCTION SERVICES
14
TIMMONS CROUP
YOUR VISION ACHI@VJ:D TSi1101 1H 01i15.
1001 Boulders Parkway
Suite 300
Richmond, VA 232-25
P 804.200.6500
F 804.560.1016
www.timmons.com
10. Proposed boundaries should be labeled as such, distinct from existing property boundaries.
Boundaries shown as existing must match recorded land records /plats. Ref. County GIS. (Rev. 1)
`Proposed and existing boundaries will be further delineated as the future boundary line
adjustment plat is recorded.
11. Clarify and include with FSP text of Note #8 and Exception #10 shown with cemetery label. (Rev. 1)
`Will be provided...'
12. (Rev. 1) Addressed.
13. (Rev. 1) NA -Applicant response: `The proposed "Tree Save Area" is no longer proposed as the
project no longer proposes a unit density bonus.'
C4.0:
14. Ensure parking /sidewalk design conforms to a permissible zoning ordinance option (Ref. pg. 17,
ACDSM; age bele). Bumper blocks are required for all parking spaces 18' in length adjacent to
5' w sidewalks. (Rev. l) Partially addressed. As follow-up: Provide additional width labels wherever
width ambiguous.
Response: Additional sidewalk labels have been added to the plan. All sidewalks adjacent to the
parking areas are 6' in width and therefore do not require bumper blocks.
15. Provide retaining wall design for all retaining walls. Ref. Final site plan checklist (Rev. 1) `Will be
provided...'
Response: Retaining wall designs will be provided on a subsequent submission pending coordination
with the wall designer.
16. Provide handrail for all retaining walls > 4-ft. high. Provide detail NDOT HR-1). (Rev. 1) `Handrails
will be provided where necessary for retaining walls prior to...'
Response : The retaining wall design and associated features will be provided on a subsequent
submission pending coordination with the wall designer.
C4.1:
17. Engineering recommends walk and stairs from 4 parking spaces between buildings 8 and 9 to provide
access (down) to apparent front entrance of these buildings. Similarly, recommend walk and stairs
from 4 parking spaces between buildings 4 and 5 to provide access (up) to the recreational area in
front of these buildings. (Rev. 1) `Staircases will be added and detailed where necessary prior to...'
Response: Stairs have been added behind Building S to provide access to the parking area. The
grading has been revised and additional stairs have been added throughout the site where needed.
18. Engineering recommends sidewalk adjacent to 4-space parking areas between buildings 8 and
9,and between building 8 and the travelway that connects outer and inner loop parkingaisies.
(Rev. 1) Partially addressed. As follow-up: Engineering recommends 6' sidewalk adjacent to
55 parking spaces north of building 3 and 4. Proposed landscape bench may be used for 6'
sidewalk at this location; or given 26' drive aisle width at this location. Engineering requests
30" (2.5' w) pavement pedestrian aisle (solid borders w/ diagonal pattern) to run the full length
CIVIL ENGINEERING I ENVIRONMENTAI I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
15
TIMMO S GROUP
1001 Boulders Parkway P 804.2.00.6500
Suite 300 F 804.560.1016
YOUR E r_^o•,c.f; Richmond, VA 23225 www.timmons.com
of these SS spaces, located at drive aisle edge of 18' deep parking; spaces. This pavement -based
pedestrian aisle (seen at: shopping; centers) signals typical pedestrian use ol' portions of parking
lot where design cannot provide safe convenience of a dedicated walkway. Likewise, identical
reconrrnendation /request fbr pavenent markings for 48 parking spaces west of buildings 9, 10
Response: The applicant appreciates the recommendation for the pedestrian aisle. At this point, no
sidewalk is desired along the northernmost rows of'parking. ADA compliant striping is located
across the drive aisle to provide connections to the buildings. The developer is currently exploring
potential pedestrian access possibilities.
19. Stop signs must he shown located prior to t ;G•12 ramps and pedestrian crosswalks. (Rev. 1) Partially
addressed. As fbilow--up: Provide stop sign at `Y' intersection (Maintenance right, residence bldgs.
alrcad)
Response: A stop sign has been provided at the `Y' intersection as requested
20.Reviw C.:G-12 in plan view to rnateli Detectable Warning Surface detail, VDOIF sheet 3, plan sheet
C:4.:3, for ramps aligned perpendicular with, not diagonally to, two receiving ramps. Please call if any
questions. (Rev. 1) Partially addressed. As lirllow up: Willi FS11, provide CC1-12 ramps at every
crosswalk accessed via sidewalk, k:rrsure graphic irnages of CG-12. dctcetahle surface matches VI )t.Yl'
C,G-12 detail, rev. 07/15.
Response: C'G42 ramps are located at the ends of all crosswalks. The VDUTCG-l2 details have
been updated to the most recent revisions (0412019).
21. L;usurc internal travelways, parking areas, islands, loading spaces, grades, etc. nrect site plan
requirements I isted at Ch. 18 -4 (Rev. 1) Partially addressed. As follow-up: With FSP, label all curb
/travelway radii.
Response. Note ll6 on sheet G4.0 states that all curb radii a S' unless otherwise noted All curb /
travelway roadway radii that are not S' have been labeled on sheets C4..1 & C4.Z
22. (Rev. 1) NA. Applicant response: Retaining wall in this area has been removed.
(::4.2
23. Inset 1-2, right tr' m large section: Label surface asphalt, base asphalt, and base stone thickness.
Provide pavement: Design (Dr, Dp). (Rev. 1) `Final pavement design for the right turn lane will be
provided prior to...'
Response: A section for tlee right -turn lane can fie found on the pavement plan, sheet C4.3.
This section is called out to match the existing Berkmar.Drive pavevment section, which was
taken from the Plan and Profile of Proposed State highway: Rerkmar Drive lsxtension (Route
1403), approved for construction on 12/I V201 S.
24. Design and show storm drain inlet for right: turn lane: off I3erkrnar Drive. Show storm pipe. (Rev.
1) Partially addressed. As lollow••up: Existing topography slopes eastward across Berkmar Drive
Ext. Include plan detail that traces runoff from proposed pipe outfall at development entrance to
lierkrrrir )')rive crossing; (existing; stotrn systcnr). Evaluate existing., storm system constructed with
Berknlar Drive project, for proposed additional development flow: Q10, capacity; Q2, velocity
/erosion.
CIVIL ENGINEERING I ENVIRONMI-N T AL I SURVEYING I GIS 1 1ANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
16
T 1 M Ow N S GR 0 U P
YOUR VISION ACHIEVED THFto iGH OURs.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
P 804.200.6500
F 804.560.1016
www.timmons.aom
25. Provide stop or yield traffic sign at internal travelway intersection near north end, bldg. 12. (Rev. 1)
Partially addressed. As follow-up: Ref. item 19, above.
Response: A stop sign has been provided at the `Y' intersection near Building 12 as requested
26. (Rev. 1) Withdrawn, review error. Proposed grade slopes up at this location.
27. Provide complete retaining wall design for Engineering review. Reference retaining wall plan
checklist (attached. (Rev. 1) Final design and details for proposed retaining walls will be provided
prior to...'
Response: Retaining wall designs will he provided on a subsequent submission pending
coordination with the wall designer.
28. C4.3: Provide pavement design for heavy duty pavement section (travelways /parking area aisles).
Provide ADT at full build -out. (ADT may vary for different loop sections of internal travelways.)
(Rev. 1) Not addressed. Applicant response: `Pavement designs have been provided based on site
geotechnical analysis and report.' Engineering requests Dp, Dr, based on ADT, site specific
geotechnical data. Use Eq. found at 2018 VDOT Pavement Design Guide for Subdivisions and
Secondary Roads in Virginia.
Response: Sections for the on -site heavy duty and light -duty pavement can be found on the
pavement plan, sheet C4.3. Dp and Dr values were not used to determine the pavement sections, as
the ADT on -site would generate thinner pavement sections than the standard minimum sections
recommender) on the plans The CBR was used in conjunction with other site considerations to
generate the recommended pavement sections.
29. C5.0: Engineering recommends against water main /sanitary sewer pipes passing beneath retaining wall;
recommends, instead, skirting the wall entirely by routing distribution and collection around the east end
of the wall. Engineering recommends steel carrier pipes and concrete lintels for water and sewer
distribution or collection mains that may pass beneath (or through) any retaining wall. (Rev. 1) Partially
addressed. Comment persists. Applicant response: `Any utility crossings under proposed retaining wall
will include protective casing for the proposed pipes. Final design and details will be provided prior to
FSP approval.'
Response: Protective pipe casing is called out in the utility profiles for pipes running under retaining
walls Design and details for the casing will be provided pending further coordination with the
retaining wall designer.
C6.0:
30. Q10 values may be relevant, but Ql-year peak flow is most relevant. Design must meet state
stormwater quantity requirements via energy balance equation based on Ql-year. (Rev. 1) Full
SWM analysis for Ql0 and Q1 flows will be provided prior to final site plan approval.'
Response: Refer to sheets C7. q-C7.1 and stormwater calculations binders for SWM analysis.
31. Mite grading easements are required. Submit easement plat application. Provide copy of
recorded offshe easement deed/s. (Rev. ])'All required easements will be proposed and recorded
prior to final site plan approval.'
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE f CONSTRUCTION SERVICES
17
f�r �
1001 Boulders Parkway P 804.200.6500
TIMMONS GROUP Suite .300 F 804,560.1016
ACAMVEta OUAA S. Richmond, VA 23225 wwwAimmons.com
Response: Offsite grading easements are being pursued from the landowner and an easement
plat showing all required easements will be .submitted and recorded prior to final site plan
approval.
32. Provide complete drainage design. Ref. Albemarle County Drainage Plan checklist (attached).
Provide VDOT I D-204, I D-229, i.l)-.268, LD--269 design tables. All appear relevant. Use VD0T
tablelbrinat.. (Rev. 1) `Complete drainage design will be provided prior to final site plan approval.'
Response: Refer to stormwater calculations hinder fur applicable tables and calculations
33. Provide contour labels for existing; contours, especially south, west, and north of proposed development.
(Rev. 1) Partially addressed. As follow-up: Provide additional ex. terrain contour labels for areas west
Response: Additional contour labels have been provided on the plans.
34. unsure VSP reflects subg;radc dimensions of hydrodynamic separators. Stortiffrap systems are far
larger than a std. VD0T MH. flan view final site plan sheets should reflect true, not approximate or
Seltentatic dimensions. (Rev. 1) `full delailslprofileslclituetrsions of proposed hydrodynamic
separators will be provided prior to final site plan approvat.'
Response: hydrodynamic .separator design Is being coordinated with the product vendor and full
details fur the system are forthcoming.
35. (Rev. 1) Addressed. 'rbe proposed SWM stratepy for the site has been revised to replace all
underground detention facility with one pond to serve the entire site. lull design of the pond will be
provided prior to final site plan approval.
36. (Rev. 1) Addressed. Also, see item 35, above.
37. (Rev. 1) Addressed. Also, see item 35, above.
38. (Rev. l) Addressed. Also, see item 35, above. As follow-up: Provide storm conveyance design to
collect and convey SIMI) runoff' front travelway surface at. inter -parcel connection to a defined stream
channel. Design must be appropriate to proposed slopes, consistent. with VI)(}'I' Drainage Mattiaal
Response: Refer to sheets C7.0-C7.1 and stormwater calculations hinders for .SWM analysis.
:39. Evaluate new drainage channels for capacity, and erosion. Provide soil stabilization blanket, where
needed. (Rev. 1) `Analysis of all drainage channels will he provided prior to final site plan approval.'
40. Provide high -flow bypass for all hydrodynamic separators and high -flow bypass .for all detention
systems for events less frequent that the I 0--yr, fi)r rainfall intensity 5.7" in a 24-hr period. Fnsurc
bypass discharge does not cause flooding oftravelways. (Rev. 1) `Full cictails/profiles/clirnerisiotis of
proposed hydrodynamic separators will be provided prior to final site plan approval.'
Response: hydrodynamic separator design is being coordinated with the product vendor and. full
details for the system are forthcoming.
CIVI[_ FNGINEERIN(- I ENVIRONNIFNTAI I SURVEYING I GIS I LANDSCAPE ARC-HITEL-rSIRE I CONSTRUCTION SFRVICES
18
T I S -GROUP
YOUR VISION ACHIEVED THROUGH OUFs.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
P 804.200.6500
F 804.560.1016
www.timmons.com
C6.2:
41. For proposed HDPE pipe, ensure pipe is rated adequate for depth of installation. (Rev. 1) Addressed.
`Proposed HDPE pipe has been replaced with RCP.'
42. Prepare plat showing SWM facility maintenance and access easements. Showeasements. (Rev. 1) `A
plat for all SWM easements will be submitted and recorded prior to final site plan approval.'
43. Prepare plat showing private drainage easements for SWM facility discharge pipes. Showeasements.
(Rev. 1) `A plat for all SWM easements will be submitted and recorded prior to final site plan approval'.
44. Prepare plat showing public drainage easement for site access storm conveyance system elements
along Berkmar Drive, or within VDOT right-of-way. Show public drainage easements. (Rev. 1) A
plat for all proposed drainage easements to be shown on the FSP will be submitted and recorded
prior to final site plan approval.'
Response: An easement plat showing all required easements will be submitted and recorded
Prior to final site plan approval. These easements will be reflected on the FSP as required
45. Ref. ACDSM image, pg. 15, when designing easement width:
I`I'xT �[i@'ri! r i32 �111EiE$+ 3' • 3 ►H S`: T 1&'t�' �Si.�
y,� 1EAS�1>wii' T3!
r.
�I.�#TRri6^l`f
(Rev. 1) `Easements will be drafted to conform with ACDSM image, pg 15.'
46. Sheet scale may be inaccurate; please confirm accurate. (Rev. 1) `Scales to be verified and corrected if
necessary.'
Response: The scale hits been updated to the correct value of l " = 30'.
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS f LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
19
■ o e's
1�
1001 Boulder-s Parkway P 804.200.6500
TIMMONS GROUP Suite :300 F 804.560.10 tG
YOI.P t VWi,�*THROUGI! OL: -S. Rii:hrnund, VA 23225 wwwAimmons.aom
47. 11,0: Use; hatehing or other symbol to indicate areas of proposal grade steeper than 3:1 and provide
note with relbrence to permanent landscape: vegetation hardier titan grass. Ref. ACDSM, pg. 22,
See.8_A.2. (Rev. 1) Not addressed. Applicant response: 'Noted. 'i'}rere are no areas of'proposed
grade steeper than :i:l .' While generally accurate, check proposed grades at: (west of) building 6;
inter-parccl travelway connection; north of-55 parking spaces, N of buildings 3 and 4.
18. Notes:
a. An approved VSMP flan ATuendment is required prior to final Site flan approval; please
submit Wl O Platt at earliest convenience. Coordinate proposed nutrient credit purchase with
Ana Kilmer, Alhernarle County, once VSMI'/WPC) Plan is approved.
h. Please consider atlaclied Final Site Flan, I)raineige, and Retaining Wall plan checklists as
aids to dcsigrt. Checklists guide review.
NI.?W — for FSP Approval
49. C4.2, .Insel .1-1: Provide barricade, notes /details for vim'r-approved barricade at inter -parcel
connuction, once travelway constructed.
Revjsonse: l3arrieade notes and details will he provided on a subsequent submission pending
further coordination with the property owner.
50. C,5.0: lief. VA DEQ Stonnwater Design Specification No. 14, Wet Pond, for any sanitary facility
setback requirements. Adjust proposed sanitary line alignment or wet pond desig ru /location, as
needed.
Response:.Sanitary alignment has been revised to avoid toe, of pond embankment.
51. C6.0: Revise sidewalk grade leading from parking; lot to building; 1 east entrance. Max. grade = 5%.
Ref. Albemarle County Code, 18-:32.7.2.3.b. ref. to VD0'1' Std. Ref. Road Design Manual, Appx.
R(1)-4-1. ref: to 11M-L.D-55.16, sheet 3, 2nd bullet (images, follow) Road Design Manual, Fi(l)-4-1.
(2.) Sklewtalks shall be a rr mimum. of 5 k-ot in wdM, SrcWmtks sheR be
clesigned m wx=Iww with ADA requimments € rid VD T`s Location and
Design It fictional Memoranda 11M4.D-55, Cuth Rams mid Swewalks,..
locaw at
:gl sa r.yiruini it,Q _ aLi2W �r lt-r *m rtcia-rn_ rM
Whom pedestrian access mutes are contained within a stmet or highway right-of-way,
the grade of pedestrian sacx.ss routes shall not exceed the generul grade established
for the adjacent street of highway. Where pedeslrion a=ss rutdes are not contained
widlin a street or hirthway right irsf--way, the {grade of pedestrian saccmq routers shall be
5% maximum
Response:.Videwalk grades have been revised as indicated and .stair have been added
where necessary.
CIVIL FNGINEERING I ENVIRONMENTAL I SURVEYING 1 GIS I LANDSCAi'E ARCHITECTURE I CONSTRUCTION SFRVI('.FS
TIMMONS GROUP
YOUR VI5;OW ACHIEVED T[4ROUG!-; CURS.
1001 Boulders Parkway
Suite 300
Richmond, VA 23225
P 804.200.6500
F 804.560.1016
www.timmons.corn
C6.1:
52. Review proposed drainage design. Provide inlets, spot elevations or realistic revised grading at low
points near parking lot islands. Multiple points in proposed parking areas will trap runoff with no
outlet under proposed design. Revised grading alone cannot address. Additional inlets /pipes are
required to connect with proposed storm conveyance system. Avoid ponding.
Response: Site grading has been revised to direct all surface drainage towards proposed inlets.
Curb cuts have been added where necessary to avoid ponding.
53. Provide fixed impassable barrier to trespass at proposed wet pond. Eventual review of design under
WPO Plan application will restate request for signs warning of drowning hazard, and barrier to
prevent trespass.
54. Recommend preliminary volume design evaluation of wet pond to ensure available space is adequate.
55. Recommend consider watershed size /land cover type proposed to drain to wet pond (% impervious,
acreage), and whether design criteria works. From VA DEQ Stormwater Design Specification No.
14, p. 5:
Canirtbuting Drainage Area. A contnbuting drainage area of 10 to 25 acres is typically
recommended) for wet ponds to maintain constant water elevations. Wet ponds can still function
with drainage areas less than 10 acres, but designers should, be aware that these "pocket" ponds
will be prone to clogging, CxPerience fluctuating water levels, and generate more nuisance
conditions, A water balance should be calculated to assess whether the wet pond will draw drawn
by more than 2 feet after a 30-day summer drought (see equations in Section 6.2).
56. C6.2, Inset I-1: Label structure headwalls.
57. Note: additional comments likely with FSP.
CD911
Andrew Slack
The applicant should contact this office with a list of three (3) proposed road names to this office for approval as
a private road name for this development. Please contact this office directly with any questions or the three (3)
proposed road names.
Response. Applicant is currently generating possible road names and will provide 3 proposed names once
settled on.
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
21
0a•a i
t
i i 1001 Boulders- Parkway P 804.200.6500
T
It I N GROUP Suite 300 F 804.560.1016
YOUR VISION ou,, -. Richmond, VA 23225 www.timmons.com
Albemarle County Department of Fire Rescue
Shawn Maddox
The FDC for each building must be shown on the flans and located within 100' of a hydrant. This can be done
on the final site plan submittal. Thank you for addressing all other comments.
Response: FIX: locations have been revised to meet the 100' maximum separation from fire hydrants.
Albemarle County Service Authority
Richard Nelson
1 recommend approval for SDP201900001 Iierkniar Drive Apartments — Initial with the following conditions:
1. Submit 3 copies to ACSA for review.
3 copies of the EV..P will be submitted to ACSA for review.
2. RWSA sewer capacity will be required.
Calculations. jor RW.4A capacity will be provided prior to final site plan approval.
3. Downstream sewer upgrade utility plan will need to be approved prior to final approval of site plant.
Virginia l)eparhnent. of 'Transportation
Adam .L Moore
Land Ilse
I. Please show inill and overlay on plans i ri accordance with Wl'-2 and show litnits ofinill and overlay- Also
please add the WI'-2 detail to the plans.
Response: The limits of mill and overlay is shown on the pavement plan, sheet C4.3. The WP-2
detail for pavement widening has been added to sheet (4.4.
2. Please providean M01'plan in accordance with the Virginia Work Area Protection Manual.
Response: Relevant trcrjfe control plates from the VW111'M have been added to sheet C4.5.
3. Please provide sight distance lines and profile for proposed entrance onto Route 1403 Ilerkmar Drive.
Response: A sight distance plan and profile has been added on sheet C4.6.
4. Please provide drainage calculations lbr proposed storin water stricture tying into the Roadside ditch, pre and
post construction for adequacy of discharge. Also please plot HCI, on profile.
CIVIL EN ;1NEERING I ENVIRONMENTAL I SURVEYING i GIS I LANnS(:APE ARCHITECTURE i CONSTRUCTION SERVICES
22
1001 Boulders Parkway P 804.200.6500
TIMMONS GROUP Suite 300 F 804.560.1016
YOUR VISION ACHIEVED THROUCH OU S. Richmond, VA 23225 www.timmonsxom
Response: A drainage calculation binder has been included with this submission.
S. Please provide a drainage inlet on the northern side ofthe entrance.
Response: Drainage inlet has been provided for the entrance.
6. Please provide trip generation data.
Response. Trip generation data and turn warrant analysis is being generated and will be provided
prior to final site plan approval.
7. Please provide CG-12 Ramps at proposed entrance for crossing street.
Response: CG-12 ramps have been added on both sides of the entrance.
On behalf of our client and Timmons Group, we appreciate the opportunity to continue working with the County
of Albemarle staff on the development of this multifamily product. If there are any questions or comments,
please feel free to contact me at mitchell.bowser@timmons.com or (804) 200-6485.
Respectful submitted,
4
r
Mitch Bowser, PE
Project Manager
Timmons Group
CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING 1 GIS , LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES
23
RECEIVED
AUG a 9 29.19
COMMUNITY
DEVELOPMENT