Loading...
HomeMy WebLinkAboutWPO201800059 Preconstruction Form 2019-08-08Request for Pre -construction Meeting and Grading Permit ova`` .i. from Albemarle County '3; A��; ��RCtN\P Approved Plan Number: WPO- 2V17-000 q DEQ Permit Number (if applicable): VAR - Approved Plan Name: UyA V-2,_LZA1 to,—Tj�ay"-i�, eo C X_,- (Plans must be approved prior to a pre -construction meeting.) Bond approved date: (Bonds must be approved and posted prior to a pre -construction meeting or permit) Responsible Land Disturber: Print Name: 5f- e_1 State Certification Number: _�L� b ( Z Z i Address '( -7 13 — 21 ' A W D :j�M �y City �1�i2�!3> ��Ltk/i�� / State� A Zip Z(yLOT Daytime Phone Nb(� I q?t/ E-mail Primary Contractor: Print Name CV L2 1� Address 1-71 City State V'A Zip Daytime Phone t " l) �(��' �� D E-mail S� {� t Li�(G� (�a �JT71 ��> �J Cam• (�GpV, ) i�i� Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP, VESCP fees were paid with the application. is 7>ti2�w1 iiGl%i 7/1/14, Revised: 8/29/14, 10/18/18 Page t of 3 Person(s) to attend the Pre -constriction Meeting: Names (tvne or Dint) Firm Contact Number or email /a. coo 1'Ql v V--1j LWb SIJr7�lA Sc�Y On LF�,(, • loi10 WfAt:: y)y • 531•-7337 The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14, Revised: 8/29/14, 10/18/18 Page 2 of 3