Loading...
HomeMy WebLinkAboutWPO201300079 Certified Engineer's Report 2019-08-16TM BOHLER E N G I N E E R I N G Albemarle County Community Development Engineering Department 401 McIntire Road, North Wing Charlottesville, VA 22902 Attn: Frank Pohl Dear Mr. Pohl: 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 PHONE 540.349.4500 August 16, 2019 Via Electronic Mail Re: Underground Detention Vault & Sandfilter Conformance Letter 5th Street Station 5th Street SW & Avon Street Ext. Charlottesville, VA 22902 Albemarle County BE # V 122001 Bohler Engineering VA, LLC (`Kohler") reviewed the as -built conditions for the three (3) underground vaults, one (1) located in Phase I and two (2) located in Phase I, for general conformance with the approved construction plans which are last dated 06/15/15 (Phase I) and 09/20/16 (Phase II). Based solely upon the as - built conditions, to the best of Bohler's knowledge as of the date of this letter, and to the extent same is within Bohler's scope of services as the Civil Engineer, the above underground vaults, which are within Bohler's scope of services for 5th Street Station, have been installed in general conformance with the SPD 2013-00065 FinalSFite Plan Amendment 1 for 5th Street Station — Wegmans (Phase I) (last revised 06/15/15) and Minor Site Plan Amendment IV for 5th Street Station — Overall Phase II (last revised 09/20/16) prepared by Bohler. This conformance was previously provided on February 28, 2017. Bohler also performed a site visit on 8/15/19, during which Bohler visually observed the 13 sandfilters, five (5) located in Phase I and eight (8) located in Phase II, for general conformance with the approved construction plans which are dated 06/15/15 (Phase I) and 09/20/16 (Phase II). Based solely upon this site visit, to the best of Bohler's knowledge as of the date of this letter, and to the extent same is within Bohler's scope of services as the Civil Engineer, the above sandfilters, which are within Bohler's scope of services for 5th Street Station, have been installed in general conformance with the SPD 2013-00065 Final Site Plan Amendment 1 for 5th Street Station — Wegmans (Phase I) (last revised 06/15/15) and Minor Site Plan Amendment IV for 5th Street Station — Overall Phase II (last revised 09/20/16) prepared by Bohler. Should you have any questions regarding this letter or require additional information, please do not hesitate to contact me at (540) 349-4500. �EpLTH p� G� RYAN YAUGERJ y Lic. No.0402056625 %4, 0" ►L - Sincerely, Bohler Engineering VA, LLC 7 Nr Ryan auger, P.E. CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS WWW.BOHLERENGINEERING.COM