HomeMy WebLinkAboutWPO201300079 Certified Engineer's Report 2019-08-16TM
BOHLER
E N G I N E E R I N G
Albemarle County
Community Development
Engineering Department
401 McIntire Road, North Wing
Charlottesville, VA 22902
Attn: Frank Pohl
Dear Mr. Pohl:
28 Blackwell Park Lane, Suite 201
Warrenton, VA 20186
PHONE 540.349.4500
August 16, 2019
Via Electronic Mail
Re: Underground Detention Vault
& Sandfilter Conformance Letter
5th Street Station
5th Street SW & Avon Street Ext.
Charlottesville, VA 22902
Albemarle County
BE # V 122001
Bohler Engineering VA, LLC (`Kohler") reviewed the as -built conditions for the three (3) underground vaults,
one (1) located in Phase I and two (2) located in Phase I, for general conformance with the approved
construction plans which are last dated 06/15/15 (Phase I) and 09/20/16 (Phase II). Based solely upon the as -
built conditions, to the best of Bohler's knowledge as of the date of this letter, and to the extent same is within
Bohler's scope of services as the Civil Engineer, the above underground vaults, which are within Bohler's
scope of services for 5th Street Station, have been installed in general conformance with the SPD 2013-00065
FinalSFite Plan Amendment 1 for 5th Street Station — Wegmans (Phase I) (last revised 06/15/15) and Minor
Site Plan Amendment IV for 5th Street Station — Overall Phase II (last revised 09/20/16) prepared by Bohler.
This conformance was previously provided on February 28, 2017.
Bohler also performed a site visit on 8/15/19, during which Bohler visually observed the 13 sandfilters, five (5)
located in Phase I and eight (8) located in Phase II, for general conformance with the approved construction
plans which are dated 06/15/15 (Phase I) and 09/20/16 (Phase II). Based solely upon this site visit, to the best
of Bohler's knowledge as of the date of this letter, and to the extent same is within Bohler's scope of services
as the Civil Engineer, the above sandfilters, which are within Bohler's scope of services for 5th Street Station,
have been installed in general conformance with the SPD 2013-00065 Final Site Plan Amendment 1 for 5th
Street Station — Wegmans (Phase I) (last revised 06/15/15) and Minor Site Plan Amendment IV for 5th Street
Station — Overall Phase II (last revised 09/20/16) prepared by Bohler.
Should you have any questions regarding this letter or require additional information, please do not hesitate to
contact me at (540) 349-4500.
�EpLTH p�
G�
RYAN YAUGERJ
y Lic. No.0402056625
%4, 0" ►L -
Sincerely,
Bohler Engineering VA, LLC
7 Nr
Ryan auger, P.E.