HomeMy WebLinkAboutWPO201300079 Agreements 2019-08-19ech
neered
C N TE C H ® 9025LCent a Pfointe Drive, Suite 400
ENGINEERED West Chester, OH 45069 Twfitterra
G ERED SOLUTIONS Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Brent Scarbrough January 18, 2017
Attn: Neal Gosdin
155 Robinson Dr
Fayetteville, GA 30214
Project Name: 5th Street Station Wegmans Ph 11
Project Jurisdiction: Charlottesville, VA
Gosdin,
This 2 page letter should be used as official notification to your local jurisdiction with regard to the activation of your
Filterra Systems.
Please be advised that after installation (not by Contech), the Filterra stormwater treatment units were activated on
12/26/2016. Activation refers to bringing the unit into operation by removing the protective boards as well
as installing the plant and mulch layer.
The 1 year maintenance agreement included with the purchase of this product is currently in effect and will expire on
12/26/2017.
The second page of this letter contains a list of each Filterra unit that is covered by this activation letter.
Please feel free to contact me if any additional information is needed.
Sincerely,
Don Personett
Activation and Maintenance Coordinator
Contech Engineered Solutions, LLC
1 of 2 1/18/2017 9:39 AM
Ca® NTECH®
ENGINEERED SOLUTIONS
Contech Engineered Solutions LLC
9025 Centre Pointe Drive, Suite 400
West Chester, CH 45069
Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Fiiterra
�fjlterrall
Contech hereby confirms that the following units were supplied to the subject project as per the approved plans:
Unit # D-24A FT 10x6
Unit # 1-5A FTIB-C 6x4
2 of 2 1/18/2017 9:39 AM
Cs�l� �����® ConteentrePointeDrive, Solutions
9025 Centre Pointe Drive, Suite 400 filterra
ENGINEERED SOLUTIONS Phone:West (513) 45-7 00
Phone:(513)645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Brent Scarbrough January 18, 2017
Attn: Neal Gosdin
155 Robinson Dr
Fayetteville, GA 30214
Project Name: 5th Street Station Wegmans Ph I
Project Jurisdiction: Charlotteville, VA
Gosdin,
This 2 page letter should be used as official notification to your local jurisdiction with regard to the activation of your
Filterra Systems.
Please be advised that after installation (not by Contech), the Filterra stormwater treatment units were activated on
12/15/2016. Activation refers to bringing the unit into operation by removing the protective boards as well
as installing the plant and mulch layer.
The 1 year maintenance agreement included with the purchase of this product is currently )n effect and will expire on
12/15/2017.
The second page of this letter contains a list of each Filterra unit that is covered by this activation letter.
Please feel free to contact me if any additional information is needed.
Sincerely,
'dz��
Don Personett
Activation and Maintenance Coordinator
Contech Engineered Solutions, LLC
1 of 2 1/18/2017 9:44 AM
NT EC H ® Contech Engineered iv , Sui s L 0Cov";`;-
9075 West Chestentre r OH 45069e 400 T,�,�fitterra
ENGINEERED SOLUTIONS Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Contech hereby confirms that the following units were supplied to the subject project as per the approved plans:
Unit # A42A FT 6x6
Unit # A42B FT 12x6
Unit # A28A FTIB-C 8x6
2 of 2 1/18/2017 9:44 AM
�9y ® Contech Engineered Solutions LLC
C��� NTEC H 9025 Centre Pointe Drive, Suite 400
West Chester, OH 45069 ��
ENGINEERED SOLUTIONS Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Brent Scarbrough January 18, 2017
Attn: Neal Gosdin
1SS Robinson Dr
Fayetteville, GA 30214
Project Name: 5th Street Station Wegmans Ph II
Project Jurisdiction: Charlottesville, VA
Gosdin,
This 2 page letter should be used as official notification to your local jurisdiction with regard to the activation of your
Filterra Systems.
Please be advised that after installation (not by Contech), the Filterra stormwater treatment units were activated on
12/15/2016. Activation refers to bringing the unit into operation by removing the protective boards as well
as installing the plant and mulch layer.
The 1 year maintenance agreement included with the purchase of this product is currently in effect and will expire on
12/15/2017.
The second page of this letter contains a list of each Filterra unit that is covered by this activation letter
Please feel free to contact me if any additional information is needed.
Sincerely,
'4A��
Don Personett
Activation and Maintenance Coordinator
Contech Engineered Solutions, LLC
! of 2 1/18/2017 9:36 AM
C AftNTECHO Contech Engineered Solutions LLC ■ a
9025 Centre Pointe Drive, Suite 400 om
West Chester, OH 45069 1 t e ra
ENGINEERED SOLUTIONS Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Contech hereby confirms that the following units were supplied to the subject project as per the approved plans:
Unit # D-24B FT 10x6
Unit # 1-51 FTIB-C 6x6
Unit # 1-49 FTIB-C lOx6
Unit # A-42 FTIB-C 12x6
2 of 2 1/18/2017 9:36 AM
I
11tN TEC H"
Contech Engineered Solutions LLC
9025 Centre Pointe Drive, Suite 400
otfilterfe.
ENGINEERED SOLUTIONS
West Chester, OH 45069
Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Brent Scarbrough September 23, 2016
Attn: Neal Gosdin
155 Robinson Dr
Fayetteville, GA 30214
Project Name. 5th Street Station Wegmans Ph
Project Jurisdiction: Charlottevilie, VA
Gosdin,
This 2 page letter should be used as official notification to your local jurisdiction with regard to the activation of your
Filterra Systems.
Please be advised that after installation (not by Contech), the Filterra stormwater treatment units were activated on
09/20/2016. Activation refers to bringing the unit into operation by removing the protective boards as well
as installing the plant and mulch layer.
The 1 year maintenance agreement included with the purchase of this product is currently in effect and will expire on
09/20/2017.
The second page of this letter contains a list of each Filterra unit that is covered by this activation letter.
Please feel free to contact me if any additional information is needed.
Sincerely,
'64��
Don Personett
Activation and Maintenance Coordinator
Contech Engineered Solutions, LLC
1 of 2 9/23/2016 5:11 PM
C ,� NTEC H 025tCent egPo me Drive, Suite 400
West Chester, ON 45069 Tfllterra�
ENGINEERED SOLUTIONS Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Contech hereby confirms that the following units were supplied to the subject project as per the approved plans:
Unit # A15A FTIB-C 10x6
Unit # A158 FTIB-C 10x6
Unit # Al2A FTIB-C 13x7
Unit # A11A FT 8x6
Unit # A17 FTIB-C 8x6
Unit#A9A FT10x6
Unit # A23A FTIB-C 10x6
Unit # A25A FTIB-C 13x7
Unit # A39 FTIB-C 8x6
Unit # A6A FT 12x6
Unit # A613 FT 13x7
Unit # A7 FTIB-C 10x6
Unit # A26A FTIB-C 6x6
Unit # A29A FTIB-C 8x4
Unit # A30 FTIB-C 8x4
Unit # A36 FTIB-C 6x4
Unit # A38A FT 6x4
Unit # B7A FTIB-C 8x6
Unit # G8A FT 13x7
2 of 2 9/23/2016 5:11 PM
ec
C%&0V7NTECHa
9025tCentre Pointe Drive, Suite 400
ENGINEERED SOLUTIONS
West Chester, 450
Phone: {513} 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Brent Scarbrough
Attn: Brian Bishop
155 Robinson Dr
Fayetteville, GA 30214
Project Name: 5th Street Station Wegmans Ph II
Project Jurisdiction: Charlottesville, VA
Mr. Bishop,
Tfilterraq,
September 23, 2016
This 2 page letter should be used as official notification to your local jurisdiction with regard to the activation of your
Filterra Systems.
Please be advised that after installation (not by Contech), the Filterra stormwater treatment units were activated on
09/2012016. Activation refers to bringing the unit into operation by removing the protective boards as well
as installing the plant and mulch layer.
The 1 year maintenance agreement included with the purchase of this product is currently in effect and will expire on
09/20/2017.
The second page of this letter contains a list of each Filterra unit that is covered by this activation letter.
Please feel free to contact me if any additional information is needed.
Sincerely,
Don Personett
Activation and Maintenance Coordinator
Contech Engineered Solutions, LLC
7 of 2 9/23/2016 5:21 PM
C711CONTECH
Moil Contech ® Contech Engineered Solutions LLC
9025 Centre Pointe Drive, Suite 400 "i f 'I t e rra:
West Chester, OH 45069
ENGINEERED SOLUTIONS Phone: (513) 645-7000
www.ContechES.com
Contech Activation Letter - Filterra
Contech hereby confirms that the following units were supplied to the subject project as per the approved plans:
Unit # 1-16A FT 8x4
Unit # 1-16B FT 8x4
Unit # D-1013 FT 13x7
Unit # D-11A FT 8x6
Unit # D-13A FT 130
Unit # D-10A FT 130
Unit # D-23A FT 12x6
Unit# D-19 FTIB-C 6x4
Unit # D-30B FTIB-C 130
Unit # A-47 FTIB-C 8x4
Unit # D-28A FTIB-C 8x6
Unit # D-29A FTIB-C 8x6
Unit # D-14 FT1B-C 8x4
Unit # 1-29 FTIB-C IM
Unit # 1-46 FTIB-C 10x6
Unit # D-15 FTIB-C 12x6
Unit# D-18 FTIB-C 12x6
Unit # D-33 FTIB-C 8x4
Unit# D-22 FTIB-C 10x6
Unit # 1-24 FTIB-C IM
Unit # D-36 FT1B-C 12x6
Unit # D-9 FTIB-C 13x7
Unit # D-21 FTIB-C 6x6
Unit # 1-22 FTIB-C 130
Unit # 1-31 FTIB-C 13x7
2 of 2 9/23/2016 5:21 PM