This submission includes 2 new automotive dealerships; which are separate
entities but situated on adjacent properties at Pantops Corner of Route 20
& 250. The new Mazda Dealership will be located in the same location as
the existing Mazda (1289 Stony Point Rd.); replacing the 1970's CMU block
structure to be demolished. In its place, the new Mazda will provide all the
amenities of a full -service dealership: an up-to-date showroom with wait-
ing areas and offices, a vehicular drop off station as well as a new Service
Bay Garage. While the new Mazda complex occupies a similar footprint
as the old, it will provide a much -improved plan for both internal daily
business operations as well as on the exterior increasing the efficiency of
the site and improving its circulation. Just as important and related to the
E.C. review, the new Showroom/Service Center will provide a much -need-
ed upgrade from the existing - a somewhat dilapidated structure on an
unimproved site. We see this project as an opportunity to enhance the
character of the corner by improving the Site Plan with better organization
and improved county recommended landscaping. And from an architec-
tural standpoint, the project replaces the existing with a new building that
addresses the corner and is more suitable to its prominent location.
The current Mazda design standard is a contemporary style. Subdued with
a simple combination of light and dark metal paneling, the exterior fapade
shows enough variety to create and maintain interest but not overly
flamboyant so as to overwhelm the rest of the character on the corner or
go against precedent on the 250 corridor. Large storefront windows are
added to the fapade which rounds out the material palette and provides
a healthy amount of daylighting for the interior. Mazda's main design
feature - referred to as 'the jewel box' - is a 2 story room enclosed in a
glass frame that encourages one's gaze on the outside into the interior
environment. This 'jewel box' seems an appropriate answer for addressing
the Pantops Corner at this difficult site. Its prominent but well proportioned
oversized glass wall is oriented toward the corner and enhances the impor-
tance of its location. Further, the interior wall of the jewel box is lined with a
wood plank the which forms a warm contrast to the exterior and materially
ties into the local vernacular.
The limitations of this particular site is an undeniable aspect of assessing
both project plan layouts. As the diagrams on the following page illustrate,
a major feature of the site is the established electric easement cutting
across a large section of the south east corner; directly related to the large
high voltage power lines overhead. Although many would agree in recom-
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.9 71.7 160
www.brw-architects.com
mending positioning the building's prominent corner (and jewel box) closer
to the street edge, the easement has forced us to locate the building to-
ward the rear of the site. You will also notice that the easement - in running
diagonally across the site - pinches the southern portion. This circumstance
along with the presence of steep slopes - shifts the Mazda building toward
the north west section.
Vehicular circulation is another major component limiting options on how
the site might be laid with safe and efficient traffic flow. Engineering rec-
ommendations for limiting entry to a shared access make the notion of
efficient traffic flow paramount to this already tight, oddly shaped site. The
current building plans strategically place the customer drop off garage
as close as possible to the main road entry - which thereby reduces the
amount of cars driving around the parking lot. In addition both dealer
drop-off stations - which have to be adjacent to the showroom - are also
situated where a more private drive connects the drop off to the service
garage.
The new VW complex (131 1 Stoney Point Road) will provide the same
full -service amenities as Mazda and is located on the next parcel down
on the lot that currently includes the old Rexall building and also a smaller
out -building to the north; both of which are slated for demolition. Other
than the buildings mentioned above, the nature of this lot is mostly an old
parking lot and overgrown vegetation. Unlike Mazda, which is oriented
orthogonal to Rt. 250, VW orientation turns its front fapade to run parallel to
Rt. 20; helping to reinforce and maintain a street edge. With the electrical
easement less of a constraint on this parcel, the major limitation is the site's
long and skinny proportion. As with Mazda, the buildings orientation allows
for immediate proximity from the Entry to vehicular drop-off as well as an
efficient connector driveway from drop off zone to Service Bays. As with
Mazda, the entry to the Service Bays are hidden/screened from site by the
main building. As with Mazda, this particular site layout is advantageous
in allowing for efficient daily operations and a plus for the Entrance Corri-
dor in the way it limits the visual noise of constant visible moving vehicular
traffic on site.
While these projects will be under one ownership, as 2 unrelated corpora-
tion on different parcels, they are considered separate projects. However,
given their adjacency and location on an important corner of the En-
trance Corridor; the county recommended studying them together given
the impact they will ultimately have in the area. We look forward to work-
ing with the county in providing the best possible design solutions.
PROJECT NARRATIVE
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
6 R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.971.7160
www.brw-architects.com
Response Memo to County Recommendations
1. Revise Forms, proportions, scale and materials to achieve greater
balance of contemporary design with historic compatibility
• VW - The following are changes made in response to the above
recommendation:
o Reducing Length of Front Facade and in turn diminishing the
front curtain wall.
A major design revision was achieved by removing the Ser-
vice Bay Doors from the main glass front facade and pushing
the entire Service Bay front back from the main facade by
15'. This revision relates to the Design Guidelines by breaking
down the building scale, reducing the sense of blankness of
the original predominantly glass front facade, and fostering
greater connection to the local historic fabric.
o Numerous Material Changes:
Both the addition of stone paneling replacing VW's white
metal paneling and the addition of brick create a greater
balance of contemporary with Historic compatibility.
• Mazda -
o Replacing all white metal paneling with Brick -
A good deal of the original Mazda design included white
metal paneling that we are now substituting for brick.
o Addressed further breaking down the scale of the Service Bay
block through material detailing.
While the original design begins to break down the scale of
the entire building by different `sub-massses' , the Service
Bay scale and proportion has been revised in this revision by
bringing the new brick down to the corner. This move elimi-
nates the stark contrast between the upper and lower half of
this volume - which created a sense that the upper white sec-
tion was floating - and in turn creates a sense of `grounding'.
In addition, the revised design articulates patterning through
detailing reveals within the brick; which helps to break down
and lend interest to the brick face.
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
2. Revise the architectural desians to use forms, features. materials
and colors that are compatible with the forms and features of signif-
icant historic buildings in the area. Consider brick or stone or other
natural materials instead of metal panels. Consider revising the
massing of the VW service drop-off.
• VW
o Per Board's recommendation, we revised the Service Drop
off Bay - disenagaing it from the main front facade; thereby
breaking down the scale of the overall structure.
Now appearing as a smaller volume beside the larger show-
room, this redesign is more in keeping with the local context
by reducing the extent of the main glass facade and creat-
ing a larger to smaller relationship that not only relates better
to the surrounding historic structures but also to the Mazda
design.
o Stone - particularly limestone paneling -
shall replace the orignal white metal paneling on the design
main frames.
o Brick is now being used as a secondary accent material ink
cluding at the front elevation of the Service Bay.
Adding a material more in keeping with the local building
material palette.
• Mazda
o Brick shall replace all white metal paneling
A major shift in the predominant building skin that brings the
design more in line with the local context.
3. Provide Details proposed curtain wall
• See included detail drawings
4. Clarify that the windows in the service wing use vision c la ass
• Confirmed
5. Revise Design to emphasize human scale
• VW
o The new revised massing reduces the overall scale
of the building by breaking it down to a major and minor
volume; thereby moving from a more monumental design to
one more in line with the human scale.
o The Entry Portals within the Showroom glass facade help re-
late the 2 story structure to the human scale
and provide an instantly recognizeable entry element for the
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.9 71.7 160
www.brw-architects.com
pedestrian.
Also the entry now clad in limestone - were reduced in
size upon redesign.
o The new material change provides a warmer, more tex-
tured and sensory experience for the human scale.
• Mazda
o The Mazda Design breaks down the entire complex into
a series of massings more in keeping with the human
scale.
o Although a 2 story space, the Mazda 'Jewel Box' is lined
inside with a warm wood the
that relates better to the human scale vs a colder ma-
terial.
o As with VW, the Mazda switch to a majority of exterior
brick as a new material change provides a warmer,
more textured and sensory experience for the human
scale.
6. Revise Desian to establish areater coordination with nearb
buildings.
• VW
o With a change of materials - brick and stone - we are
relating the new VW to the best precedents within the
surrounding context.
o The building's orientation on site also reflects the inten-
tion of defining the street edge while also hiding the
Service Bay volume to the rear of the site.
0
• Mazda
o The reduction of a majority of the metal paneling.
o White Brick - there are many examples of brick / stucco
palette within the corridor.
With the grey to white combination, we are striving for
an elegant solution that on the other hand doesn't call
too much attention to itself and fits well within the sur-
rounding fabric.
7. Revise the Trademark Desian to meet the EC Guidlelines
o seepage 'Existing trademark Buildings for comparison
imagery and further clarificaiton on how these particular
designs depart from the standard trademarks.
8. Provide specificaiton on window Glass
o glass to meet EC guildelines - sample can be provided if
requested.
0
12. Standard Mech Equip. note placed on Architecturals
13. Eliminate the illumination trough from the design.
o We request keeping illumintion trough with the condition that
it be set on a timer per the County's regulation.
9.-30. Refer to SITE PLAN
RESPONSE TO COUNTY COMMENTS
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
existing VW site looking north east on RT 20
existing VW site looking south east on RT 20
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.971.7160
www.brw-architects.com
existing Mazda site looking north east on RT 20
existing Mazda site looking south east on RT 20
SITE EXISTING PHOTOS
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
1 " = 100'-0"
PROPERTY LINE
FRONTAGE
1 " = 100'-0"
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.971.7160
www.brw-architects.com
1 " = 100'-0"
SITE DIAGRAMS
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
�. —PROPERTY LINE
2
i
I
Building to be
demolised
scale: 1 " = 50'-0"
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.971.7160
www.brw-architects.com
pR�'OF
Rrylp�F
II building to
demolised
1311 Stony Point RD
II
ELI `:::::::
ILI
�.N
Existing Mazda
I1298 Stony Point
I
I
Parking lot
STONY p l20 `
O/NT
EXISTING SITE PLAN
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
scale : 1 " = 50'-0"
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.971.7160
www.brw-architects.com
FA
I
BUILDING PLANS AND SITE CIRCULATION
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019
B R W A R C H I T E C T S
112 fourth street NE
charlottesville virginia 22902
434.971.7160
www.brw-architects.com
EXISTING SITE PHOTO
LOOKING NORTH EAST FROM RT. 250 INTERSECTION
FLOW MAZDA/ VOLKSWAGEN AUTOMOTIVE SHOWROOM & SERVICE CENTER
ARB Submittal
June 24, 2019