Loading...
HomeMy WebLinkAboutWPO201900046 Review Comments WPO VSMP 2019-08-21COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit Plan review Project title: Kappa Sigma International Headquarters Project file number WP02019-00046 Plan preparer: Logan O'Day / Roudabush, Gale & Associates [lodayAroudabush.com ] 172 S. Pantops Drive, Charlottesville, VA 22911 Owner or rep.: Chad Gebhardt, Kappa Sigma / 1610 Scottsville Road, Charlottesvillle, VA 22902 [ chadghq.kappasi mg s.org ] Albemarle Carters Mountains Management Company, LL / 1610 Scottsville Rd. Charlottesville, VA 22902 Plan received date: 25 Jul 2019 Date of comments: 21 Aug 2019 Reviewer: John Anderson County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied for reasons outlined, below. The application may be resubmitted for approval if all comment items are satisfactorily addressed. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESOP, (3) a SWMP, and (4) any TMDL measures necessary. Link to County template: httt)://www.albemarle.org/ul)load/imaees/forms center/departments/Community Development/forms/Enein eeringand _WPO_ Forms/Stormwater _Pollution _Prevention _ Plan_ SWPPP_template.pdf 1. Provide SWPPP. Use county template (link, above). The PPP content requirements can be found in County Code section 17-404. SWPPP —Provide I I" x 17" Exhibit. Recommend ESC Plan as template. Show solid/non-hazardous waste dumpster; sanitary facilities (port -a John); solvent -paint storage; concrete wash -out; on -site fuel storage; rain gauge. DEQ, during periodic inspections of active projects, instructs on importance of an Exhibit that shows location of these features. All should drain to containment. For example, silt fence downstream of port -a John. Concrete wash -out, dumpster draining to trapping device (lined, in case of concrete wash -out). On -site fuel storage berm with 10ml liner, sized to hold fuel volume + 2 yr. storm event. .PDF samples available. Exhibit is not intended as a detailed design, but to show containment and locations which may change over time. Exhibit is a construction aid and resource protection/inspection management tool. . C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for single item listed, below (item 8). The stormwater management plan content requirements can be found in County Code section 17-403. Amendment Narrative, sheet 1, states: "This Amendment proposes to pave a 0.32 Acre stabilized grass parking area with asphalt. The original WPO Plan was approved in March 2005. The original site plan was Engineering Review Comments Page 2 of 5 amended in 2007 for the expansion of the grasspave parking area (0.32 Acres) and an impervious recreational area (0.12 Acres). Letter of revision #2 dated August 15, 2018 proposed to change the recreational area to a 5000 sq. ft. picnic pavilion. The pavilion has since been constructed and is shown as existing on this plan set. Since there have been no updates to the original WPO, this Amendment evaluates the existing basin capacity and quality treatment as originally designed for the added impervious area based on IIC criteria. Proposed changes include expanding the retention basin on the south of the property for water quantity and quality, and adding curbing, pavement, and storm sewer to the existing grass parking lot." [ emphasis added ] 2. After review, files indicate WPO200400050: a. Is not an active permit, but rather is a completed project (details): i. WPO plan bond (ESC and SWM plan bond) were released 7/18/2011. ii. Project was complete; permit closed with bond release over eight years ago. b. A VPDES permit does not exist; none is listed in DEQ SWCGP database as active, terminated, or inactive. c. Technical criteria IIB apply to request for new land disturbance. d. Amendment to closed permit WPO200400050 is not an option. e. WPO200400050 proposed land disturbance appears complete. f. Note: Pavilion was recently constructed instead of impervious recreation area shown with WPO200400050. g. Engineering does not amend plans that are inactive, or for which WPO bond has been released. 3. Rather, a request to disturb any additional area/s at Kappa Sigma International Headquarters, or proposal to transition from grasspave parking to asphalt parking, requires a new application, and is subject to requirements listed at county code, chapter 17, and 9VAC25-870-65 (water quality) and -66 (water quantity). File # WPO201900046 is assigned to this project; it is a new WPO Plan. 4. Ref. requirements at county code: 17-401, -402, -403, -404, -405. 5. Revise plan title: delete reference to Amendment. Include VSMP /WPO201900046 in title. Recommend title plan: `Kappa Sigma International Headquarters VSMP /WPO201900046.' 6. Ref. satellite image, below. Unless misreading imagery, proposed impervious area has been constructed since at least 3/9/10. A stone or stone dust surface is visible in area WPO201900046 Application proposes to transition from grasspave to asphalt pavement parking area (sheet 3). 7. Revise plan to include Existing Conditions sheet that accurately reflects structures, contours, land cover, paved or stone parking surfaces, and existing SWM facility with labels and notes as needed to clearly indicate existing conditions on date of VSMP /WPO application, consistent with satellite imagery. Application is misleading since added impervious area appears to have been added in 2010; that is, not proposed to be added. Please clarify. 8. Note: $200 Amendment fee is insufficient. VSMP Application fee is required. Ref. table /fee schedule at code 17-208. $290 is required; balance due =$90. 9. In may respects, this appears to be an application for post -development plan approval and grading permit for work performed /completed (5,000 sq.ft. pavilion), and proposed impervious parking. Although parking area may not be asphalt pavement, it has not been grasspave since at least Mar 2010 (satellite photo image, below). 10. Related to 7., ensure all elements of plan are comprehensive, clear, and accurate. For example: a. Sheet 3: i. Show pavilion roof leader lines, consistent with post -developed drainage area map. ii. Also: item d., vi., below. b. Sheet 4: i. Revise LOD to exclude stone /stone dust area to be paved. Land disturbance unlikely in this area. Area has been stoned since at least Mar, 2010. ii. Revise CE to PCE (paved construction entrance). c. Sheet 5: Engineering Review Comments Page 3 of 5 i. Provide SWM facility installation, maintenance and inspection information corresponding with whichever VA DEQ Stormwater Design Specification is selected to replace retention basin II, since criteria IIB applies to this project. ii. Include periodic inspection checklist on plans (source: VSMH, Appendix C). Engineering can provide. iii. Include Construction Record Drawings (As -built) for VSMP on plans. Link: http://www.albemarle.orgLupload/images/forms_center/departments/Communiiy Developmen t/forms/Engineering_and _WPO_Forms/WPO_VSMP _Construction _ Record Drawings Polic y 23May2014.pdf d. Sheet 6: i. Select a 9VAC25-870-65 practice; practices 1-15 available. Retention basin II is a IIC criteria stormwater management facility; select, for example, extended detention pond or bioretention basin, and furnish relevant design for that practice. Link: hlt2s://www.swbMp.vwrrc.vt.edu/. ii. Provide re -development VaRRM.xls for project. iii. Provide calculations that demonstrate compliance with 9VAC25-870-66. iv. Provide deed bk.-pg. ref. for existing SWM facility /Access easement. v. If SWM facility /Access easement does not exist for existing SWM facility, submit separate easement plat application. Ref. county website for easement plat application. vi. Include pavilion leader line concentrated discharge in design. e. Sheet 7: i. Remove storm pipe structures from LD-229 table, unless downstream of storm pipes proposed with this VSMP plan. Label all structures in plan view that remain, once LD- 229 table is revised. f. Sheet 8: Provide typ. details, including: i. VDOT inlet shaping (IS-1) ii. MH steps (ST-1) iii. VDOT CG-2, CG-6, if either curb type proposed g. Provide Layout sheet. Ex. Drainage Area Map, Post-dev DA Map, Phase I ESC plan, Narrative, SWM Narrative provided, but not a layout showing improvements proposed with project. h. On layout sheet, show: i. Proposed improvements, ii. Curb, if curb is proposed, iii. Typ. parking space L X W, iv. Parking lot aisle width. 11. Query of CV returns no recent LOR reviews. Most recent site plan -related review is SDP200700008 (search string: `SDP20xxxxxx, `Kappa'). Provide copy of LOR approval /county correspondence. Engineering did not, apparently, review LOR, which proposed 5000 sq.ft. pavilion in lieu of a 0.12 Ac. impervious recreation area. Again, this application appears to seek approval for constructed elements, and to place asphalt pavement on stoned parking surface. Please clarify. 12. Provide deed bk.-pg. reference to recorded Maintenance Agreement (Ex. SWM facility). Satellite /Pictomet1y2: (Photos, 2010 thru present indicate stone paved parking, not g asspave) Engineering Review Comments Page 4of5 CONNECTExPLORM 41, 13. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is pending for reasons listed, above. Once revised plan submitted, ESCP comments are a possibility. The erosion control plan content requirements can be found in County Code section 17-402. The VSMP permit application and all plans may be resubmitted for approval when all comments have been addressed. For re -submittal, please provide 2 copies of the permit package with a completed application form. Engineering plan review staff is available from 2-4 PM on Thursdays if you wish to meet to discuss this review. Process After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements may also need to be completed and recorded. The Engineering Review Comments Page 5 of 5 County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees (if an existing Agreement is not recorded). After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing, if LOD >1.0 Ac., which does not appear likely on this project. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application (SWPPP Registration Statement). DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county (preceding: if state VPDES permit is required /appears unlikely). Easements must be recorded prior to VSMP approval; recordation is required to receive a Grading Permit. After DEQ coverage is issued, the County can hold a pre -construction conference. Applicants will need to complete the request using a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptfonns.asp?department=cdenaMMo Ifyou have questions /concerns, please contact me at janderson2kalbemarle.org or at 434.296-5832-x3069. Thank you J. Anderson, Engineering WP0201900046 Kappa Sigma headquarters 082119