Loading...
HomeMy WebLinkAboutSUB201900071 Review Comments Road Plan and Comps. 2019-08-28County of Albemarle Department of Community Development Memorandum To: Emily Cox From: Megan Nedostup- Principal Planner Division: Planning Services Date: May 28, 2019 Rev: August 28, 2019 Subject: SUB2019-071 Pleasant Green- Phase 1 Road Plans 1. Sidewalks and street trees should be bonded with the road plans. Rev1: Comment needs to be addressed with bonding. - - u . _.,- r, r r... M ....,lnect to Alston Street? Rev1: Comment addressed since VDOT does not permit connection. 3. As commented on during the initial site plan (SDP2018-068): "Will the alley need to be a road for frontage purposes for Phase 2 of this development? If so, this alley should be a public private road and will need to meet all the requirements including sidewalks, street trees, etc. If it will be a private road, a justification will be required under 14-233. In addition, the lots will be double frontage lots and need to include screening as required." Rev1: Comment addressed with layout revisions. 4. Any parking and landscaping related to parking should be removed from the road plans, including landscaping within the open space areas. The road plan landscaping should just include landscaping related to the right of way/street trees. The required landscaping outside of the right of way will be reviewed and approved with the site plan. Revised the landscape plans and plant list accordingly. Rev1: Comment addressed. 5. Any required street tree landscaping that is not within the right of way will be required to be in an easement that will need to include a deed for maintenance. Rev1: Comment will need to be addressed with a plat after road plan approval. 6. Any notes outside of those required for the road plans should be removed from the road plans. For example, density and parking requirements are not needed for road plan approval. Rev1: Comment partially addressed. Please note that any improvements shown outside of the road requirements including lots, lot layouts, building, landscaping, open space, etc are not approved with this road plan. Site plan and subdivision approval will be required for those elements outside of the right of way. 1 New Comment: 1. A special use permit has been submitted that includes roads within this plan and recommended conditions that may affect the layout of the plan/lots. A new road plan may be required if the SP is approved with the recommended conditions of the SP. Please contact Megan Nedostup at the Department of Community Development 296-5832 ext. 3004 for further information.