HomeMy WebLinkAboutWPO201900026 Bond Estimates 2019-08-28Project Name: VSMP Plan for Wawa WP0201900026 WPO file number: WP0201900026 TM P(s): 07800-00-00-005AO Date Estimate Completed: 08-28-19 Erosion and Sediment Control Bond Estimate Item Item Number 1 stablization (PS, TS) 2 silt fence (SF) 3 safety fence (SAF) 4 diversion (DID, FD, RWD) 5 temporary slope drain (TSD) pipe length 30 silt fence inlet protection (IP) 31 stone inlet protection (IP) 32 outlet protection (OP)-Trap#1 length 33 outlet protection (OP)-Basin#1 length 34 outlet protection (OP) length 35 channel (SCC, matted) length 36 check dam depth in channel 37 construction entrance (CE) 38 wash rack 39 paved construction entrance 40 rip -rap, placed depth 41 width 42 43 survey and layout (price per 0.1 mi.) acres 44 mobilization 45 Temporary Access road WP02o1900026 - Wawa Pantops o82819_ESC_bond_est No. Unit Unit Cost Cost installed acres $5,000.00 $8,150.00 66 ft $5.00 $3,300.00 ft $5.00 $0.00 ft $13.00 $0.00 0 ft pipe diameter 0 in $0.00 $0.00 $100.00 $0.00 $200.00 $1,000.00 0 ft width 0 ft $0.00 $0.00 0 ft width 0 ft $0.00 $0.00 0 ft width 0 ft $0.00 $0.00 0 ft width 0 ft $0.00 0 ft channel width 0 ft $0.00 $0.00 $2,500.00 $0.00 $2,000.00 $2,000.00 $3,500.00 $3,500.00 0 ft length 0.0 ft 0.0 $60.00 $0.00 1.6 traps and basins 0 $800.00 $2,500.00 cost sum $21,425.00 contingency $2,142.50 Total $23,570 8/28/2019