Loading...
HomeMy WebLinkAboutSUB201800221 Review Comments 2019-07-23 Short Review Comments Report for: SUB201800221 — Woolen Mills Light Industrial Park - Easemer SubApplication Type: Easement Plat Date Completed: 01/15/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter dated 1-15-2019 uploaded to Countyview/Laserfiche. Date Completed: 12/27/2018 Reviewer: David James Division: CDD Engineering Review Status: Requested Changes Reviews Comments: 1-22-19 Additional comments: • Show the SWM facility and deed book/page on the plat. • Once plat is finalized engineering will send the owner the deed of dedication &easement. The deed &plat are to be recorded prior to WPO amendment plan approval. 12-27-18 Woolen mills plat: Cover— • Include New Forest Open Space easement in title in addition to the other easements mentioned • Provide the source DB/PG reference(s)for this plat - • List date of the field survey Sheet P5— • Drainage easement off of Franklin St. is correctly labeled as public. Remove 'Public'from the other drainage easement labels; Not needed. • Fix 'Easment' misspelling for the Forest Open Space label. Sheet P6— • ACSA sanitary easement extends thru RWSA property, and will need to provide evidence of agreement. Date Completed: 01/18/2019 Reviewer: Jeremy Lynn Division: ACSA Review Status: Requested Changes Reviews Comments: Date Completed: 12/21/2018 Reviewer: Willis Bedsaul Division: VDOT Review Status: No Objection Reviews Comments: Date Completed: 02/27/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: Requested Changes Reviews Comments: See comment letter uploaded to laserfiche dated 2-27-2019. Date Completed: 02/21/2019 Reviewer: David James Division: CDD Engineering Page: 1 of 3 County of Albemarle Printed On: July 26,2019 Review Status: Requested Chant Reviews Comments: 3-20-19-(Comments updated) 2-21-19- (Comments updated) 12-27-18 Woolen mills plat: Cover— • Include New Forest Open Space easement in title in addition to the other easements mentioned Addressed. • Provide the source DB/PG reference(s)for this plat Addressed. • List date of the field survey Addressed. Sheet P5— • Further impacts to the preserved slopes will have to be evaluated. All public drainage easement widths should be sized according to the easement'width equation found on Page 15 of the Design Standards Manual. • Fix'Easment' misspelling for the Forest Open Space label. Addressed. Sheet P6— • ACSA sanitary easement extends thru RWSA property, and will need to provide evidence of their approval. Pending RWSA approval. 1-22-19 Additional comments: • Show the SWM facility and deed book/page on the plat. Addressed. • Once plat is finalized engineering will send the owner the deed of dedication &easement. The deed & plat are to be recorded prior to WPO amendment plan approval. Comment still valid. Date Completed: 02/25/2019 Reviewer: Jeremy Lynn Division: ACSA Review Status:- Requested Changes Reviews Comments: The RWSA easements do not show a deed book reference. Include these if the easements have been recorded. Date Completed: 02/22/2019 Reviewer: Victoria Fort Division: RWSA Review Status: Requested Changes Reviews Comments: The developer provided RWSA with pdfs of the plat and deed of easement for the Woolen Mills LI Park for review. RWSA will be granting ACSA an off-site sewer easement as part of this project. I wanted to make sure you got my comment for the file, see below. Let me know if you need anything else from RWSA on this. Date Completed: 04/03/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: See Recommendations Reviews Comments: All Planning comments have been addressed based on the revised plat dated 3-28-2019 sent to Cameron via email on 4-2-2019, aside from submitting the deeds of easement to us for review. One thing I wanted to ask: will the deeds for the new RWSA easements be recorded with the plat? If so,then the last ACSA comment is addressed. However, if the RWSA deeds will be recorded prior to the plat recordation, Richard Nelson asks that the instrument reference added to the RWSA Page: 2 of 3 County of Albemarle Printed On: July 26,2019 easement callouts. - Date Completed: 05/08/2019 Reviewer: Frank Pohl Division: QDD Engineering Review Status: No Objection Reviews Comments: Date Completed: 07/23/2019 Reviewer: Unassigned Division: County Attorneys Office Review Status: Approved Reviews Comments: Date Completed: 07/23/2019 Reviewer: Cameron Langille Division: CDD Planning Review Status: Approved Reviews Comments: Page: 3 of 3 County of Albemarle Printed On: July 26,2019