HomeMy WebLinkAboutARB201900070 Certificate of Appropriateness 2019-08-09 4OF A
a$AI-I i�llllh'---
NIO,
vl al
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone (434) 296-5832 Fax(434) 972-4126
August 9, 2019
Larry & Barbara Hall
1929 Northside Dr
Charlottesville, VA 22911
RE: ARB-2019-70: Northside Materials Recovery Facility, Final Site Plan (TPM 03200-00-00-022C3)
Dear Mr. & Mrs. Hall,
I have reviewed the plans with revision date of 8-1-2019 submitted for the above referenced project. The changes
made in these plans address the conditions of approval outlined at the ARB meeting held on July 1, 2019.You may
consider this letter your Certificate of Appropriateness.
This approval is specifically conditioned on the following:
1. Execution of the design indicated on the final approved plans, attachments, materials, samples, and
other submittal items presented.
Please note the following: •
1. Any changes in the approved design will require a new application and additional review.
2. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid.
If there is no site plan required for the proposed work,the Certificate of Appropriateness is valid•for 3
years. Applicants requesting an extension of the period of validity must do so in writing. The letter
must be received by the Director of Planning prior to the expiration date.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Margaret Maliszewski
Chief of Planning/Resource Management
434-296-5832 x3276
mmaliszewski@albemarle.org
cc: Justin Shimp
Shimp Engineering, P.C.
912 E High St
Charlottesville, VA 22902
File