Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ARB201900070 Checklist 2019-08-09
110 ilk /Q- 7 /t 6 .�/ 7/77, L 6%- xf ' 410� U („/ 2 �lll Review Board Rt ��� Architectural �'. ,�� h :,/ Final Review of a Site Development Plan Checklist for Completeness collated copies pl(, tTPX--- j ❑ 1 set t of color/material samples f� A. Written description of the proposal re�los� O"Written description of the proposal. P \6- ` L❑Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. Svi B. Site plan showing the following (drawn to the scale of 1"=20', clearly legible and folded): �ocation(s) of proposed building(s) on the site. /❑ Location of proposed parking, travelways, walkways and other improvements. Mechanical equipment, trash containers, loading and service areas, other similar features and improvements, and associated screening. • Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient off-site topography to describe prominent and pertinent off-site features and physical characteristics, but in no case less than 50-feet outside of the site. Location and size of existing and proposed utilities and easements. Identify type of utility and extent of easement. Stormwater management plan. ❑ Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed materials, with material and color samples. bp.--S� ee t number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. For revised drawings, clearly identify revisions made. C. Landscape plan showing the following (drawn to the scale of 1"=20'or larger,clearly legible and folded): roposed landscapingtharmeets or exceeds--tlh requirements outlined in the ARB guidelines. a, ' ttlf Existing landscaping to be removed. Include the location, size, and species. ‘72€- A4- ,/ =L ndscape key including all landscape symbols and a description of what they represent. ''.i//, 1i0' Location of existing and proposed tree lines and tree save areas. 1(� L�Location of existing natural features. c-,, ❑ cation of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by tanical name and caliper. ..,j:2--Cocation and height of above-ground utilities and associated easements, and location of below- ground utilities and associated easements. LEI—Stormwater facilities. Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans. Include tree protection fencing and limits of work on the landscape, grading and E&S plans. i • OVER—> D. Lighting plan showing-the f� ollowing (drawn to the scale of 1"=20'or larger,clearly legible and folded):r ❑ Location of a I- oposed building and site lighting. El Lightin chedule identifying all proposed light fixtures, poles and brackets. ❑ Ma ufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type, /irp , v,),/ intensity, style, shielding, color, finish, and installation height. Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of 1 Section 4.17 of the Zoning Ordinance. El Coordination of lighting with landscaping and other site elements. E. Appearance of the building(s) (architectural elevations, color perspective sketches,site sections): ❑ Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the scale of 1/8�=1 0". Include a building materials schedule and key on the elevation drawings. firgiV\ 1, Submittal o elevations that are not visible from the Entrance Corridor may be required to clarify the ��fw oal(building design. i` El Color perspective sketches that show the proposed development as seen from the Entrance Corridor. ^ 1 p © Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed \ V? development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and roof height(s) relative to the natural elevations along the Entrance Corridor. ❑ One set of all building materials/colors. El A floor plan adequate to show exterior walls, windows and doors. 1_ F. Additional material p({�lo� Provide labeled, color, 8-Y2" x 11" photographs of the site as seen from both directions on the ���"s" E trance Corridor. Signatures 2 ` OVER—