Loading...
HomeMy WebLinkAboutSDP201800050 Correspondence 2019-06-07From: Cameron Langille Sent: Friday, June 07, 2019 9:43 AM To: Ryan Yauger Subject: FW: Brookhill Block 4 Apartments - Final Site Plan and WPO Attachments: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Approval From: Cameron Langille Sent: Tuesday, January 22, 2019 2:04 PM To: Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com; Emily Cox <ecox@albemarle.org> Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Brandy, The Block 4 final site plan was signed and approved back in December. I sent an email on 12/17 stating that it was ready for pick up at the front desk of my office. I believe Ryan sent someone from Bohler to pick it up because it was gone within a day. It's possible someone from Alan Taylor's office picked it up. In regard to the WPO, it was also approved but I'm not sure whether hard copies get returned directly to the applicant. I've CC'd Emily Cox from Engineering and she can confirm. -Cameron From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator BOHLER F. N G i N F. F R i N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Brandy Booker <bbooker@bohlereng.com> Sent: Tuesday, January 22, 2019 3:15 PM To: Emily Cox Cc: v152000@nf.bohlereng.com; Cameron Langille Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Thanks Emily! The link is timing out so I'm going to send to my IT department to see if they can open it. Brandy Booker, Notary Public 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox <ecox@albemarle.org> Sent: Tuesday, January 22, 2019 2:33 PM To: Brandy Booker <bbooker@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO You can also see it here: http://www.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD- Plannine%5d:%5bApplicationNumber%5d=%22WPO201800051%22%7d Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 �* 'Al Lit IMA� 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Brandy Booker <bbooker@bohlereng.com> Sent: Tuesday, January 22, 2019 2:31 PM To: Emily Cox <ecox@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Understood —thank you both for responding. Have a great day! Brandy Booker, Notary Public 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox <ecox@albemarle.org> Sent: Tuesday, January 22, 2019 2:07 PM To: Cameron Langille <blangille@albemarle.org>; Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Typically, a hard copy of the approved WPO is given during the pre -construction meeting. However, if 4 copies were provided at time of plan approval, we can certainly leave one at the front desk for the owner if necessary. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 �* 'Al Lit 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.ore From: Cameron Langille Sent: Tuesday, January 22, 2019 2:04 PM To: Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com; Emily Cox <ecox@albemarle.org> Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Brandy, The Block 4 final site plan was signed and approved back in December. I sent an email on 12/17 stating that it was ready for pick up at the front desk of my office. I believe Ryan sent someone from Bohler to pick it up because it was gone within a day. It's possible someone from Alan Taylor's office picked it up. In regard to the WPO, it was also approved but I'm not sure whether hard copies get returned directly to the applicant. I've CC'd Emily Cox from Engineering and she can confirm. -Cameron From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator Ot BOHLER F. N G I N F. F. R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P:540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox Sent: Tuesday, January 22, 2019 2:33 PM To: Brandy Booker; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO You can also see it here: http://www.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD- Planning%5d:%SbApplicationNumber%5d=%22WPO201800051%22%7d Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Brandy Booker <bbooker@bohlereng.com> Sent: Tuesday, January 22, 2019 2:31 PM To: Emily Cox <ecox@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Understood —thank you both for responding. Have a great day! Brandy Booker, Notary Public 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox <ecox@albemarle.org> Sent: Tuesday, January 22, 2019 2:07 PM To: Cameron Langille <blangille@albemarle.org>; Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Typically, a hard copy of the approved WPO is given during the pre -construction meeting. However, if 4 copies were provided at time of plan approval, we can certainly leave one at the front desk for the owner if necessary. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.orE From: Cameron Langille Sent: Tuesday, January 22, 2019 2:04 PM To: Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com; Emily Cox <ecox@albemarle.org> Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Brandy, The Block 4 final site plan was signed and approved back in December. I sent an email on 12/17 stating that it was ready for pick up at the front desk of my office. I believe Ryan sent someone from Bohler to pick it up because it was gone within a day. It's possible someone from Alan Taylor's office picked it up. In regard to the WPO, it was also approved but I'm not sure whether hard copies get returned directly to the applicant. I've CC'd Emily Cox from Engineering and she can confirm. -Cameron From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator BOHLER F N G I F. F R i N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Brandy Booker <bbooker@bohlereng.com> Sent: Tuesday, January 22, 2019 2:31 PM To: Emily Cox; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Understood —thank you both for responding. Have a great day! Brandy Booker, Notary Public 28 Blackwell Park Lane, Suite 2011 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox <ecox@albemarle.org> Sent: Tuesday, January 22, 2019 2:07 PM To: Cameron Langille <blangille@albemarle.org>; Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Typically, a hard copy of the approved WPO is given during the pre -construction meeting. However, if 4 copies were provided at time of plan approval, we can certainly leave one at the front desk for the owner if necessary. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 'Al 0 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Tuesday, January 22, 2019 2:04 PM To: Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com; Emily Cox <ecox@albemarle.org> Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Brandy, The Block 4 final site plan was signed and approved back in December. I sent an email on 12/17 stating that it was ready for pick up at the front desk of my office. I believe Ryan sent someone from Bohler to pick it up because it was gone within a day. It's possible someone from Alan Taylor's office picked it up. In regard to the WPO, it was also approved but I'm not sure whether hard copies get returned directly to the applicant. I've CC'd Emily Cox from Engineering and she can confirm. -Cameron From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator BOHLER F. N G 1 1 F. F. R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox Sent: Tuesday, January 22, 2019 2:07 PM To: Cameron Langille; Brandy Booker Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Typically, a hard copy of the approved WPO is given during the pre -construction meeting. However, if 4 copies were provided at time of plan approval, we can certainly leave one at the front desk for the owner if necessary. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Tuesday, January 22, 2019 2:04 PM To: Brandy Booker <bbooker@bohlereng.com> Cc: v152000@nf.bohlereng.com; Emily Cox <ecox@albemarle.org> Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Brandy, The Block 4 final site plan was signed and approved back in December. I sent an email on 12/17 stating that it was ready for pick up at the front desk of my office. I believe Ryan sent someone from Bohler to pick it up because it was gone within a day. It's possible someone from Alan Taylor's office picked it up. In regard to the WPO, it was also approved but I'm not sure whether hard copies get returned directly to the applicant. I've CC'd Emily Cox from Engineering and she can confirm. -Cameron From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator BOHLER F N (: I N F. F R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Cameron Langille Sent: Tuesday, January 22, 2019 2:04 PM To: Brandy Booker Cc: v152000@nf.bohlereng.com; Emily Cox Subject: RE: Brookhill Block 4 Apartments - Final Site Plan and WPO Attachments: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Approval Hi Brandy, The Block 4 final site plan was signed and approved back in December. I sent an email on 12/17 stating that it was ready for pick up at the front desk of my office. I believe Ryan sent someone from Bohler to pick it up because it was gone within a day. It's possible someone from Alan Taylor's office picked it up. In regard to the WPO, it was also approved but I'm not sure whether hard copies get returned directly to the applicant. I've CC'd Emily Cox from Engineering and she can confirm. -Cameron From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator BOHLER F N C: I F. F R i iN ( 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 I bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Brandy Booker <bbooker@bohlereng.com> Sent: Monday, January 21, 2019 12:28 PM To: Cameron Langille Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Apartments - Final Site Plan and WPO Hi Cameron! Can you let me know if the approved plans for the FSP and WPO of the apartment block are at the county ready to be picked up? Thank you! Brandy Booker, Notary Public I Project Coordinator BOHLER F N G I N F. F. R I N( 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Cameron Langille Sent: Tuesday, January 08, 2019 3:38 PM To: Alan Taylor Subject: RE: Brookhill Bonding Hi Alan, I spoke with Rebecca earlier and she is satisfied that the road is now under construction based on Ashlee's photos from her site visit last Friday. Rebecca is going to contact Geoff Elsie in Engineering and have him update our system saying that Engineering has signed off on the building permit. Then Rebecca will be able to approve it for Zoning, and Inspections can actually issue their approval. Rebecca will be contacting you directly in another email to explain all of this. Let me know if you have any questions! -Cameron From: Alan Taylor <alan@riverbenddev.com> Sent: Tuesday, January 08, 2019 8:02 AM To: Cameron Langille <blangille@albemarle.org> Subject: Brookhill Bonding Hey Cameron, I got all of the bonds over to Ana yesterday, she has approved them as to form. I think this is the last thing that was hanging out there for the permits to be issued. I have pinged Rebecca a few times on verifying that construction has started on Stella, but I haven't heard anything. To my knowledge, that's the only thing that is hanging out there. Would you mind pushing her a little bit, so we can get this over the finish line? Thanks for all the help on this one! -alan From: Ana Kilmer Sent: Tuesday, January 08, 2019 12:28 PM To: Alan Taylor; Joe Simpson; Robby Saady (RBD); Ryan Yauger Cc: Frank Pohl; Emily Cox; Carla Harris - CDD; Kenny Thacker; Jonney Otto; Geoff Elsie; Cameron Langille; Rebecca Ragsdale; Ashlee Henshaw; Michael Dellinger; Eileen Wittwer; Jeffrey Baker Subject: Brookhill Bonds Information - Important Alan: The following bonds have been posted and approved: 1. Water Protection Performance bond - WPO-2018-00051 — Brookhill Blocks 4A and 4B Apartments VSMP Plan - $465,470. a. Nutrient Credit Agreement approved 12/21/2018. 2. Water Protection Performance Bond - WPO-2018-00013 — Brookhill State Route 643, Stella Lane and Archer Avenue VSMP - $150,520. a. Nutrient Credit Agreement approved 12/21/2018. b. Stormwater agreement recorded 11/2/2018. 3. Subdivision / Road Performance Bond — Brookhill Road Improvements Plan for State Route 643 Polo Grounds Road Stella Lane and Archer Avenue — Water and Sewer - $907,000. 4. Subdivision / Road Performance Bond — Brookhill Road Improvements Plan for State Route 643 Polo Grounds Road Stella Lane and Archer Avenue — Roads - $2,938,250. Thank you Ana D. Kilmer Management Analyst II Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org From: Alan Taylor <alan@riverbenddev.com> Sent: Tuesday, January 08, 2019 8:02 AM To: Cameron Langille Subject: Brookhill Bonding Hey Cameron, I got all of the bonds over to Ana yesterday, she has approved them as to form. I think this is the last thing that was hanging out there for the permits to be issued. I have pinged Rebecca a few times on verifying that construction has started on Stella, but I haven't heard anything. To my knowledge, that's the only thing that is hanging out there. Would you mind pushing her a little bit, so we can get this over the finish line? Thanks for all the help on this one! -alan From: Ryan Yauger <ryauger@bohlereng.com> Sent: Monday, December 17, 2018 5:39 PM To: Cameron Langille; Brandy Booker; Alan Taylor (alan@riverbenddev.com); Kris Winters; Ashley Davies Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Approval Thank you, Cameron! From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, December 17, 2018 5:29 PM To: Ryan Yauger <ryauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com>; Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com>; Kris Winters <Kwinters@roudabush.com>; Ashley Davies <ashley@riverbenddev.com> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan - Approval Good Evening, The final site plan for Brookhill Block 4 (Blocks 4A and 4B) has been signed and approved and is ready for pick-up. One copy is downstairs at the front desk of the CDD office. Please let me know if you have any questions! Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Monday, December 17, 2018 10:10 AM To: Cameron Langille Subject: RE: Brookhill Apartments Thank you Cameron, appreciate the update. I just sent another email to the team, requesting they get you this information. Thank you for your continued help! Ryan From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, December 17, 2018 9:45 AM To: Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Apartments Hi Ryan, I had not heard anything from MK since Thursday afternoon. I know they said they were picking the plat and easement deeds up from our office before we closed on Thursday. However, I haven't heard anything else since then. I am ready to sign the site plans as soon as someone provides me with the instrument numbers for the recorded plat and deeds. If you could have that information, please forward it to me. Copies of the recorded instruments with receipt numbers would be best, sometimes the Clerk's online system takes a week or so to actually for newly recorded documents to actually be searchable and viewable through their online portal that I have access to. Thanks, Cameron From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, December 14, 2018 3:33 PM To: Cameron Langille <blangille@albemarle.org> Subject: Brookhill Apartments Hey Cameron, I apologize if you've been working directly with Alan and MK today, and have already have this under control. It's my understanding that everything is recorded now, so do you have everything back in your possession to sign the plans? Let me know, Thank you! Ryan Yauger, P.E. I Project Manager BOHLER F N G i\ 1• F R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Cameron Langille Sent: Monday, December 17, 2018 9:45 AM To: Ryan Yauger Subject: RE: Brookhill Apartments Hi Ryan, I had not heard anything from MK since Thursday afternoon. I know they said they were picking the plat and easement deeds up from our office before we closed on Thursday. However, I haven't heard anything else since then. I am ready to sign the site plans as soon as someone provides me with the instrument numbers for the recorded plat and deeds. If you could have that information, please forward it to me. Copies of the recorded instruments with receipt numbers would be best, sometimes the Clerk's online system takes a week or so to actually for newly recorded documents to actually be searchable and viewable through their online portal that I have access to. Thanks, Cameron From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, December 14, 2018 3:33 PM To: Cameron Langille <blangille@albemarle.org> Subject: Brookhill Apartments Hey Cameron, I apologize if you've been working directly with Alan and MK today, and have already have this under control. It's my understanding that everything is recorded now, so do you have everything back in your possession to sign the plans? Let me know, Thank you! Ryan Yauger, P.E. I Project Manager BOHLER F. N G i 1 F. F R i N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, December 14, 2018 3:33 PM To: Cameron Langille Subject: Brookhill Apartments Hey Cameron, I apologize if you've been working directly with Alan and MK today, and have already have this under control. It's my understanding that everything is recorded now, so do you have everything back in your possession to sign the plans? Let me know, Thank you! Ryan Yauger, P.E. I Project Manager Of BOHLER F. N(: I F. F R I K G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Monday, November 19, 2018 11:59 AM To: Buck Smith Cc: Michael Gove; Cameron Langille; v152000@nf.bohlereng.com Subject: FW: Site Plan for Brookhill Apts, Charlottesville Va Importance: High Good Morning Buck, Pat Fitch forwarded your email to me in regards to the Brookhill Building Plans, and I just wanted to give you an update as to where we stood. Per our latest bi-weekly Brookhill meeting, and direction from Mark Graham (via Cameron Langille), the building plans were able to be submitted in as long as the site plan was approvable, prior to obtaining final signatures. I've copied Cameron on here to confirm. As such, the hard copies of the site plan were submitted this past Friday, and are at the front desk awaiting everyone's signature. This will be the plan that the building plans reference. If you need an extra copy of this plan in order to process it through, let me know, and I'll get one over to you so that we can start the building permit process. Let me know if you have any questions, feel free to give me a call. Thank you! Ryan Yauger, P.E. I Project Manager BOHLER E N G I T\ E E R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Buck Smith [maiIto: osmith(cbalbemarle.org] Sent: Wednesday, November 14, 2018 4:25 PM To: Pat Fitch Subject: Re: Site Plan for Brookhill Apts, Charlottesville Va Pat, We have received the plans and applications for the new Brookhill Apartments. I do not see a copy of the recorded site plan in the application, and we will require it for the review. If you can send a complete copy of the recorded site plan I can get the permits rolling. I will follow up with the fees Yours, Buck Smith Intake/Support Specialist II Community Development OGI Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 4504 From: Heather McMahon Sent: Monday, November 19, 2018 10:09 AM To: Cameron Langille Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan Done. From: Cameron Langille Sent: Friday, November 16, 2018 5:52 PM To: Frank Pohl <fpohl@albemarle.org>; Adam Moore <Adam.Moore @vdot.virginia.gov>; Shawn Maddox <smaddox@albemarle.org>; Alex Morrison<amorrison@serviceauthority.org>; Heather McMahon <hmcmahon@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan Good Evening, The final site plan for Block 4 of Brookhill is ready for final signatures and approval. Four copies of the plans are on the counter outside of Conference Room B on the first floor of the Community Development Department. Please sign the signature line on each Cover Sheet by 5 PM on Tuesday, November 27th. Please let me know if you have any additional questions. Thank you, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Emily Cox Sent: Sunday, November 18, 2018 7:52 PM To: Cameron Langille; Ryan Yauger Subject: RE: Brookhill block 4 Yes, I agree. It's been interesting navigating the Brookhill Code of Development with the Albemarle County Code and the DEQ stormwater stuff. I think everyone has done a great job. I look forward to continuing with the rest of the development. Sorry I was MIA on Friday afternoon, but I assume Frank signed the site plan for the engineers. Hope everyone had a good weekend! And, we'll see who is celebrating on Friday evening 0 Go Hoos! Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org -----Original Message ----- From: Cameron Langille Sent: Friday, November 16, 2018 3:48 PM To: Ryan Yauger <ryauger@bohlereng.com> Cc: Emily Cox <ecox@albemarle.org> Subject: RE: Brookhill block 4 You're very welcome, Ryan. I believe I speak for both Emily and I when I saw that we enjoy working on the Brookhill project very much. I know it hasn't been as quick of an approval as originally hoped, but we're almost at the finish line! -----Original Message ----- From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, November 16, 2018 3:43 PM To: Cameron Langille <blangille@albemarle.org> Cc: Emily Cox <ecox@albemarle.org> Subject: Re: Brookhill block 4 Thank you both as well for all of your help today! It's much appreciated and honestly couldn't do it without you. Have a good weekend! Sent from my !Phone > On Nov 16, 2018, at 3:40 PM, Cameron Langille <blangille@albemarle.org> wrote: > Thanks Ryan! > -----Original Message ----- > From: Ryan Yauger <ryauger@bohlereng.com> > Sent: Friday, November 16, 2018 3:02 PM > To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> > Subject: Brookhill block 4 > Plans are at the front desk. > Thanks! > Sent from my Whone From: bbooker@bohlereng.com Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Attachments: - f IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - Final Site Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER F. N G II N I. F K I n (: 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 70,255 Section 1 Block 4A and PM KB 4B.pdf 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission.pdf 180615 Checklist - PDF File 6/22/2018 4:29 264 Completed.pdf PM KB 180615 PDF File 6/22/2018 4:31 226 Site Plan Application.pdf PM KB From: Shawn Maddox Sent: Sunday, November 18, 2018 3:18 PM To: Cameron Langille Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan Signed. From: Cameron Langille Sent: Friday, November 16, 2018 5:52 PM To: Frank Pohl <fpohl@albemarle.org>; Adam Moore <Adam.Moore @vdot.virginia.gov>; Shawn Maddox <smaddox@albemarle.org>; Alex Morrison<amorrison@serviceauthority.org>; Heather McMahon <hmcmahon@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan Good Evening, The final site plan for Block 4 of Brookhill is ready for final signatures and approval. Four copies of the plans are on the counter outside of Conference Room B on the first floor of the Community Development Department. Please sign the signature line on each Cover Sheet by 5 PM on Tuesday, November 27th. Please let me know if you have any additional questions. Thank you, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, November 16, 2018 6:34 PM To: Cameron Langille; Brandy Booker Subject: RE: SDP2018000049 - Brookhill Block 3A Final Site Plan - 2nd Review Comments Thank you, Cameron! From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Friday, November 16, 2018 6:14 PM To: Ryan Yauger <ryauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Subject: SDP2018000049 - Brookhill Block 3A Final Site Plan - 2nd Review Comments Good Evening Ryan and Brandy, Attached are the second review comments for SDP201800049. ACSA has not yet completed their review. Please let me know if you have any questions! Have a great weekend, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Cameron Langille Sent: Friday, November 16, 2018 5:52 PM To: Frank Pohl; Adam Moore; Shawn Maddox; Alex Morrison; Heather McMahon; Michael Dellinger Subject: SDP201800050 - Brookhill Block 4 Final Site Plan Good Evening, The final site plan for Block 4 of Brookhill is ready for final signatures and approval. Four copies of the plans are on the counter outside of Conference Room B on the first floor of the Community Development Department. Please sign the signature line on each Cover Sheet by 5 PM on Tuesday, November 27th. Please let me know if you have any additional questions. Thank you, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, November 16, 2018 3:43 PM To: Cameron Langille Cc: Emily Cox Subject: Re: Brookhill block 4 Thank you both as well for all of your help today! It's much appreciated and honestly couldn't do it without you. Have a good weekend! Sent from my !Phone > On Nov 16, 2018, at 3:40 PM, Cameron Langille <blangille@albemarle.org> wrote: > Thanks Ryan! > -----Original Message ----- > From: Ryan Yauger <ryauger@bohlereng.com> > Sent: Friday, November 16, 2018 3:02 PM > To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> > Subject: Brookhill block 4 > Plans are at the front desk. > Thanks! > Sent from my iPhone From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, November 16, 2018 3:02 PM To: Cameron Langille; Emily Cox Subject: Brookhill block 4 Plans are at the front desk. Thanks! Sent from my Whone From: Ryan Yauger <ryauger@bohlereng.com> Sent: Friday, November 16, 2018 11:21 AM To: Emily Cox Cc: Kris Winters; Cameron Langille Subject: Re: Planning Application Review for WPO201800013 BROOKHILL VSMP FOR ROAD IMPORVEMENT PLAN. Thank you! Sent from my iPhone On Nov 16, 2018, at 11:16 AM, Emily Cox <ecox@albemarle.org> wrote: The deed book and pages for the SWM agreements are: 2 Agreements were recorded in deed book 05110, page 0279 and 05110, page 0289. From: Emily Cox Sent: Friday, November 16, 2018 11:16 AM To: Ryan Yauger; Kris Winters Cc: Cameron Langille Subject: Planning Application Review for WPO201800013 BROOKHILL VSMP FOR ROAD IMPORVEMENT PLAN. The deed book and pages for the SWM agreements are: 2 Agreements were recorded in deed book 05110, page 0279 and 05110, page 0289. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Thursday, November 15, 2018 12:24 PM To: Cameron Langille Cc: v152000@nf.bohlereng.com Subject: Brookhill Block 4 Open Space - Revised Sheets Attachments: f Hey Cameron, Here are the revised sheets based on your comments. Thanks! Ryan Yauger, P.E. I Project Manager BOHLER F N G I N F. F. R I N( 28 Blackwell Park Lane, Suite 2011 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Thursday, October 25, 2018 2:38 PM To: Deel, Justin Cc: Cameron Langille; Adam Moore Subject: Re: SDP201800050 Brookhill Blocks 4A & 4B FSP 10-25-18 Thank you Justin! Sent from my Whone On Oct 25, 2018, at 2:27 PM, Deel, Justin <iustin.deel@vdot.virginia.gov> wrote: Cameron, Attached is our approval letter for SDP201800050 Brookhill Blocks 4A & 4B FSP 10-25-18. Justin Justin Deel, P.E. VDOT - Charlottesville 434-422-9894 540-717-1408 (c) <SDP201800050 Brookhill Blocks 4A & 4B FSP 10-25-18.pdf> From: Deel, Justin <justin.deel@vdot.virginia.gov> Sent: Thursday, October 25, 2018 2:26 PM To: Cameron Langille Cc: Ryan Yauger; Adam Moore Subject: SDP201800050 Brookhill Blocks 4A & 4B FSP 10-25-18 Cameron, Attached is our approval letter for SDP201800050 Brookhill Blocks 4A & 4B FSP 10- 25-18. Justin Justin Deel, P.E. VDOT - Charlottesville 434-422-9894 540-717-1408 (c) From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, October 23, 2018 10:24 AM To: Cameron Langille Cc: v152000@nf.bohlereng.com Subject: Revised Brookhill Apartment Sheets Attachments: f Hey Cameron, We are still waiting on the BLA to be resubmitted, and I was told it would be finalized today and resubmitted on Wednesday by the latest. In the meantime, here are the revised sheets for your latest comments. If these are good to go, then we will hold tight until the BLA is recorded, and then we will proceed with hard copies of the plans in for signature showing the recordation information on the plans and these slips sheets rectified as well. Thanks! Ryan Yauger, P.E. BOHLER F. N G I 1 F. F. R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Alan Taylor <alan@riverbenddev.com> Sent: Monday, October 22, 2018 3:19 PM To: Alex Morrison Cc: Cameron Langille; Ryan Yauger; dreardon@bohlereng.com; Richard Nelson Subject: Re: SDP201800050: Brookhill Final Site Plan Block 4A and 4B Apartments Thanks, Alex- we are looking forward to getting to work out there. Hope y'all had a good weekend. - alan < mobile > On Oct 22, 2018, at 2:11 PM, Alexander Morrison<amorrison@serviceauthority.org> wrote: Cameron, I have approved the water/sewer utility plans and hereby recommend approval of SDP201800050. I have copied the Engineer and Developer so they are aware I am recommending approval. Let Richard know when signature sets are ready at the county. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 0 <image001.png> <image003.jpg> From: Alexander Morrison<amorrison@serviceauthority.org> Sent: Monday, October 22, 2018 3:11 PM To: Cameron Langille Cc: Ryan Yauger; dreardon@bohlereng.com; Alan Taylor; Richard Nelson Subject: SDP201800050: Brookhill Final Site Plan Block 4A and 4B Apartments Cameron, I have approved the water/sewer utility plans and hereby recommend approval of SDP201800050. 1 have copied the Engineer and Developer so they are aware I am recommending approval. Let Richard know when signature sets are ready at the county. Alexander J. Morrison, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (0) 434-977-4511 Ext. 116 (C) 434-981-5577 (F) 434-979-0698 From: Emily Cox Sent: Friday, October 19, 2018 11:23 AM To: Lisa Green; Cameron Langille; Ryan Yauger; Frank Pohl Subject: Brookhill landscaping outside of right-of-way Lisa - I spoke with Frank. You are correct - we will only bond landscaping within the right-of-way. Once the road plan is approved, we will ensure that you get a copy so you can inspect. If you would like it to be bonded, that would be a separate bond (as this buffer is required by the code of development). The bond can be posted the same time as the road bond, but it should have its own, separate estimate. I can get you a copy of the road plan as it stands today, but it is not approved yet. Let us know if you have any questions. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 g,o 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Emily Cox Sent: Friday, October 19, 2018 8:28 AM To: Cameron Langille Cc: Jonney Otto Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4. Just cleaning up my emails. I believe we already discussed this. They show tree protection on the E&S plan, so they should be good. This is something we will want to tell the inspector, jonney otto, just so he is aware. I copied him on this email, and I can show him once the plans are approved. I don't know if zoning should be made aware as well? Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Tuesday, September 25, 2018 6:23 PM To: Emily Cox <ecox@albemarle.org> Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4 Thanks for sending me these! Can you let me know if the Block 4 WPO plans show tree protection fencing along the boundary of the 100' buffer adjacent to Route 29, as well as fencing between the greenway boundary (north side of Block 4B) and the improvements in Block 413? The COD requires them to identify existing trees with calipers greater than 18" in both of those areas. They're technically supposed to shown them on the existing conditions, grading, and landscape plans for the final site plan. I made several comments on the Block 4 final site plan asking them to identify those tree locations within the buffer and greenway, and Ryan replied that they are putting up protection fencing along the boundaries of the buffer and greenway in order to protect the existing landscaping. If the fencing is shown on the WPO, then I am going to say that my comments have been addressed and they don't need to show it all on the final site plan. From: Emily Cox Sent: Thursday, September 20, 2018 4:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: Planning Application Review for SDP201800050 Brookhill Block 4. I did not upload to countyview, in case you have any questions or additional comments regarding engineering. Thanks! The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 09/20/2018 This email was sent from County View Production. From: Emily Cox Sent: Thursday, October 18, 2018 5:12 PM To: Cameron Langille; Ryan Yauger Subject: Planning Application Review for SDP201800050 Brookhill Block 4 Attachments: KDP2019000SO Brookbill Block 4 apartments - final Rpv2.d c Ryan - See attached. Also, please provide 2 additional copies of the retaining wall designs. The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 10/18/2018 This email was sent from County View Production. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Thursday, October 18, 2018 8:27 AM To: Emily Cox; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Also, the wall will be a fill wall, so the geogrid will go 6' back from the wall towards the apartments. From: Ryan Yauger Sent: Thursday, October 18, 2018 8:26 AM To: Emily Cox <ecox@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Thank you, Emily. Please send them over when you have them completed, and a call will work well if you have time. I plan to get started and get them knocked out once we receive them. I'll stay tuned. Thanks! Ryan From: Emily Cox [mailto:ecox@albemarle.org] Sent: Thursday, October 18, 2018 8:23 AM To: Ryan Yauger <rvauger@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I will have more comments. I am trying to finish my review and get comments to you today. We can meet or have a phone call to discuss once complete. As far as those PDFs, the silt fence is shown in front of the wall .... it will need to be on the outside perimeter, and everything will need to be outside of the preserved slopes. Is there a geogrid or any tiebacks for the wall? If so, which direction do they go? Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Ryan Yauger <rvauger@bohlereng.com> Sent: Wednesday, October 17, 2018 12:07 PM To: Emily Cox <ecox@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Hey Emily, Thank you for pointing that out. I have included revised sheets attached to this email that show this being revised. We can provide a revised hardcopy for approval if this is the only concern, if not we will wait until you have completed your backcheck of the comment responses to ensure we have everything. Also, just so both of you are aware, I was told that the easement plat for the apartments was submitted on Monday. So if you haven't already picked it up, it should be at the front desk for your attention. Thanks! Ryan From: Emily Cox [mailto:ecox@albemarle.org] Sent: Tuesday, October 16, 2018 4:44 PM To: Ryan Yauger <rvauger@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I have just started my review of the WPO, but wanted to let you know that the retaining wall is not shown and there is still grading shown in the preserved slopes. So that is one thing that will need to be revised. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.ore From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, October 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Check in Hey guys, Just checking in. If you're seeing anything that needs my attention prior to Friday (Road Plans, Apartments, WPOs , etc) , please let me know and I'll hop right on it. Would love to still have the "signing party" during our regular meeting if possible. As it stands right now, I plan to bring revised sets for the Polo Grounds Road Plans as well as the Apartments on Thursday of this week to reflect Heather's minor comments being revised. If anything needs to be tweaked from your end, it will be incorporated as well. I will also be bringing the $269 fee check for the road plans as well. Thanks! Ryan Yauger, P.E. BOHLER F. N G i N F. F R i N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Thursday, October 18, 2018 8:26 AM To: Emily Cox; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Thank you, Emily. Please send them over when you have them completed, and a call will work well if you have time. I plan to get started and get them knocked out once we receive them. I'll stay tuned. Thanks! Ryan From: Emily Cox [mailto:ecox@albemarle.org] Sent: Thursday, October 18, 2018 8:23 AM To: Ryan Yauger <ryauger@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I will have more comments. I am trying to finish my review and get comments to you today. We can meet or have a phone call to discuss once complete. As far as those PDFs, the silt fence is shown in front of the wall .... it will need to be on the outside perimeter, and everything will need to be outside of the preserved slopes. Is there a geogrid or any tiebacks for the wall? If so, which direction do they go? Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 8�3 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.orE From: Ryan Yauger <ryauger@bohlereng.com> Sent: Wednesday, October 17, 2018 12:07 PM To: Emily Cox <ecox@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Hey Emily, Thank you for pointing that out. I have included revised sheets attached to this email that show this being revised. We can provide a revised hardcopy for approval if this is the only concern, if not we will wait until you have completed your backcheck of the comment responses to ensure we have everything. Also, just so both of you are aware, I was told that the easement plat for the apartments was submitted on Monday. So if you haven't already picked it up, it should be at the front desk for your attention. Thanks! Ryan From: Emily Cox [mailto:ecox@albemarle.org] Sent: Tuesday, October 16, 2018 4:44 PM To: Ryan Yauger <ryauger@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I have just started my review of the WPO, but wanted to let you know that the retaining wall is not shown and there is still grading shown in the preserved slopes. So that is one thing that will need to be revised. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.ora From: Ryan Yauger <rvauger@bohlereng.com> Sent: Tuesday, October 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Check in Hey guys, Just checking in. If you're seeing anything that needs my attention prior to Friday (Road Plans, Apartments, WPOs , etc) , please let me know and I'll hop right on it. Would love to still have the "signing party" during our regular meeting if possible. As it stands right now, I plan to bring revised sets for the Polo Grounds Road Plans as well as the Apartments on Thursday of this week to reflect Heather's minor comments being revised. If anything needs to be tweaked from your end, it will be incorporated as well. I will also be bringing the $269 fee check for the road plans as well. Thanks! Ryan Yauger, P.E. BOHLER E. N G I E E. R I lei G 28 Blackwell Park Lane, Suite 2011 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox Sent: Thursday, October 18, 2018 8:23 AM To: Ryan Yauger; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I will have more comments. I am trying to finish my review and get comments to you today. We can meet or have a phone call to discuss once complete. As far as those PDFs, the silt fence is shown in front of the wall .... it will need to be on the outside perimeter, and everything will need to be outside of the preserved slopes. Is there a geogrid or any tiebacks for the wall? If so, which direction do they go? Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 'Al 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Wednesday, October 17, 2018 12:07 PM To: Emily Cox <ecox@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Hey Emily, Thank you for pointing that out. I have included revised sheets attached to this email that show this being revised. We can provide a revised hardcopy for approval if this is the only concern, if not we will wait until you have completed your backcheck of the comment responses to ensure we have everything. Also, just so both of you are aware, I was told that the easement plat for the apartments was submitted on Monday. So if you haven't already picked it up, it should be at the front desk for your attention. Thanks! Ryan From: Emily Cox [mailto:ecox@albemarle.org] Sent: Tuesday, October 16, 2018 4:44 PM To: Ryan Yauger <ryauger@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I have just started my review of the WPO, but wanted to let you know that the retaining wall is not shown and there is still grading shown in the preserved slopes. So that is one thing that will need to be revised. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, October 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Check in Hey guys, Just checking in. If you're seeing anything that needs my attention prior to Friday (Road Plans, Apartments, WPOs , etc) , please let me know and I'll hop right on it. Would love to still have the "signing party" during our regular meeting if possible. As it stands right now, I plan to bring revised sets for the Polo Grounds Road Plans as well as the Apartments on Thursday of this week to reflect Heather's minor comments being revised. If anything needs to be tweaked from your end, it will be incorporated as well. I will also be bringing the $269 fee check for the road plans as well. Thanks! Ryan Yauger, P.E. BOHLER F N G i\ F r R r n r 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Wednesday, October 17, 2018 12:07 PM To: Emily Cox; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Attachments: f Hey Emily, Thank you for pointing that out. I have included revised sheets attached to this email that show this being revised. We can provide a revised hardcopy for approval if this is the only concern, if not we will wait until you have completed your backcheck of the comment responses to ensure we have everything. Also, just so both of you are aware, I was told that the easement plat for the apartments was submitted on Monday. So if you haven't already picked it up, it should be at the front desk for your attention. Thanks! Ryan From: Emily Cox [mailto:ecox@albemarle.org] Sent: Tuesday, October 16, 2018 4:44 PM To: Ryan Yauger <ryauger@bohlereng.com>; Cameron Langille <blangille@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I have just started my review of the WPO, but wanted to let you know that the retaining wall is not shown and there is still grading shown in the preserved slopes. So that is one thing that will need to be revised. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.orE From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, October 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Check in Hey guys, Just checking in. If you're seeing anything that needs my attention prior to Friday (Road Plans, Apartments, WPOs , etc) , please let me know and I'll hop right on it. Would love to still have the "signing party" during our regular meeting if possible. As it stands right now, I plan to bring revised sets for the Polo Grounds Road Plans as well as the Apartments on Thursday of this week to reflect Heather's minor comments being revised. If anything needs to be tweaked from your end, it will be incorporated as well. I will also be bringing the $269 fee check for the road plans as well. Thanks! Ryan Yauger, P.E. BOHLER F N G 1\ F F R i K G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox Sent: Tuesday, October 16, 2018 4:44 PM To: Ryan Yauger; Cameron Langille Cc: v152000@nf.bohlereng.com Subject: RE: Brookhill Check in Ryan - I have just started my review of the WPO, but wanted to let you know that the retaining wall is not shown and there is still grading shown in the preserved slopes. So that is one thing that will need to be revised. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, October 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org>; Emily Cox <ecox@albemarle.org> Cc: v152000@nf.bohlereng.com Subject: Brookhill Check in Hey guys, Just checking in. If you're seeing anything that needs my attention prior to Friday (Road Plans, Apartments, WPOs , etc) , please let me know and I'll hop right on it. Would love to still have the "signing party" during our regular meeting if possible. As it stands right now, I plan to bring revised sets for the Polo Grounds Road Plans as well as the Apartments on Thursday of this week to reflect Heather's minor comments being revised. If anything needs to be tweaked from your end, it will be incorporated as well. I will also be bringing the $269 fee check for the road plans as well. Thanks! Ryan Yauger, P.E. BOHLER F N G i\ F r R r n r 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Michael Dellinger Sent: Tuesday, October 16, 2018 12:54 PM To: Cameron Langille Subject: FW: Brookhill Plans FYI Michael From: Keith Huckstep Sent: Tuesday, October 16, 2018 11:51 AM To: Ryan Yauger <ryauger@bohlereng.com> Cc: Scott Reuschling <sreuschling@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org> Subject: RE: Brookhill Plans Hello Ryan. I was able to work your Brookhill plans in this past week and I have completed my review. The plans are very detailed and I found them to be user friendly as well. I will stamp those plans approved when they come back with a permit application attached to them. I would like to pass on to you two comments from our fire sprinkler inspector, Scott Rueschling if I may. On your FP pages note #9 you reference NFPA 13R as not requiring sprinklers on porches and balconies. That reference is correct per 6.6.5 of 13R but section 903.3.1.2.1 of the 2012 VCC will trump that and require sprinklers on the balconies / decks. Also along the same lines, 6.6.7 of 13R exempts the need for sprinklers in breezeways. On your drawings you refer to the connecting corridor between the two exterior stairs a breezeway. I / we contend that this is an open-ended corridor as referenced on sect. 1026.6 of the VCC and will need to be provided with sprinkler protection. Please pass these thoughts on to your sprinkler contractor and feel free to get back to me should you need. If your spk. contractor wants to discuss this then please have him contact Scott directly and remove me from that conversation. sreuschling@albemarle.org I will leave these two huge rolls of plans up at the front counter for you to pick up Friday the 19th when you come by. Please get back to me with any questions of comments you may have. Keith Plans Reviewer / Deputy Building Official From: Ryan Yauger <rvauger@bohlereng.com> Sent: Tuesday, October 16, 2018 10:16 AM To: Keith Huckstep <KHUCKSTE@albemarle.org> Subject: Brookhill Plans Good Morning Keith, I apologize for missing your call. I just left you a return voicemail, but wanted to follow up with an email as well. I am free until 11am this AM for a return call , and then again after 1pm. Feel free to call the office line listed below. Look forward to speaking with you. Thank you! Ryan Yauger, P.E. Ot BOHLER F. N G I F. F. R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Heather McMahon Sent: Friday, October 12, 2018 4:14 PM To: Cameron Langille Subject: Planning Application Review for SDP201800050 Brookhill Block 4. The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Heather McMahon Review Status = No Objection Completed Date = 10/12/2018 This email was sent from County View Production. Cameron, I reviewed it as `no objection' with the following comment: The CoA for this project (ARB2018- 83) was issued 10-12-18. ARB staff has no objection to the approval of this SDP as long as the final/signature set of site plans have revised sheets C-701, C-702, C-703, and C-704 (these revised sheets were sent electronically to ARB staff on 10-10-18). Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Heather McMahon Sent: Friday, October 12, 2018 2:50 PM To: Ryan Yauger Cc: v152000@nf.bohlereng.com; Brandy Booker; Derek Reardon; Cameron Langille Subject: ARB2018-83: Brookhill Block 4 Final - COA Attachments: hER201 8-93f Hi Ryan, Please find your Certificate of Appropriateness for Brookhill, Block 4, Final Site Plan attached. I will be able to sign off on the SDP (2018-50) once you have supplied Cameron with 4 sets of a revised site plan that include the four recently revised landscape and lighting sheets you gave me. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Derek Reardon [mailto:dreardon@bohlereng.com] Sent: Wednesday, October 10, 2018 5:06 PM To: Heather McMahon <hmcmahon@albemarle.org> Cc: Ryan Yauger <ryauger@bohlereng.com>; v152000@nf.bohlereng.com; Brandy Booker <bbooker@ bohlereng.com> Subject: RE: ARB2018-83: Brookhill Block 4 Final -- latest revision, requested changes Hi Heather, Please find attached the electronic submission of the requested slip -sheets for the Brookhill Apartments Final Site Plan. I've also attached a comment response letter explaining the revisions made per your latest comments. If you have any questions, please let me know. Thank you! Derek Reardon, E.I.T. BOHLER I N G T\ F F R r N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 dreardon@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Heather McMahon [mailto:hmcmahon@albemarle.org] Sent: Wednesday, October 10, 2018 2:01 PM To: Ryan Yauger <ryauger@bohlereng.com> Subject: ARB2018-83: Brookhill Block 4 Final -- latest revision, requested changes Hi Ryan, Please see my notes in regard to the outstanding errors on the landscape and lighting sheet within this letter requesting changes, attached. Please send me revised versions of C-701, C-702, C-703, and C-704 electronically; I will slip -sheet them into the set that you delivered to me on Monday. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Cameron Langille Sent: Tuesday, October 09, 2018 6:11 PM To: Emily Cox Subject: FW: Project: V152000 - File Transfer - Brookhill Apartments Final Site Plan & Polo Grounds Road Plan Attachments: f Hi Emily, They dropped the hard copies off today of both the revised road plans (SUB201700117) and revised Block 4 final site plan (SDP201800050). The cover letter was addressed to both of us but intake just sent both plans to me. I have entered everything into CV and distributed the hard copies of the Block 4 final site plan, yours is on your chair. Ryan submitted two copies of the retaining wall profiles and I put both copies with your final site plan. I did not distribute the road plans, but I put the four sets on your drafting table. I'm not sure who they still need to go to at this point, but let me know if you want any help distributing the hard copies of those or entering them into CV, From: Derek Reardon <dreardon@bohlereng.com> Sent: Tuesday, October 09, 2018 1:47 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Apartments Final Site Plan & Polo Grounds Road Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: Derek Reardon (Bohler Engineering) To: blangille@albemarle.org; ecox@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton); bbooker@bohlereng.com Subject: Brookhill Apartments Final Site Plan & Polo Grounds Road Plan Purpose: For your review and comment Sent via: Info Exchange Expiration Date: 11/8/2018 Remarks: Cameron/Emily, In addition to the hard -copies being sent out today, please use the link provided to download these PDF versions: • Apartments Final Site Plan (Rev -Clouded) • Comment Response Letter for Apartments Final Site Plan • Retaining Wall Plans for the Apartments • Polo Grounds Road Improvement Plan (Signature Submission) Please feel free to reach out if you have any questions or need anything else. Thank you! Derek Reardon Transferred Files NAME TYPE DATE TIME SIZE 181005 Brookhill Polo Grounds Road Improvement PDF File 10/5/2018 5:11 PM 235,509 KB Plan - Rev 7.pdf 181008 - Brookhill Apartments Final Site Plan PDF File 10/8/2018 6:53 PM 94,395 KB Rev 3 - clouded.pdf 181008 Final Site Plan (Block 4) 2nd Review CRL.pdf PDF File 10/9/2018 10:24 AM 517 KB 3232R Brookhill Apartments PDF File 10/9/2018 10:11 AM 2,240 KB Section 1 Block 4A and 4B (20180913).pdf From: Derek Reardon <dreardon@bohlereng.com> Sent: Tuesday, October 09, 2018 1:47 PM To: Cameron Langille Subject: Project: V152000 - File Transfer - Brookhill Apartments Final Site Plan & Polo Grounds Road Plan Attachments: - QQQq4 p f IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: Derek Reardon (Bohler Engineering) To: blangille@albemarle.org; ecox@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton); bbooker@bohlereng.com Subject: Brookhill Apartments Final Site Plan & Polo Grounds Road Plan Purpose: For your review and comment Sent via: Info Exchange Expiration Date: 11/8/2018 Remarks: Cameron/Emily, In addition to the hard -copies being sent out today, please use the link provided to download these PDF versions: • Apartments Final Site Plan (Rev -Clouded) • Comment Response Letter for Apartments Final Site Plan • Retaining Wall Plans for the Apartments • Polo Grounds Road Improvement Plan (Signature Submission) Please feel free to reach out if you have any questions or need anything else. Thank you! Derek Reardon Transferred Files NAME TYPE DATE TIME SIZE 181005 Brookhill Polo Grounds Road Improvement PDF File 10/5/2018 5:11 PM 235,509 KB Plan - Rev 7.pdf 181008 - Brookhill Apartments Final Site Plan PDF File 10/8/2018 6:53 PM 94,395 KB Rev 3 - clouded.pdf 181008 Final Site Plan (Block 4) 2nd Review CRL.pdf PDF File 10/9/2018 10:24 AM 517 KB 3232R Brookhill Apartments PDF File 10/9/2018 10:11 AM 2,240 KB Section 1 Block 4A and 4B (20180913).pdf From: Cameron Langille Sent: Tuesday, October 02, 2018 6:31 PM To: Ryan Yauger Subject: SDP2018000SO Brookhill Block 4 Final Site Plan - First Revision Review • MIN •.1 WA1WAIa F.-IM DI WAIJ :1/1 1 _C: • • •• Hi Ryan, Attached are PDFs of the review comments. Please note that Heather noticed that the Landscape Plans included in the most recent ARB submittal (which was submitted after the revised block 4 final site plan) had differences in the landscaping schedules and drawings. The ARB comments I have included in this email are based on the Landscape Plans in the final site plan, not the ARB plans. She is going to send you her comments on the ARB landscaping plans tomorrow morning. Let me know if you have any questions. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Richard Nelson <rnelson@serviceauthority.org> Sent: Tuesday, October 02, 2018 8:12 AM To: Cameron Langille Subject: RE: SDP-2018-50 Brookhill Block 4 Final Cameron, We have been sending comments to the applicant directly. It is still under review. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Cameron Langille <blangille@albemarle.org> Sent: Monday, October 01, 2018 4:44 PM To: Richard Nelson <rnelson@serviceauthority.org> Subject: RE: SDP-2018-50 Brookhill Block 4 Final Hi Richard, Please confirm that you have sent any specific comments you have related to this final site plan directly to the applicant. I am preparing to send the County's comment letter out on Wednesday and I just want to verify the status of ACSA review. From: Richard Nelson <rnelson@serviceauthority.org> Sent: Tuesday, September 25, 2018 9:14 AM To: Cameron Langille <blangille@albemarle.org> Subject: SDP-2018-50 Brookhill Block 4 Final Cameron, SDP-2018-50 Brookhill Block 4 Final is currently under ACSA review. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Heather McMahon Sent: Monday, October 01, 2018 10:36 AM To: Cameron Langille Subject: RE: Comments for SDP2018-50 Did you ever receive this email from me? From: Heather McMahon Sent: Friday, September 28, 2018 5:44 PM To: Cameron Langille <blangille@albemarle.org> Subject: Comments for SDP2018-50 Cameron, I have compiled comments for Brookhill, Block 4 Final SDP, the resubmission with revised drawings dated 8-31-18. The file I have is too large to send via email and I have not loaded it into laserfiche. Please find it on the I: drive: I:\DEPT\Community Development\Planning Division\Heather\SDPs It looks like this: Comments for SDP2018-50.pdf SDP2017-58 LOR1 requested changes2.doc Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org 9/28/2018 5:40 PM PDF Document 8/30/2018 12:09 PM Microsoft Word9,,, From: Heather McMahon Sent: Friday, September 28, 2018 5:45 PM To: Cameron Langille Subject: Comments for SDP2O18-50 Cameron, I have compiled comments for Brookhill, Block 4 Final SDP, the resubmission with revised drawings dated 8-31-18. The file I have is too large to send via email and I have not loaded it into laserfiche. Please find it on the I: drive: I:\DEPT\Community Development\Planning Division\Heather\SDPs It looks like this: Comments for SDP2018-50.pdf SDP2017-58 LOR1 requested change=.2.doc Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org 9/28/2018 5:40 PM PDF Document 8/30/2018 12:09 PM Microsoft Word9,,, From: Cameron Langille Sent: Tuesday, September 25, 2018 6:23 PM To: Emily Cox Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4 Thanks for sending me these! Can you let me know if the Block 4 WPO plans show tree protection fencing along the boundary of the 100' buffer adjacent to Route 29, as well as fencing between the greenway boundary (north side of Block 4B) and the improvements in Block 413? The COD requires them to identify existing trees with calipers greater than 18" in both of those areas. They're technically supposed to shown them on the existing conditions, grading, and landscape plans for the final site plan. I made several comments on the Block 4 final site plan asking them to identify those tree locations within the buffer and greenway, and Ryan replied that they are putting up protection fencing along the boundaries of the buffer and greenway in order to protect the existing landscaping. If the fencing is shown on the WPO, then I am going to say that my comments have been addressed and they don't need to show it all on the final site plan. From: Emily Cox Sent: Thursday, September 20, 2018 4:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: Planning Application Review for SDP201800050 Brookhill Block 4. I did not upload to countyview, in case you have any questions or additional comments regarding engineering. Thanks! The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 09/20/2018 This email was sent from County View Production. From: Richard Nelson <rnelson@serviceauthority.org> Sent: Tuesday, September 25, 2018 9:14 AM To: Cameron Langille Subject: SDP-2018-50 Brookhill Block 4 Final Cameron, SDP-2018-50 Brookhill Block 4 Final is currently under ACSA review. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Emily Cox Sent: Thursday, September 20, 2018 4:59 PM To: Cameron Langille Subject: Planning Application Review for SDP201800050 Brookhill Block 4 Attachments: KDP2019000SO Brookbill Block 4 apartments - final Rpvl.d c I did not upload to countyview, in case you have any questions or additional comments regarding engineering. Thanks! The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 09/20/2018 This email was sent from County View Production. From: Shawn Maddox Sent: Friday, September 07, 2018 8:58 AM To: Cameron Langille Subject: Re: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Fire Rescue has no objections to this plan also with the changes. Thank you. Shawn From: Cameron Langille Sent: Thursday, September 6, 2018 5:57 PM To: Shawn Maddox Subject: RE: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Shawn, I still have not received any comments from you on this plan. Comments were due on July 31 and the applicant is asking where Fire and Rescue's review stands. Please respond to me ASAP so I can inform them of the status. Thanks, Cameron From: Cameron Langille Sent: Tuesday, July 31, 2018 3:36 PM To: Shawn Maddox <smaddox@albemarle.org> Subject: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Hi Shawn, I was am just checking on the status of the Fire/Rescue review for this final site plan. The applicant was asking me whether you have any comments. When you get a chance, let me know. Thanks, Cameron From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; 'Moore, Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. http://www.albemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%5bC DD-Planning%5d:%SbApplicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Cameron Langille Sent: Thursday, September 06, 2018 5:58 PM To: Shawn Maddox Subject: RE: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Shawn, I still have not received any comments from you on this plan. Comments were due on July 31 and the applicant is asking where Fire and Rescue's review stands. Please respond to me ASAP so I can inform them of the status. Thanks, Cameron From: Cameron Langille Sent: Tuesday, July 31, 2018 3:36 PM To: Shawn Maddox <smaddox@albemarle.org> Subject: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Hi Shawn, I was am just checking on the status of the Fire/Rescue review for this final site plan. The applicant was asking me whether you have any comments. When you get a chance, let me know. Thanks, Cameron From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; 'Moore, Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. http://www.Abemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%5bCDD- Planning%5d:%5bApplicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Brandy Booker <bbooker@bohlereng.com> Sent: Thursday, September 06, 2018 5:05 PM To: Cameron Langille Subject: RE: Brookhill FSP Block 4 - Site Plan Copies Will do —thanks so much Cameron! Brandy Booker, Notary Public 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 I bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Thursday, September 06, 2018 5:04 PM To: Brandy Booker <bbooker@bohlereng.com> Subject: RE: Brookhill FSP Block 4 - Site Plan Copies Yes, 11 is what I need. You may want to email Richard Nelson and Alex Morrison with ACSA to see if they want you to submit additional copies directly to their office with the resubmittal. I will transmit one of the 11 copies to them myself, but sometimes they ask applicants to give them additional copies directly. Emails: amorrison@serviceauthority.o19 and rnelson@serviceauthority.org From: Brandy Booker <bbooker@bohlereng.com> Sent: Thursday, September 06, 2018 4:54 PM To: Cameron Langille <blangille@albemarle.org> Subject: Brookhill FSP Block 4 - Site Plan Copies Importance: High Hi Cameron, Can you tell me how many sets need to be resubmitted for the above referenced project? I have 11 but I'm not sure if that's correct? Thanks! Brandy Booker BOHLER F N G i\ F r R r n r 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Cameron Langille Sent: Thursday, September 06, 2018 5:04 PM To: Brandy Booker Subject: RE: Brookhill FSP Block 4 - Site Plan Copies Yes, 11 is what I need. You may want to email Richard Nelson and Alex Morrison with ACSA to see if they want you to submit additional copies directly to their office with the resubmittal. I will transmit one of the 11 copies to them myself, but sometimes they ask applicants to give them additional copies directly. Emails: amorrison@serviceauthority.org and rnelson@serviceauthority.org From: Brandy Booker <bbooker@bohlereng.com> Sent: Thursday, September 06, 2018 4:54 PM To: Cameron Langille <blangille@albemarle.org> Subject: Brookhill FSP Block 4 - Site Plan Copies Importance: High Hi Cameron, Can you tell me how many sets need to be resubmitted for the above referenced project? I have 11 but I'm not sure if that's correct? Thanks! Brandy Booker BOHLER I N (: I\ I - 1` R I N (: 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Brandy Booker <bbooker@bohlereng.com> Sent: Thursday, September 06, 2018 4:54 PM To: Cameron Langille Subject: Brookhill FSP Block 4 - Site Plan Copies Importance: High Hi Cameron, Can you tell me how many sets need to be resubmitted for the above referenced project? I have 11 but I'm not sure if that's correct? Thanks! Brandy Booker Of BOHLER F. N(: I F. F R I K G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Heather McMahon Sent: Monday, August 20, 2018 4:47 PM To: Cameron Langille Subject: SDP2018-50: Brookhill, Block 4, Final SDP -- ARB comments from 8/20/18 Attachments: x Hey Cameron, I didn't want to put this into County View since it doesn't seem like you have received revised site plans for this SDP submission; but I received a revised submission on 7/20/18 and it went to the ARB today (8/20/18). We've requested 19 revisions, so we'll get yet another revised set of site and architectural plans, but I'm attaching the Action Memo here so you can see what comments we made. I'm also cutting -and -pasting the action below: REGULAR REVIEW ITEMS a. ARB-2018-83: Brookhill Blocks 4 and 4A Final - Final Site Plan (TM/Parcels 046000000019A0, 046000000019131) Proposal: To develop blocks 4A and 4B with nine multi -family apartment buildings, parking areas, and associated improvements. Location: East side of Seminole Trail (Rt. 29 N) and north side of Polo Grounds Road (Rt. 643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. Mr. Stoner arrived at 1:08 p.m. Motion: Mr. Binsted moved for approval of the Certificate of Appropriateness for ARB-2018-83: Brookhill Blocks 4 and 4A Final - Final Site Plan with the following conditions listed in the staff report. 1. Revise the architectural elevations to call out the materials listed in the Elevation Key Notes. Revise the Elevation Key Notes to omit those materials or architectural features that are not proposed for these buildings. 2. Coordinate the dimensions of the trash enclosures between the architectural and site plans. Show the ramp/stair structures on the site plan. Coordinate the ramp/stair structures with proposed landscaping without reducing plant quantities or degree of screening. 3. Consider increasing the level of detail in the west elevation of Building C, Block 4B, consistent with that provided in Building B. 4. Provide the window glass note on the architectural elevations: Window glass in the Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. Specifications on the proposed window glass should be submitted with the application for final review. 5. Illustrate electric, gas, telephone and cable utilities on the site plan, or indicate that no such utilities are proposed. 6. Provide the standard mechanical equipment note on the architectural elevations: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 7. Provide total lumens in the luminaire schedule for all proposed lights. 8. Revise the lighting plans to include the illumination output from the proposed light fixtures on the Clubhouse and the Fitness Building in Block 4A. Add the proposed light fixtures graphically to the site plan. Include the light fixtures' specifications in the luminaire schedules. 9. Revise the lighting plan such that no footcandle value exceeds 20 fc. 10. Provide a note on the lighting plan that 18 feet is the maximum mounting height from grade for the pole lights, inclusive of the base. 11. Provide the standard lighting note on the lighting plans (C-704 and C-705). 12. Revise the plan to eliminate conflicts between light poles and trees. 13. Reduce the depth of the planting gap along the western wall of the southwestern building in Block 413 and the beginning of the landscape buffer to 10' by adding trees. 14. Revise the landscape plans on C-701 and C-702 to call out the number and types of shrubbery proposed for Stella Lane and Archer Avenue. Rectify the plant schedules to correspond to the illustration. 15. Revise the plan to resolve all utility/landscape conflicts. 16. Graphically provide the numbers and varieties of shrubs proposed for the foundations of those buildings lining Archer Avenue. Ensure that no proposed shrub exceeds in quantity 25% of the total shrub count. 17. Provide an additional 55 feet of landscape frontage on the west side of the stormwater management facility to the northwest of Block 4B to join the existing treeline or proposed 100' frontage landscape buffer. 18. Rectify the errors and discrepancies in the plant schedules on C-701, C-702, and C-703. 19. Address the discrepancy in the number of Zelkovas illustrated on C-701 and those in the detail of the tree canopy in Block 4B provided on sheet C-703. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Cameron Langille Sent: Thursday, August 16, 2018 6:27 PM To: Ryan Yauger Subject: Follow Up about ROW Dedication for Stella and Archer Hi Ryan, Did you ever figure out whether HUD application will be negatively affected if the right of way for Stella and Archer can be dedicated through a subdivision plat, and then recorded and shown on the final site plan as such? Like I mentioned last week on the phone, the right of way for both roads technically is required to be dedicated and recorded with the County Clerk prior to any final site plan approvals if the final site plan proposed driveway entrances on those new roads. I know there is a push to get the Block 4 final site plan approved ASAP, so I want to try and get this figured out if there would be an issue with the HUD application. I haven't sent review comments to Kris for the Block 4 BLA plat. If there isn't an issue with getting that right of way dedicated, then I am going to tell Kris to show it on that BLA plat. That way I can approve the final site plan and not have any problems with the ordinance for right of way dedication. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Alan Taylor <alan@riverbenddev.com> Sent: Thursday, August 02, 2018 6:29 PM To: Cameron Langille Cc: Ryan Yauger Subject: Re: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments W0000h000000000! ! ! ! < mobile > On Aug 2, 2018, at 5:52 PM, Cameron Langille <blangille@albemarle.org> wrote: Ryan & Alan, Good news — VDOTjust sent their comment letter (attached) for SDP201800050, and they have no comments. I am still trying to get a hold of Shawn Maddox since Fire & Rescue has not yet finished their review. I'll keep you posted. From: Cameron Langille Sent: Wednesday, July 25, 2018 5:49 PM To: Ryan Yauger <ryauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is an updated comment letter. It includes Planning, Engineering, E911, ARB, Inspections, and ACSA comments for the first review. VDOT and Fire Rescue have not yet finished their reviews. I will send you their comments or approvals once they send them to me. Please let me know if you have any questions! -Cameron From: Cameron Langille Sent: Tuesday, July 24, 2018 4:45 PM To: 'Ryan Yauger' <ryauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is a PDF of my comments from Planning. The letter is divided into three sections: new comments pertaining to SDP201800050, outstanding comments that still need to be addressed from the Block 4A initial site plan action letter, and outstanding comments that still need to be addressed from the Block4B initial site plan action letter. I am out of the office at a conference today so I can't put together the full review comment letter with all the other reviewers. I sent the Inspections, ACSA, ARB, and E911 comments on Friday to you. I will make a full comment letter with all the reviewers comments included tomorrow once I'm back in the office. As a note, I still haven't received comments from VDOT or Fire Rescue as of today. Engineering has told me their review comments will be finished tomorrow. Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org <SDP201800050 VDOT First Review Comment Letter 8-2-2018.pdf> From: Ryan Yauger <ryauger@bohlereng.com> Sent: Thursday, August 02, 2018 5:56 PM To: Cameron Langille Cc: Alan Taylor (alan@riverbenddev.com) Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Sounds good, thank you Cameron! For tomorrow's meeting, we have the following agenda items: - ARB Status, are we on the August 20t" docket? - Rio Mills decision/update from Rebecca - 2-lot subdivision submitted — recap of intent - ARB Update on Ice Park — informing Heather we're punting to 2nd submission for staff review due to building revision - Plan Review Status — waiting for comments from VDOT and ACSA for Apartments; Ice Park outstanding from everyone See you tomorrow. Ryan From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Thursday, August 02, 2018 5:52 PM To: Ryan Yauger <ryauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Ryan & Alan, Good news — VDOTjust sent their comment letter (attached) for SDP201800050, and they have no comments. I am still trying to get a hold of Shawn Maddox since Fire & Rescue has not yet finished their review. I'll keep you posted. From: Cameron Langille Sent: Wednesday, July 25, 2018 5:49 PM To: Ryan Yauger <ryauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is an updated comment letter. It includes Planning, Engineering, E911, ARB, Inspections, and ACSA comments for the first review. VDOT and Fire Rescue have not yet finished their reviews. I will send you their comments or approvals once they send them to me. Please let me know if you have any questions! -Cameron From: Cameron Langille Sent: Tuesday, July 24, 2018 4:45 PM To: 'Ryan Yauger' <rvauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is a PDF of my comments from Planning. The letter is divided into three sections: new comments pertaining to SDP201800050, outstanding comments that still need to be addressed from the Block 4A initial site plan action letter, and outstanding comments that still need to be addressed from the Block4B initial site plan action letter. I am out of the office at a conference today so I can't put together the full review comment letter with all the other reviewers. I sent the Inspections, ACSA, ARB, and E911 comments on Friday to you. I will make a full comment letter with all the reviewers comments included tomorrow once I'm back in the office. As a note, I still haven't received comments from VDOT or Fire Rescue as of today. Engineering has told me their review comments will be finished tomorrow. Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Cameron Langille Sent: Thursday, August 02, 2018 5:52 PM To: Ryan Yauger Cc: Alan Taylor (alan@riverbenddev.com) Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Attachments: - - Ryan & Alan, Good news — VDOTjust sent their comment letter (attached) for SDP201800050, and they have no comments. I am still trying to get a hold of Shawn Maddox since Fire & Rescue has not yet finished their review. I'll keep you posted. From: Cameron Langille Sent: Wednesday, July 25, 2018 5:49 PM To: Ryan Yauger <ryauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is an updated comment letter. It includes Planning, Engineering, E911, ARB, Inspections, and ACSA comments for the first review. VDOT and Fire Rescue have not yet finished their reviews. I will send you their comments or approvals once they send them to me. Please let me know if you have any questions! -Cameron From: Cameron Langille Sent: Tuesday, July 24, 2018 4:45 PM To: 'Ryan Yauger' <rvauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is a PDF of my comments from Planning. The letter is divided into three sections: new comments pertaining to SDP201800050, outstanding comments that still need to be addressed from the Block 4A initial site plan action letter, and outstanding comments that still need to be addressed from the Block4B initial site plan action letter. I am out of the office at a conference today so I can't put together the full review comment letter with all the other reviewers. I sent the Inspections, ACSA, ARB, and E911 comments on Friday to you. I will make a full comment letter with all the reviewers comments included tomorrow once I'm back in the office. As a note, I still haven't received comments from VDOT or Fire Rescue as of today. Engineering has told me their review comments will be finished tomorrow. Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Deel, Justin <justin.deel@vdot.virginia.gov> Sent: Thursday, August 02, 2018 3:02 PM To: Cameron Langille Cc: Adam Moore Subject: SDP201800050 Brookhill Blocks 4A & 4B FSP 8-2-18 Cameron, Attached is our approval letter for SDP201800050 Brookhill Blocks 4A & 4B FSP 8- 2-18. Justin Justin Deel, P.E. VDOT - Charlottesville 434-422-9894 540-717-1408 (c) From: Justin Deel <justin.deel@vdot.virginia.gov> Sent: Thursday, August 02, 2018 9:17 AM To: Adam Moore; Cameron Langille Subject: RE: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Yes it is. Will get it out this afternoon. From: Moore, Adam[maiIto: adam.moore(aDvdot.virginia.gov] Sent: Wednesday, August 01, 2018 10:35 AM To: Cameron Langille; Deel, Justin Subject: Re: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Hi Cameron, Justin is out most of this week but we plan to get a couple reviews out tomorrow afternoon. I think this is probably one of them but I won't know for sure until tomorrow. Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use VDOT - Charlottesville Residency 701 VDOT Way I Charlottesville I VA main 434.422.9782 On Tue, Jul 31, 2018 at 3:36 PM, Cameron Langille <blan ig llegalbemarle.org> wrote: Hi Adam, I'm just checking on the status of the VDOT review for this final site plan. Let me know if you're having any issues accessing the files through Countyview or Bluebeam. Thanks, Cameron From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl(a albemarle.org>; Emily Cox <ecoxkalbemarle.org>; Matthew Wentland <mwentlandgalbemarle.org>; John Anderson <janderson2(i�,albemarle.org>; Shawn Maddox <smaddox&albemarle.org>; Michael Dellinger <mdellinger&albemarle.org>; Elise Kiewra <ekiewra('c�albemarle.org>; Heather McMahon <hmcmahon(a),albemarle.org>; Margaret Maliszewski <MMaliszewskigalbemarle.org>; Rebecca Ragsdale <rra sg dalegalbemarle.org>; Richard Nelson<melson(a)serviceauthority.org>; 'Moore, Adam PE (VDOT)' <Adam.Moorekvdot.vir ig nia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. hllp://www.albemarle.ora/weblink/search.aspx?dbid=3&searchcommand=%7b%5bCD D-Planning%5d:%5bApplicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blan ig lle c&albemarle.org From: Moore, Adam <adam.moore@vdot.virginia.gov> Sent: Wednesday, August 01, 2018 10:35 AM To: Cameron Langille; Deel, Justin Subject: Re: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Hi Cameron, Justin is out most of this week but we plan to get a couple reviews out tomorrow afternoon. I think this is probably one of them but I won't know for sure until tomorrow. Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use VDOT - Charlottesville Residency 701 VDOT Way I Charlottesville I VA main 434.422.9782 On Tue, Jul 31, 2018 at 3:36 PM, Cameron Langille <blangille@albemarle.org> wrote: Hi Adam, I'm just checking on the status of the VDOT review for this final site plan. Let me know if you're having any issues accessing the files through Countyview or Bluebeam. Thanks, Cameron From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fPohl @aIbemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; 'Moore, Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. http://www.aIbemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%SbCDD- PlanninR%5d:%5bApplicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Cameron Langille Sent: Tuesday, July 31, 2018 3:37 PM To: Adam.Moore@vdot.virginia.gov Subject: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Hi Adam, I'm just checking on the status of the VDOT review for this final site plan. Let me know if you're having any issues accessing the files through Countyview or Bluebeam. Thanks, Cameron From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; 'Moore, Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 413 Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/413 Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. httr)://www.aIbemarle.ore/weblink/search.asr)x?dbid=3&searchcommand=%7b%SbCDD- Planninc%5d:%SbAoolicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Cameron Langille Sent: Tuesday, July 31, 2018 3:36 PM To: Shawn Maddox Subject: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Hi Shawn, I was am just checking on the status of the Fire/Rescue review for this final site plan. The applicant was asking me whether you have any comments. When you get a chance, let me know. Thanks, Cameron From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; 'Moore, Adam PE (VDOT)' <Adam.Moore@vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. htta://www.albemarle.orii/weblink/search.asDx?dbid=3&searchcommand=%7b%SbCDD- Planninia 5d:%SbAoolicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, July 31, 2018 2:05 PM To: Cameron Langille Subject: RE: Brookhill Questions Sounds good — I'll be in a meeting from 4-430, but if you don't get me before that, then I will call you after. Thanks! From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Tuesday, July 31, 2018 1:55 PM To: Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Questions Hi Ryan, I'm going to be in a meeting until 3:15 or 3:30 PM or so, can I call you after that? From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, July 31, 2018 11:19 AM To: Cameron Langille <blangille@albemarle.org> Subject: Brookhill Questions Hey Cameron, I wanted to pick your brain on the Brookhill apartments, and specifically how we will show the new parcels/ROW on the revised plan. Please give me a call when you have a free moment. Thanks! Ryan Yauger, P.E. BOHLER F: N G i\ F F R F N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Ryan Yauger <ryauger@bohlereng.com> Sent: Tuesday, July 31, 2018 11:19 AM To: Cameron Langille Subject: Brookhill Questions Hey Cameron, I wanted to pick your brain on the Brookhill apartments, and specifically how we will show the new parcels/ROW on the revised plan. Please give me a call when you have a free moment. Thanks! Ryan Yauger, P.E. BOHLER F N G I N F. F R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 M: 540-424-8854 1 ryauger@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Emily Cox Sent: Thursday, July 26, 2018 8:07 AM To: Cameron Langille Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4 1 also think I just found the rip -rap calculations, but that's ok. I don't need to change my comments. They can just say they were provided. Lol Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 {fit' 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Wednesday, July 25, 2018 5:36 PM To: Emily Cox <ecox@albemarle.org> Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4 These comments are good! Only thing is that I just found out myself that we don't require loading spaces for residential. I'm going to send your letter as is, and in my planning comments I'm saying no loading spaces required. I didn't see any shown on the plans anyways so it's all good. From: Emily Cox Sent: Wednesday, July 25, 2018 4:16 PM To: Cameron Langille <blangille@albemarle.org> Subject: Planning Application Review for SDP201800050 Brookhill Block 4. Cameron- See attached. I did not upload these into county view. Let me know if you have any questions. Thanks! The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 07/25/2018 This email was sent from County View Production. From: Emily Cox Sent: Thursday, July 26, 2018 8:04 AM To: Cameron Langille Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4 Cool, thanks. I didn't know that. That should be required for apartments! Think of all the moving trucks that come and go! Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 {fit' 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Wednesday, July 25, 2018 5:36 PM To: Emily Cox <ecox@albemarle.org> Subject: RE: Planning Application Review for SDP201800050 Brookhill Block 4 These comments are good! Only thing is that I just found out myself that we don't require loading spaces for residential. I'm going to send your letter as is, and in my planning comments I'm saying no loading spaces required. I didn't see any shown on the plans anyways so it's all good. From: Emily Cox Sent: Wednesday, July 25, 2018 4:16 PM To: Cameron Langille <blangille@albemarle.org> Subject: Planning Application Review for SDP201800050 Brookhill Block 4. Cameron- See attached. I did not upload these into county view. Let me know if you have any questions. Thanks! The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 07/25/2018 This email was sent from County View Production. From: Cameron Langille Sent: Wednesday, July 25, 2018 5:49 PM To: Ryan Yauger Cc: Alan Taylor (alan@riverbenddev.com) Subject: RE: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Attachments: - - Hi Ryan, Attached is an updated comment letter. It includes Planning, Engineering, E911, ARB, Inspections, and ACSA comments for the first review. VDOT and Fire Rescue have not yet finished their reviews. I will send you their comments or approvals once they send them to me. Please let me know if you have any questions! -Cameron From: Cameron Langille Sent: Tuesday, July 24, 2018 4:45 PM To: 'Ryan Yauger' <ryauger@bohlereng.com> Cc: Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Subject: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Hi Ryan, Attached is a PDF of my comments from Planning. The letter is divided into three sections: new comments pertaining to SDP201800050, outstanding comments that still need to be addressed from the Block 4A initial site plan action letter, and outstanding comments that still need to be addressed from the Block4B initial site plan action letter. I am out of the office at a conference today so I can't put together the full review comment letter with all the other reviewers. I sent the Inspections, ACSA, ARB, and E911 comments on Friday to you. I will make a full comment letter with all the reviewers comments included tomorrow once I'm back in the office. As a note, I still haven't received comments from VDOT or Fire Rescue as of today. Engineering has told me their review comments will be finished tomorrow. Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Emily Cox Sent: Wednesday, July 25, 2018 4:16 PM To: Cameron Langille Subject: Planning Application Review for SDP201800050 Brookhill Block 4 Attachments: KDP2019000SO Brookbill Block 4 apartments - i f Cameron- See attached. I did not upload these into county view. Let me know if you have any questions. Thanks! The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Emily Cox Review Status = Requested Changes Completed Date = 07/25/2018 This email was sent from County View Production. From: Cameron Langille Sent: Tuesday, July 24, 2018 4:45 PM To: Ryan Yauger Cc: Alan Taylor (alan@riverbenddev.com) Subject: SDP201800050 - Brookhill Block 4 Final Site Plan - Planning First Review Comments Attachments: - Plnnnong Hi Ryan, Attached is a PDF of my comments from Planning. The letter is divided into three sections: new comments pertaining to SDP201800050, outstanding comments that still need to be addressed from the Block 4A initial site plan action letter, and outstanding comments that still need to be addressed from the Block4B initial site plan action letter. I am out of the office at a conference today so I can't put together the full review comment letter with all the other reviewers. I sent the Inspections, ACSA, ARB, and E911 comments on Friday to you. I will make a full comment letter with all the reviewers comments included tomorrow once I'm back in the office. As a note, I still haven't received comments from VDOT or Fire Rescue as of today. Engineering has told me their review comments will be finished tomorrow. Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Emily Cox Sent: Tuesday, July 24, 2018 3:49 PM To: Cameron Langille Subject: RE: apartments site plan I just met with Frank this afternoon. I want to go through everything and re -organize and I will get you comments sometime tomorrow. Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Monday, July 23, 2018 4:42 PM To: Emily Cox <ecox@albemarle.org> Subject: RE: apartments site plan Not a problem, just send to me when finished. From: Emily Cox Sent: Monday, July 23, 2018 4:41 PM To: Cameron Langille <blangille@albemarle.org> Subject: apartments site plan I am not finished with my review today. Is that a problem? I just want to be thorough and ask frank a few questions before I officially make comments. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Monday, July 23, 2018 4:42 PM To: Emily Cox Subject: RE: apartments site plan Not a problem, just send to me when finished. From: Emily Cox Sent: Monday, July 23, 2018 4:41 PM To: Cameron Langille <blangille@albemarle.org> Subject: apartments site plan I am not finished with my review today. Is that a problem? I just want to be thorough and ask frank a few questions before I officially make comments. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.ore From: Emily Cox Sent: Monday, July 23, 2018 4:41 PM To: Cameron Langille Subject: apartments site plan I am not finished with my review today. Is that a problem? I just want to be thorough and ask frank a few questions before I officially make comments. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Friday, July 20, 2018 5:58 PM To: Ryan Yauger Cc: Alan Taylor (alan@riverbenddev.com) Subject: Partial Review Comments for SDP201800050 Final Site Plan Attachments: �DP2018000SO Partial Review Comments 7-20-2018,p& Good Evening Ryan, Attached are the partial review comments for the Block 4 final site plan. Comments from ACSA, ARB, E911, and Inspections are included in the report. VDOT, Planning, Engineering, and Fire/Rescue have not yet completed their reviews. Please let me know if you have any questions. Have a great weekend, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Heather McMahon Sent: Friday, July 20, 2018 4:05 PM To: Cameron Langille Subject: Brookhill block 4 Final review Cambo, I did a quick review of the first few of your action letter items on Block 4A Initial SDP. Here's what I have: #6 comment addressed #7a-c addressed; 7d not addressed #8a-c addressed; 8d not addressed #9 comment gray -out #10 comment addressed on C-104 #11 comment addressed New comment: C-100 (cover sheet), the TMP 46-19134 is wrong, should be 46-19A; TMP 19-46131 is correct From: Tim Padalino Sent: Friday, July 20, 2018 4:04 PM To: Cameron Langille; Victoria Kanellopoulos Subject: review comments sdp2018-14 We got through review comments 2-7 as follows: 2. N/A (due to combination of 2 initial SDPs into 1 Final SDP; quantifications/tabulations no longer directly applicable) 3. addressed 4.a.) addressed b.) addressed 5. two -lot subdivision plat is still under review; final site plan must be updated with boundaries and Deed Book and Page references after approval and recordation of subdivision plat 6. a.) not addressed: SUB201700117 under review b.) not addressed; "proposed public ROW' labels not shown for Stella or Archer 7.) addressed Good luck! Tim Padalino, AICP Senior Planner I Community Development Department County of Albemarle, Virginia httDS://www.albemarle.ora/deDartment.aSD?department=cdd (434)-296-5832 x. 3088 From: Claudette Borgersen on behalf of clerk Sent: Friday, July 20, 2018 11:59 AM To: Cameron Langille Cc: Travis Morris Subject: RE: Claudette Borgersen made a change to Special Exception, Brookhill ZMA201500007 (setbacks) Hi Cameron, You should have. Confirmations are supposed to go to all folks listed on the form. I will have to find out from IT why you did not. Thanks for letting me know. Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(c�albemarle.org From: Cameron Langille Sent: Friday, July 20, 2018 11:19 AM To: clerk <clerk@albemarle.org> Cc: Travis Morris <tmorris2@albemarle.org> Subject: RE: Claudette Borgersen made a change to Special Exception, Brookhill ZMA201500007 (setbacks) Hi Claudette, I did not receive a confirmation email on Tuesday, I just checked. David Benish sent the original request in through the system and I am just listed as the primary author. Maybe that's why I didn't receive an email? From: Claudette Borgersen On Behalf Of clerk Sent: Thursday, July 19, 2018 5:23 PM To: Cameron Langille <blangille@albemarle.org> Cc: Travis Morris <tmorris2@albemarle.org> Subject: FW: Claudette Borgersen made a change to Special Exception, Brookhill ZMA201500007 (setbacks) Hi Cameron, Yes, it has been moved to September 5. 1 changed it in the system on Tuesday. Wondering if you got a confirmation e-mail? You should have, but if not, let me know because something could be wrong with the system. See below for a copy of the confirmation e-mail. Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(@albemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Tuesday, July 17, 2018 3:50 PM To: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org>; Siri Russell <srussell@albemarle.org> Subject: Claudette Borgersen made a change to Special Exception, Brookhill ZMA201500007 (setbacks) Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Claudette Borgersen has changed this agenda item: Change made: Moved from Aug 8 agenda and moved to September 5 agenda. Deadline to legal is 8/17. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 9/5/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Note to Clerk: My Board Agenda Items From: Elise Kiewra Sent: Friday, July 20, 2018 9:30 AM To: Cameron Langille Subject: Planning Application Review for SDP201800050 Brookhill Block 4. The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Elise Kiewra Review Status = Requested Changes Completed Date = 07/20/2018 This email was sent from County View Production. From: Elise Kiewra Sent: Friday, July 20, 2018 8:45 AM To: Megan Nedostup; Cameron Langille Subject: RE: digital site plans Ok, sorry for a million emails. Paty fixed it, apparently in the new version it doesn't automatically open and there is a really thin blue line you have to move to get the projects to come up. Elise From: Elise Kiewra Sent: Friday, July 20, 2018 7:31 AM To: Megan Nedostup <mnedostup@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: digital site plans Cameron, It finally let me set my password but when I open yours or Megan's nothing shows up. This will be the first time I have had a digital site plan since a new computer so I'm guessing it is something on my end but don't know what. Megan, We head out for team building at 10am today so if I don't catch you I can look next week but Cameron's is due Monday. Elise Kiewra, GISP GIS Specialist Division of Information Services htta://aisweb.albemarle.orR ekiewra(@albemarle.ore From: Elise Kiewra Sent: Friday, July 20, 2018 7:31 AM To: Megan Nedostup; Cameron Langille Subject: digital site plans Cameron, It finally let me set my password but when I open yours or Megan's nothing shows up. This will be the first time I have had a digital site plan since a new computer so I'm guessing it is something on my end but don't know what. Megan, We head out for team building at 10am today so if I don't catch you I can look next week but Cameron's is due Monday. Elise Kiewra, GISP GIS Specialist Division of Information Services httD://eisweb.albemarle.ora ekiewra(@albemarle.ore !icy ►• :Z:�•�:ie;�!{1[c�ileii From: Elise Kiewra Sent: Friday, July 20, 2018 7:19 AM To: Cameron Langille Subject: RE: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Cameron, Sorry this is so last minute and I head out at 10am today for team building the rest of the day. This is asking me to sign into bluebeam and I have never had to do that and any passwords I try don't work. I try to reset and and it won't work either.Thoughts? Elise From: Cameron Langille Sent: Monday, July 2, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Moore, Adam PE (VDOT) <Adam.Moore @vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. httr)://www.albemarle.ore/weblink/search.asox?dbid=3&searchcommand=%7b%SbCDD- Plannine%5d:%SbADDlicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Claudette Borgersen on behalf of clerk Sent: Thursday, July 19, 2018 5:23 PM To: Cameron Langille Cc: Travis Morris Subject: FW: Claudette Borgersen made a change to Special Exception, Brookhill ZMA201500007 (setbacks) Hi Cameron, Yes, it has been moved to September 5. 1 changed it in the system on Tuesday. Wondering if you got a confirmation e-mail? You should have, but if not, let me know because something could be wrong with the system. See below for a copy of the confirmation e-mail. Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(a1albemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Tuesday, July 17, 2018 3:50 PM To: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org>; Siri Russell <srussell@albemarle.org> Subject: Claudette Borgersen made a change to Special Exception, Brookhill ZMA201500007 (setbacks) Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Claudette Borgersen has changed this agenda item: Change made: Moved from Aug 8 agenda and moved to September 5 agenda. Deadline to legal is 8/17. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 9/5/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Note to Clerk: My Board Agenda Items From: Sent: To: Cc: Subject: Hi Claudette, Cameron Langille Thursday, July 19, 2018 4:44 PM clerk Travis Morris RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item I am trying to verify whether the September 5t" BOS date is confirmed for this item? From: Cameron Langille Sent: Wednesday, July 11, 2018 4:03 PM To: clerk <clerk@albemarle.org> Cc: Travis Morris <tmorris2@albemarle.org> Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Claudette, It will need to go through legal I believe. I am going to go ahead and say that we should put this on the September 51" agenda if it can't go on the August 8t" agenda. It definitely will not be ready in time for the August 1 meeting. Let me know if this is okay. -Cameron From: Claudette Borgersen On Behalf Of clerk Sent: Wednesday, July 11, 2018 11:57 AM To: Cameron Langille <blangille@albemarle.org> Cc: Travis Morris <tmorris2@albemarle.org> Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Cameron, We are not having a regular meeting on August 8th, so it would be best to get it on to the Aug 1 agenda. If not, can it wait until September 5? The dates you provided are correct. Does this need to go through legal? If so, it would be due on July 13. Aug1 Legal 7/13 F Dep. Co 7/18 W Exec Co Exec 7/20 F Clerk 7/23 M Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(a)albemarle.org From: Cameron Langille Sent: Monday, July 9, 2018 3:16 PM To: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org> Cc: David Benish <DBENISH@albemarle.org> Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Claudette, I have a schedule here for special exceptions that go on the consent agenda, and it looks like I would need to have the staff report and materials to the County Executive for review by July 20th, and then the Clerk's office by July 23rd in order to get on the August 1 agenda. Is this an accurate timeline for the August 1 meeting, or could I get the staff report and special exception materials to you by a later date? The reason I'm asking is that it would be best if we can schedule this for the August 8th agenda. The applicants are still working on their materials that need to go with the special exception request, so I am at least a week away from having a staff report prepared for my supervisors to review. I don't think that I will have a staff report completed until probably the end of next week, if not sometime early in the week of July 23-27. The schedule I have also says that for the August 8th BOS meeting, I can send the staff report and special exception materials to the County Executive by July 27th, and the Clerk's office by July 30tn From: David Benish Sent: Friday, July 06, 2018 4:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item I'll let you respond to this. From: Claudette Borgersen Sent: Friday, July 06, 2018 2:49 PM To: David Benish <DBENISH@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi David, I'll have to see what the plans are for the Aug 8 meeting on Monday at our planning meeting. Could this go on the Aug 1 agenda? Or September 5 agenda? Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(c)albemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Friday, July 6, 2018 11:37 AM To: Megan Nedostup <mnedostup@albemarle.org>; David Benish <DBENISH@albemarle.org>; Doug Walker <dwalker3@albemarle.org>; Cameron Langille <blangille@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Siri Russell <srussell@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org> Subject: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 8/8/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Board action/outcome: action on special exception Note to Clerk: My Board Agenda Items From: Margaret Maliszewski Sent: Tuesday, July 17, 2018 5:08 PM To: 5th & Avon Community Advisory Committee; Amelia McCulley; Andrew Gast - Bray; Brent Nelson; Mark Graham; Places29 Hydraulic Community Advisory Committee; Places29 North Community Advisory Committee; Places29 Rio Community Advisory Committee; Pantops Community Advisory Council; Planning Commission; Sherry Short; Village of Rivanna Community Advisory Council Cc: Sharon Taylor Subject: ARB Action Memo July 16 2018 Attachments: x COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 (434) 296 - 5823 Fax (434) 972 - 4012 Date: July 16, 2018 Time: 1:00 PM Meeting Room: Room 241, Second Floor Members: Staff: ARB ACTION MEMO Frank Stoner: Absent Frank Hancock: Present Bruce Wardell, Chair: Present (Arrived at 1:04 p.m.) Stan Binsted, Vice Chair: Present Dade Van Der Werf: Present Heather McMahon Margaret Maliszewski Sharon Taylor CALL TO ORDER Mr. Binsted called the meeting to order at 1:03 p.m. and established a quorum. DISCLOSURES Mr. Binsted invited disclosures. There being none, the meeting moved to the next item. PUBLIC COMMENT Mr. Binsted invited public comment. There being none, the meeting proceeded. REGULAR REVIEW ITEMS a. ARB-2018-83: Brookhill Blocks 4A and 4B Final - Final Site Development Plan (046000000019A0, 046000000019131). Proposal: To develop blocks 4A and 4B with nine multi -family apartment buildings, parking areas, and associated improvements. Location: East side of Seminole Trail (Rt. 29 N) and north side of Polo Grounds Road (Rt. 643). Forest Lakes Community is to the north and Montgomery Ridge is to the east. The ARB offered the following comments on the proposal: 1. Submit material and color samples for review. 2. Revise the elevation sheets to include a key that illustrates to which building wall on the overall site plan the elevation corresponds. 3. Provide floor plans of each building, by floor, not the individual units. 4. Provide color renderings of Buildings A and B as seen from the entrance of Archer Avenue at Rt. 29 5. Add plantings as described for 30' within the VDOT right-of-way to screen the stormwater management facility, contingent on VDOT approval. 6. Clarify the metal eyebrow feature and provide a materials and color sample. 7. Include the location of the proposed mail kiosk and any other proposed accessory structure on the site plans (C-301 and C-302). 8. Provide additional evergreen landscaping in the vicinity of the trash compactor on block 4B to eliminate its visibility from the EC. Provide dumpster/compactor screening details in the plan. 9. Provide a roof plan and elevations that show all proposed roof -mounted mechanical equipment. Provide sight line drawings to confirm that the equipment can't be seen from the street. 10. Provide all proposed utilities on the Utility Plan (C-501 and C-502). 11. Provide the Existing Conditions and Demolition plans (C-201, C-202, and C-203) with a revised site plan set for review. 12. Provide the heights, materials, and details of any new proposed fencing on the site for review. Chain link is not appropriate. 13. Indicate the color of the retaining wall block on the plans. Provide a sample for review. Clarify if the wall detail applies to all proposed retaining walls. 14. Provide the standard mechanical equipment note in the General Notes on C-101 of the site plan set: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 15. Revise the lighting plan to eliminate spillover in excess of .5 fc at the property line along Stella Lane and Archer Avenue 16. Revise the lighting plans to include any proposed wall -mounted lighting. Submit manufacturer's specifications and cut sheets for any proposed wall -mounted lighting for review. 17. Provide total lumens in the luminaire schedule for all proposed lights. 18. Provide a cut sheet for all proposed fixture types showing all options chosen. Identify the color finishes in the cut sheets. 19. Provide a note on the lighting plan that 18 feet is the maximum mounting height from grade inclusive of the base. 20. Revise the architectural elevations of the buildings and structures to include the placement and mounting heights of the proposed light fixtures. 21. Provide photometric values for all proposed lights in which the LLF is equal to 1.0. 22. Rectify the lighting plans to illustrate the same number of proposed lighting fixtures as listed in the quantity field of the luminaire schedule. 23. Provide the standard lighting note on the lighting plans (C-704 and C-705): Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle. 24. Provide sufficient planting room between the west (side) elevation of the southwestern building [in Block 4B] and the eastern edge of the 30-foot planting buffer zone in order to ensure that the entirety of the 30-foot buffer is appropriately landscaped. 25. Provide the trees on Stella Lane and Archer Avenue at 2%" caliper at planting, spaced 40' on center on average. 26. Include the trees and shrubbery on Stella Lane and Archer Avenue to the plant schedules on the landscape plans (C-701, C-702, and C-703). Provide their botanical and common names, quantities, calipers. Alternatively, provide the road plans for ARB landscape review. 27. Provide additional perimeter parking trees so that the average planting distance is 40 feet on center. Ensure that the calipers for these trees are 2.5 inches at planting. 28. Provide 8 additional interior parking trees to Block 4B and 1 additional interior parking tree to Block 4A. 29. Ensure and demonstrate that there are no potential utility conflicts between the proposed locations of underground utilities and the proposed locations of large shade trees. 30. Provide the 50'-deep landscape buffer between the west (side) elevation of the northwestern building in Block 4B and the VDOT stormwater management facility as required by the Code of Development. Alternatively, plant 30' of buffer between the EC and the stormwater management facility. 31. Include viburnum x rhytidophyllum with the deciduous shrubs and betula nigra with large deciduous trees in all plant schedules. 32. Combine the two separate plant schedules on C-703. 33. Reduce the number of IGC and TMD so that they do not exceed the 25% of the total for that species (evergreen shrubs). 34. Provide the exact wording of the standard plant health note on the landscape plan: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 35. Address the rear yard setback minimum as required by the Code of Development. 36. Include a note with the retaining wall details indicating that the details apply to all proposed retaining walls. 37. Indicate on the plan the proposed color of the retaining wall block. Include a fence detail in the plan, including material and color. 38. Revise the site plans to show adequate tree protection fencing. 39. Provide a signed tree conservation checklist with the site plant set. 40. Show the 30-foot and 70-foot landscape buffer lines on the grading plans, C-401 and C-402. WORK SESSION a. ARB-2018-72: Pantops Corner Hotel Contacts: Justin Shimp, Mike McGowan, Nitin Kulkarni, Tarun Patel The ARB held a work session on the visibility and orientation of the proposed hotel relative to the Rt. 20 Entrance Corridor, based on new information submitted by the applicant. The ARB offered to hold another work session on the issue and provided the following comments: 1. The flat roof is an improvement. 2. Consider an alternate surface treatment for the wall area inside the frame. 3. Regarding the orientation of the building to Rt. 20, the terrace is a positive gesture, but there should be a response in the form and mass of the building, not just in the landscape. 4. Continue to study the impact of the height and scale. 5. The design does not appear to address several of the EC guidelines regarding landscaping and grading. 6. The character of the Rt. 250 EC differs from the character of the Rt. 20 EC. 7. An I -shaped, bent, or angled building configuration could address the Rt. 20 EC better. 8. Can the building step more? 9. The towers have visual weight that isn't supported from below. 10. Consider making the building elements relate thematically. OTHER BUSINESS a. Entrance Corridor Design Guidelines: Glass This item was deferred to the next ARB meeting. b. Approval of Minutes: 7-2-2018 Motion: Mr. Binsted moved for approval of the minutes for 7-2-2018. Mr. Hancock seconded the motion. The motion carried by a vote of 4:0. (Stoner absent) Next ARB Meeting: August 6, 2018, 1:00 p.m. Mr. Van Der Werf stated that he might not be able to attend the August 6 meeting. ADJOURNMENT The meeting was adjourned at 2:32 p.m. to the next ARB meeting on Monday, August 6, 2018 in Room 241, Second Floor, County Office Building at 1:00 p.m. Margaret Maliszewski, Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org From: Heather McMahon Sent: Tuesday, July 17, 2018 4:22 PM To: Cameron Langille Subject: Planning Application Review for SDP201800050 Brookhill Block 4 Cambo — Comments from the ARB meeting yesterday have been input into the review/comments field in County View. They will be coming back in late August/early September with revisions. Cheers, The Review for the following application has been completed: Application Number = SDP201800050 Reviewer = Heather McMahon Review Status = Requested Changes Completed Date = 07/17/2018 This email was sent from County View Production. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Monday, July 16, 2018 6:52 PM To: Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron. I'll get it submitted this week, including the variation request for the SWM landscaping buffer. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, July 16, 2018 6:08 PM To: Davies, Ashley <adavies@williamsmullen.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] If you can submit them by the end of Friday this week, that will give us a couple weeks to review the proposed changes before staff reports need to be completed. The absolute deadline for finishing the staff reports is August 13t". However, Zoning and Planning staff will be reviewing the variation request, and we may have some things that need to be revised in the request prior to finalizing staff reports and making a favorable recommendation. Also, did Heather McMahon speak with you today at the ARB meeting about the buffer around the VDOT pond? Rebecca confirmed that the Code requires a 50' landscaped buffer between the pond and Block 4. Based on the area of land available between the enlarged pond and the new buildings in Block 4, it doesn't look like the 50' will be met without approval of a variation to that buffer standard. In order to not cause further delays for the Block 4 final site plan approval, it would be best to submit a second variation request to the buffer standards at the same time as the setback variation. We could take both to the Board on September 5tn Let me know if you didn't get a chance to talk with Heather today and we can arrange a conference call or group email to talk about it more. -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Monday, July 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Okay, thanks. What is the deadline for materials for the Sept. BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCcawilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 16, 2018 3:46 PM To: Davies, Ashley <adavies@williamsmullen.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Yes, the deadline for our internal staff report completion in order to get on the consent agenda for August 1 was July 9th so there's no way to get this on that meeting date now. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 13, 2018 12:24 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks for the update, Cameron. I am assuming it is too late to be added to the consent agenda for the August 1ST BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCabwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Wednesday, July 11, 2018 4:47 PM To: Davies, Ashley <adavies@williamsmullen.com>; Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Cc: Rebecca Ragsdale <rragsdale@albemarle.org>; Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Alan, and Ryan, The Board of Supervisors Clerk contacted me this afternoon and the August 8th Board meeting is not one of their "regular meetings" where they typically handle approval of variation requests. I have not been told out right that we cannot schedule the variation request on the August 81h agenda, so I have asked the Clerk for verification that this is what they mean. I just wanted to let everyone know that the setback variation request may have to go before the Board at their September 5th meeting. I will contact everyone once the Clerk respond to me. The reviews of the Block 4 final site plan, Section 1 road plans, and Block 4 WPO plans will still move forward with staff on their normal timeline. There will just be a Planning review comment stating that the final site plan for Block 4 cannot be approved until the variation request is acted on by the Board. In theory, if the Board approves the variation request on September 5tn, the final site plan approval date could occur shortly after that as long as the WPO plans have been approved, the road plans have been approved and bonded, and all other Site Review Committee member comments have been addressed on the Block 4 final site plan. I would caution everyone to understand that the County's policy on issuing review comments is 21 days from submittal. The 21-day first review comment date for the Block 4 final site plan is July 23rd. At that point, it will be up to Bohler to revise the plans and send them back to us for another 21-day review period. So, if there are numerous outstanding comments on the final site plan that have not been addressed by September 5tn (other than the setback variation request), the final site plan may have to go through another round of reviews with the relevant staff members. I know this is a lot of information, so please do not hesitate to contact me with any questions. I hope you have a great afternoon. -Cameron From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 5tn -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCcbwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IW0VRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IW0VRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille Sent: Monday, July 16, 2018 6:08 PM To: Davies, Ashley Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] If you can submit them by the end of Friday this week, that will give us a couple weeks to review the proposed changes before staff reports need to be completed. The absolute deadline for finishing the staff reports is August 13t". However, Zoning and Planning staff will be reviewing the variation request, and we may have some things that need to be revised in the request prior to finalizing staff reports and making a favorable recommendation. Also, did Heather McMahon speak with you today at the ARB meeting about the buffer around the VDOT pond? Rebecca confirmed that the Code requires a 50' landscaped buffer between the pond and Block 4. Based on the area of land available between the enlarged pond and the new buildings in Block 4, it doesn't look like the 50' will be met without approval of a variation to that buffer standard. In order to not cause further delays for the Block 4 final site plan approval, it would be best to submit a second variation request to the buffer standards at the same time as the setback variation. We could take both to the Board on September 5tn Let me know if you didn't get a chance to talk with Heather today and we can arrange a conference call or group email to talk about it more. -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Monday, July 16, 2018 3:50 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Okay, thanks. What is the deadline for materials for the Sept. BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 16, 2018 3:46 PM To: Davies, Ashley <adavies@williamsmullen.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Yes, the deadline for our internal staff report completion in order to get on the consent agenda for August 1 was July 9t" so there's no way to get this on that meeting date now. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 13, 2018 12:24 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks for the update, Cameron. I am assuming it is too late to be added to the consent agenda for the August 1s' BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(&williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Wednesday, July 11, 2018 4:47 PM To: Davies, Ashley <adavies@williamsmullen.com>; Alan Taylor (aIan@riverbenddev.com) <alan@riverbenddev.com> Cc: Rebecca Ragsdale <rragsdale@albemarle.org>; Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Alan, and Ryan, The Board of Supervisors Clerk contacted me this afternoon and the August 8t" Board meeting is not one of their "regular meetings" where they typically handle approval of variation requests. I have not been told out right that we cannot schedule the variation request on the August 81" agenda, so I have asked the Clerk for verification that this is what they mean. I just wanted to let everyone know that the setback variation request may have to go before the Board at their September 5t" meeting. I will contact everyone once the Clerk respond to me. The reviews of the Block 4 final site plan, Section 1 road plans, and Block 4 WPO plans will still move forward with staff on their normal timeline. There will just be a Planning review comment stating that the final site plan for Block 4 cannot be approved until the variation request is acted on by the Board. In theory, if the Board approves the variation request on September 5t", the final site plan approval date could occur shortly after that as long as the WPO plans have been approved, the road plans have been approved and bonded, and all other Site Review Committee member comments have been addressed on the Block 4 final site plan. I would caution everyone to understand that the County's policy on issuing review comments is 21 days from submittal. The 21-day first review comment date for the Block 4 final site plan is July 23rd. At that point, it will be up to Bohler to revise the plans and send them back to us for another 21-day review period. So, if there are numerous outstanding comments on the final site plan that have not been addressed by September 5t" (other than the setback variation request), the final site plan may have to go through another round of reviews with the relevant staff members. I know this is a lot of information, so please do not hesitate to contact me with any questions. I hope you have a great afternoon. -Cameron From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 5tn -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(�bwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies0bwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Monday, July 16, 2018 3:50 PM To: Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Okay, thanks. What is the deadline for materials for the Sept. BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, July 16, 2018 3:46 PM To: Davies, Ashley <adavies@williamsmullen.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Yes, the deadline for our internal staff report completion in order to get on the consent agenda for August 1 was July 91h so there's no way to get this on that meeting date now. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 13, 2018 12:24 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks for the update, Cameron. I am assuming it is too late to be added to the consent agenda for the August 1" BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(�bwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Wednesday, July 11, 2018 4:47 PM To: Davies, Ashley <adavies@williamsmullen.com>; Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Cc: Rebecca Ragsdale <rragsdale@albemarle.org>; Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Alan, and Ryan, The Board of Supervisors Clerk contacted me this afternoon and the August 8t" Board meeting is not one of their "regular meetings" where they typically handle approval of variation requests. I have not been told out right that we cannot schedule the variation request on the August 8t" agenda, so I have asked the Clerk for verification that this is what they mean. I just wanted to let everyone know that the setback variation request may have to go before the Board at their September 5t" meeting. I will contact everyone once the Clerk respond to me. The reviews of the Block 4 final site plan, Section 1 road plans, and Block 4 WPO plans will still move forward with staff on their normal timeline. There will just be a Planning review comment stating that the final site plan for Block 4 cannot be approved until the variation request is acted on by the Board. In theory, if the Board approves the variation request on September 5t", the final site plan approval date could occur shortly after that as long as the WPO plans have been approved, the road plans have been approved and bonded, and all other Site Review Committee member comments have been addressed on the Block 4 final site plan. I would caution everyone to understand that the County's policy on issuing review comments is 21 days from submittal. The 21-day first review comment date for the Block 4 final site plan is July 23rd. At that point, it will be up to Bohler to revise the plans and send them back to us for another 21-day review period. So, if there are numerous outstanding comments on the final site plan that have not been addressed by September 5t" (other than the setback variation request), the final site plan may have to go through another round of reviews with the relevant staff members. I know this is a lot of information, so please do not hesitate to contact me with any questions. I hope you have a great afternoon. -Cameron From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 5tn -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCa)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Aoolication Plans Codes and Standards of Develobment.odf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille Sent: Monday, July 16, 2018 3:46 PM To: Davies, Ashley Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Yes, the deadline for our internal staff report completion in order to get on the consent agenda for August 1 was July 9th so there's no way to get this on that meeting date now. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 13, 2018 12:24 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks for the update, Cameron. I am assuming it is too late to be added to the consent agenda for the August 1st BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Wednesday, July 11, 2018 4:47 PM To: Davies, Ashley <adavies@williamsmullen.com>; Alan Taylor (alan@riverbenddev.com) <alan@riverbenddev.com> Cc: Rebecca Ragsdale <rragsdale@albemarle.org>; Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Alan, and Ryan, The Board of Supervisors Clerk contacted me this afternoon and the August 81h Board meeting is not one of their "regular meetings" where they typically handle approval of variation requests. I have not been told out right that we cannot schedule the variation request on the August 8th agenda, so I have asked the Clerk for verification that this is what they mean. I just wanted to let everyone know that the setback variation request may have to go before the Board at their September 5th meeting. I will contact everyone once the Clerk respond to me. The reviews of the Block 4 final site plan, Section 1 road plans, and Block 4 WPO plans will still move forward with staff on their normal timeline. There will just be a Planning review comment stating that the final site plan for Block 4 cannot be approved until the variation request is acted on by the Board. In theory, if the Board approves the variation request on September 5th, the final site plan approval date could occur shortly after that as long as the WPO plans have been approved, the road plans have been approved and bonded, and all other Site Review Committee member comments have been addressed on the Block 4 final site plan. I would caution everyone to understand that the County's policy on issuing review comments is 21 days from submittal. The 21-day first review comment date for the Block 4 final site plan is July 23rd. At that point, it will be up to Bohler to revise the plans and send them back to us for another 21-day review period. So, if there are numerous outstanding comments on the final site plan that have not been addressed by September 5t" (other than the setback variation request), the final site plan may have to go through another round of reviews with the relevant staff members. I know this is a lot of information, so please do not hesitate to contact me with any questions. I hope you have a great afternoon. -Cameron From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: 'Davies, Ashley' <adavies@wilIiamsmuIlen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IW0VRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 51n -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesawilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IW0VRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(a)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 13, 2018 12:24 PM To: Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks for the update, Cameron. I am assuming it is too late to be added to the consent agenda for the August 1st BOS meeting? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Wednesday, July 11, 2018 4:47 PM To: Davies, Ashley <adavies@williamsmullen.com>; Alan Taylor (aIan@riverbenddev.com) <alan@riverbenddev.com> Cc: Rebecca Ragsdale <rragsdale@albemarle.org>; Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Alan, and Ryan, The Board of Supervisors Clerk contacted me this afternoon and the August 8t" Board meeting is not one of their "regular meetings" where they typically handle approval of variation requests. I have not been told out right that we cannot schedule the variation request on the August 8t" agenda, so I have asked the Clerk for verification that this is what they mean. I just wanted to let everyone know that the setback variation request may have to go before the Board at their September 5t" meeting. I will contact everyone once the Clerk respond to me. The reviews of the Block 4 final site plan, Section 1 road plans, and Block 4 WPO plans will still move forward with staff on their normal timeline. There will just be a Planning review comment stating that the final site plan for Block 4 cannot be approved until the variation request is acted on by the Board. In theory, if the Board approves the variation request on September 5t", the final site plan approval date could occur shortly after that as long as the WPO plans have been approved, the road plans have been approved and bonded, and all other Site Review Committee member comments have been addressed on the Block 4 final site plan. I would caution everyone to understand that the County's policy on issuing review comments is 21 days from submittal. The 21-day first review comment date for the Block 4 final site plan is July 23rd. At that point, it will be up to Bohler to revise the plans and send them back to us for another 21-day review period. So, if there are numerous outstanding comments on the final site plan that have not been addressed by September 5t" (other than the setback variation request), the final site plan may have to go through another round of reviews with the relevant staff members. I know this is a lot of information, so please do not hesitate to contact me with any questions. I hope you have a great afternoon. -Cameron From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 5tn -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(�bwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies0bwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille Sent: Wednesday, July 11, 2018 4:47 PM To: Davies, Ashley; Alan Taylor (alan@riverbenddev.com) Cc: Rebecca Ragsdale; Ryan Yauger Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, Alan, and Ryan, The Board of Supervisors Clerk contacted me this afternoon and the August 8t" Board meeting is not one of their "regular meetings" where they typically handle approval of variation requests. I have not been told out right that we cannot schedule the variation request on the August 81" agenda, so I have asked the Clerk for verification that this is what they mean. I just wanted to let everyone know that the setback variation request may have to go before the Board at their September 5t" meeting. I will contact everyone once the Clerk respond to me. The reviews of the Block 4 final site plan, Section 1 road plans, and Block 4 WPO plans will still move forward with staff on their normal timeline. There will just be a Planning review comment stating that the final site plan for Block 4 cannot be approved until the variation request is acted on by the Board. In theory, if the Board approves the variation request on September 5t", the final site plan approval date could occur shortly after that as long as the WPO plans have been approved, the road plans have been approved and bonded, and all other Site Review Committee member comments have been addressed on the Block 4 final site plan. I would caution everyone to understand that the County's policy on issuing review comments is 21 days from submittal. The 21-day first review comment date for the Block 4 final site plan is July 23". At that point, it will be up to Bohler to revise the plans and send them back to us for another 21-day review period. So, if there are numerous outstanding comments on the final site plan that have not been addressed by September 5t" (other than the setback variation request), the final site plan may have to go through another round of reviews with the relevant staff members. I know this is a lot of information, so please do not hesitate to contact me with any questions. I hope you have a great afternoon. -Cameron From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: 'Davies, Ashley' <adavies@wilIiamsmuIlen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 51n -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCabwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <ragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@wilIiamsmuIlen.com>; Rebecca Ragsdale <ragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(a)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Sent: To: Cc: Subject: Hi Claudette, Cameron Langille Wednesday, July 11, 2018 4:03 PM clerk Travis Morris RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item It will need to go through legal I believe. I am going to go ahead and say that we should put this on the September 5t" agenda if it can't go on the August 81" agenda. It definitely will not be ready in time for the August 1 meeting. Let me know if this is okay. -Cameron From: Claudette Borgersen On Behalf Of clerk Sent: Wednesday, July 11, 2018 11:57 AM To: Cameron Langille <blangille@albemarle.org> Cc: Travis Morris <tmorris2@albemarle.org> Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Cameron, We are not having a regular meeting on August 8t", so it would be best to get it on to the Aug 1 agenda. If not, can it wait until September 5? The dates you provided are correct. Does this need to go through legal? If so, it would be due on July 13. Aug1 Legal 7/13 F Dep. Co Exec 7/18 W Co Exec 7/20 F Clerk 7/23 M Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(a�albemarle.org From: Cameron Langille Sent: Monday, July 9, 2018 3:16 PM To: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org> Cc: David Benish <DBENISH@albemarle.org> Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Claudette, I have a schedule here for special exceptions that go on the consent agenda, and it looks like I would need to have the staff report and materials to the County Executive for review by July 20th, and then the Clerk's office by July 23rd in order to get on the August 1 agenda. Is this an accurate timeline for the August 1 meeting, or could I get the staff report and special exception materials to you by a later date? The reason I'm asking is that it would be best if we can schedule this for the August 8th agenda. The applicants are still working on their materials that need to go with the special exception request, so I am at least a week away from having a staff report prepared for my supervisors to review. I don't think that I will have a staff report completed until probably the end of next week, if not sometime early in the week of July 23-27. The schedule I have also says that for the August 81h BOS meeting, I can send the staff report and special exception materials to the County Executive by July 27th, and the Clerk's office by July 30tn From: David Benish Sent: Friday, July 06, 2018 4:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item I'll let you respond to this. From: Claudette Borgersen Sent: Friday, July 06, 2018 2:49 PM To: David Benish <DBENISH@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi David, I'll have to see what the plans are for the Aug 8 meeting on Monday at our planning meeting. Could this go on the Aug 1 agenda? Or September 5 agenda? Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(abalbemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Friday, July 6, 2018 11:37 AM To: Megan Nedostup <mnedostup@albemarle.org>; David Benish <DBENISH@albemarle.org>; Doug Walker <dwalker3@albemarle.org>; Cameron Langille <blangille@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Siri Russell <srussell@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org> Subject: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 8/8/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Board action/outcome: action on special exception Note to Clerk: My Board Agenda Items From: Sent: To: Cc: Subject: Hi Cameron, Claudette Borgersen on behalf of clerk Wednesday, July 11, 2018 11:57 AM Cameron Langille Travis Morris RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item We are not having a regular meeting on August 8t", so it would be best to get it on to the Aug 1 agenda. If not, can it wait until September 5? The dates you provided are correct. Does this need to go through legal? If so, it would be due on July 13. Aug1 Legal 7/13 F Dep. Co Exec 7/18 W Co Exec 7/20 F Clerk 7/23 M Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(a-)albemarle.org From: Cameron Langille Sent: Monday, July 9, 2018 3:16 PM To: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org> Cc: David Benish <DBENISH@albemarle.org> Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Claudette, I have a schedule here for special exceptions that go on the consent agenda, and it looks like I would need to have the staff report and materials to the County Executive for review by July 20th, and then the Clerk's office by July 23rd in order to get on the August 1 agenda. Is this an accurate timeline for the August 1 meeting, or could I get the staff report and special exception materials to you by a later date? The reason I'm asking is that it would be best if we can schedule this for the August 8th agenda. The applicants are still working on their materials that need to go with the special exception request, so I am at least a week away from having a staff report prepared for my supervisors to review. I don't think that I will have a staff report completed until probably the end of next week, if not sometime early in the week of July 23-27. The schedule I have also says that for the August 8th BOS meeting, I can send the staff report and special exception materials to the County Executive by July 27th, and the Clerk's office by July 30tn From: David Benish Sent: Friday, July 06, 2018 4:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item I'll let you respond to this. From: Claudette Borgersen Sent: Friday, July 06, 2018 2:49 PM To: David Benish <DBENISH@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi David, I'll have to see what the plans are for the Aug 8 meeting on Monday at our planning meeting. Could this go on the Aug 1 agenda? Or September 5 agenda? Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(c)albemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Friday, July 6, 2018 11:37 AM To: Megan Nedostup <mnedostup@albemarle.org>; David Benish <DBENISH@albemarle.org>; Doug Walker <dwalker3@albemarle.org>; Cameron Langille <blangille@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Siri Russell <srussell@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org> Subject: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 8/8/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Board action/outcome: action on special exception Note to Clerk: My Board Agenda Items From: Cameron Langille Sent: Wednesday, July 11, 2018 10:41 AM To: Davies, Ashley; Rebecca Ragsdale Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Ashley, I've spoken with the Board clerk and the only possible date we can take this to the Board in August would be the August 8. This is due to our internal deadlines for getting variation requests to the County Attorney and County Executives for review. If the application isn't submitted by end of business Monday, the next available Board date would be September 5cn -Cameron From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(a)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IW0VRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(a)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCcbwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Tuesday, July 10, 2018 1:52 PM To: Cameron Langille; Rebecca Ragsdale Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks, Cameron and Rebecca. I appreciate your assistance. We should have something in for your review within the next few days. Do you have any feedback on the scheduling for Board of Supervisors? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, July 9, 2018 11:37 AM To: Davies, Ashley <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@williamsmullen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCabwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IW0VRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IW0VRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IW0VRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCbwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Cameron Langille Sent: Monday, July 09, 2018 3:16 PM To: Claudette Borgersen; Travis Morris Cc: David Benish Subject: RE: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi Claudette, I have a schedule here for special exceptions that go on the consent agenda, and it looks like I would need to have the staff report and materials to the County Executive for review by July 201h, and then the Clerk's office by July 23rd in order to get on the August 1 agenda. Is this an accurate timeline for the August 1 meeting, or could I get the staff report and special exception materials to you by a later date? The reason I'm asking is that it would be best if we can schedule this for the August 8th agenda. The applicants are still working on their materials that need to go with the special exception request, so I am at least a week away from having a staff report prepared for my supervisors to review. I don't think that I will have a staff report completed until probably the end of next week, if not sometime early in the week of July 23-27. The schedule I have also says that for the August 8th BOS meeting, I can send the staff report and special exception materials to the County Executive by July 27th, and the Clerk's office by July 30tn From: David Benish Sent: Friday, July 06, 2018 4:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item I'll let you respond to this. From: Claudette Borgersen Sent: Friday, July 06, 2018 2:49 PM To: David Benish <DBENISH@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi David, I'll have to see what the plans are for the Aug 8 meeting on Monday at our planning meeting. Could this go on the Aug 1 agenda? Or September 5 agenda? Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen(abalbemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Friday, July 6, 2018 11:37 AM To: Megan Nedostup <mnedostup@albemarle.org>; David Benish <DBENISH@albemarle.org>; Doug Walker <dwalker3@albemarle.org>; Cameron Langille <blangille@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Siri Russell <srussell@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org> Subject: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 8/8/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Board action/outcome: action on special exception Note to Clerk: My Board Agenda Items From: Cameron Langille Sent: Monday, July 09, 2018 11:37 AM To: Davies, Ashley; Rebecca Ragsdale Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Attachments: KDP2019000SO Rear Setback Variation Request Fxh� Ashley, Please note that for the rear setback variation request, there are three buildings within Block 4 that the minimum 10' rear setback applies to. I have attached a PDF markup of the final site plan for your reference that states the proposed setbacks as shown on the site plan, and the required setbacks per the Code of Development. Please let me know if you have any questions about the PDF, or what kinds of exhibits you should include with the variation request. Thanks, Cameron From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: 'Davies, Ashley' <adavies@wilIiamsmuIlen.com>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCcawilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCcbwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IW0VRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(&williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Heather McMahon Sent: Monday, July 09, 2018 9:55 AM To: Rebecca Ragsdale Cc: Cameron Langille Subject: RE: Brookhill, Block 4, proffer question Yes, I have elevations. My staff report is due to the ARB by the end of today, which is why I had hoped we could get together today; I don't have to bring this to the ARB's attention, because it's more to do with the Code of Development than the EC Design Guidelines, but we (you, me, Cameron) should figure out how we want to interpret that language in this case. Let me know when you're available. Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Rebecca Ragsdale Sent: Monday, July 09, 2018 8:50 AM To: Heather McMahon <hmcmahon@albemarle.org> Subject: Re: Brookhill, Block 4, proffer question Tomorrow would be better. Do you have a building elevation for us to look at? From: Heather McMahon Sent: Friday, July 6, 2018 5:41:11 PM To: Rebecca Ragsdale Cc: Cameron Langille Subject: Brookhill, Block 4, proffer question Hi Rebecca, If you have time on Monday, could we please get together with Cameron to go over a question I have about max building heights in Block 4? On page 17 of the Code of Development, it says that the max height of buildings in block 4 are 4 stories or 60 feet, but 5 stories or 70 feet can be approved by special exception. What is your determination of a building that appears to have 5 habitable stories but is a max height of 53 feet from grade? It's under 60 feet, but it does have 5 discernable stories — would that mean a special exception is required? Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: Emily Cox Sent: Monday, July 09, 2018 9:01 AM To: Cameron Langille; Frank Pohl Subject: RE: Brookhill Apartments and Filterra Bioscape I haven't gotten too far into the reviews yet. It sounds like they are proposing to use a "proprietary measure" which has not yet been approved by DEQ. Glen is their salesman, just so you know. I will check in with Frank on this. Thanks, Emily Cox, PE Civil Engineer II (434) 296-5832 Ext. 3565 401 McIntire Rd. Charlottesivlle, VA 22902 www.albemarle.org From: Cameron Langille Sent: Friday, July 06, 2018 4:34 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org> Subject: FW: Brookhill Apartments and Filterra Bioscape Hi guys, Do either of you know if the Filterra Bioscape in VADEQ Bioretention Level II has been approved by the us for Brookhill? I assume this is tied to one of our WPOs currently in review. From: Payton, Glen [mailto:GPayton@conteches.com] Sent: Friday, July 06, 2018 4:22 PM To: Cameron Langille <blangille@albemarle.org> Subject: Fwd: Brookhill Apartments and Filterra Bioscape Cameron - I tried Mr. Pohl earlier today. Could you advise on whether the Filterra Bioscape in VADEQ Bioretention Level II has been approved by the county on the subject project? Frank might NOT have gotten through his decision process yet but in case he had I thought I would ask for your input. Thx much. Glen Payton Stormwater Consultant, western VA Contech 804-937-3228 Please excuse any typos Sent from my iPhone Begin forwarded message: From: "Payton, Glen" <GPayton @conteches.com> Date: July 6, 2018 at 3:28:10 PM EDT To: Frank Pohl <fpohl@albemarle.org> Subject: RE: Brookhill Apartments and Filterra Bioscape Frank —just a heads up that I will be in your area and planned to drop in about 4 pm today to see if we can tell our eng. Clients anything about their Stormwater design. Thx much for your time. Glen Payton, P.E. *, CPSWQ Stormwater Consultant, western VA, GA & AL Contech Engineered Solutions LLC 804-937-3228 gpayton .conteches.com www.ContechES.com *Licensed in Virginia From: Payton, Glen Sent: Thursday, June 28, 2018 11:48 AM To: Frank Pohl <fpohl@albemarle.org> Subject: Brookhill Apartments and Filterra Bioscape Frank — good to chat with you this morning. Per your request, below is a list of personnel whom you could speak with regarding Filterra Bioscape in VADEQ Bioretention Level I or Level II designs. Unfortunately we don't have any projects in the ground at these jurisdictions but we have had several near misses, where the project was cancelled, nutrient credits were used , etc. Brian Stokes Campbell County Environmental Manager, CFM (434) 332-9506 brstokes@co.campbell.va.us Joe Daft City of Bristol City Engineer (276) 645-7247 ioseph.daft@bristolva.org Wallace McCullough City of Bristol Public Works Director (276) 642-2316 waIlace.mccuIloch@bristolva.org John Burke Montgomery County Stormwater Specialist (540) 394- 2090 burkeiw@montgomerycountyva.gov Clegg Williams Smyth County Zoning Administrator (276) 706-8315 cwilliams@smythcounty.org Glen Payton, P.E. *, CPSWQ Stormwater Consultant, western VA, GA & AL Contech Engineered Solutions LLC 804-937-3228 gpayton(cDconteches.com www.ContechES.com *Licensed in Virginia This email may contain confidential and/or privileged information. If you are not the intended recipient, you are hereby notified that retention, dissemination, or copying of this communication is prohibited. If you have received this email in error, please notify the sender by reply email and permanently delete this email and any attachments. Thank you. From: Heather McMahon Sent: Friday, July 06, 2018 5:41 PM To: Rebecca Ragsdale Cc: Cameron Langille Subject: Brookhill, Block 4, proffer question Hi Rebecca, If you have time on Monday, could we please get together with Cameron to go over a question I have about max building heights in Block 4? On page 17 of the Code of Development, it says that the max height of buildings in block 4 are 4 stories or 60 feet, but 5 stories or 70 feet can be approved by special exception. What is your determination of a building that appears to have 5 habitable stories but is a max height of 53 feet from grade? It's under 60 feet, but it does have 5 discernable stories — would that mean a special exception is required? Thanks, Heather McMahon, Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3278 hmcmahon@albemarle.org From: David Benish Sent: Friday, July 06, 2018 4:59 PM To: Cameron Langille Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item I'll let you respond to this. From: Claudette Borgersen Sent: Friday, July 06, 2018 2:49 PM To: David Benish <DBENISH@albemarle.org> Subject: FW: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Hi David, I'll have to see what the plans are for the Aug 8 meeting on Monday at our planning meeting. Could this go on the Aug 1 agenda? Or September 5 agenda? Best Regards, Claudette K. Borgersen Clerk, Albemarle County Board of Supervisors County of Albemarle 401 McIntire Road Charlottesville, Virginia 22902 (434) 296-5843 ext. 3405 cborgersen .albemarle.org From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Friday, July 6, 2018 11:37 AM To: Megan Nedostup <mnedostup@albemarle.org>; David Benish <DBENISH@albemarle.org>; Doug Walker <dwalker3@albemarle.org>; Cameron Langille <blangille@albemarle.org>; Cameron Langille <blangille@albemarle.org> Cc: Claudette Borgersen <cborgersen@albemarle.org>; Travis Morris <tmorris2@albemarle.org>; Siri Russell <srussell@albemarle.org>; Cheryl Skeen <cskeen@albemarle.org> Subject: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 8/8/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Board action/outcome: action on special exception Note to Clerk: My Board Agenda Items From: Cameron Langille Sent: Friday, July 06, 2018 3:39 PM To: Davies, Ashley; Rebecca Ragsdale Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] The Director used to be able to handle these administratively. But as you mentioned, we now have to take variations to the Board because of the Sinclair case. From: Davies, Ashley [mailto:adavies@williamsmullen.com] Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale [mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IW0V-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesCcawilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 3:05 PM To: Rebecca Ragsdale; Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks. I was hoping to understand whether the Director still handles any of the variations, or if the all must go the Board because of Sinclair. Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale [mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:32 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(�bwilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale Sent: Friday, July 06, 2018 2:32 PM To: Ashley Davies; Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Yes, it still applies. This is our generic form and you would follow 8.5.5.3 for submitting the justification for the variation. Hope this helps. Sorry I had to leave the meeting early this morning! From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale <rragsdale@albemarle.org>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies(@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale[mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IW0VRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:09 PM To: Rebecca Ragsdale; Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Thanks —does 8.5.5.3 still apply? Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale [mailto:rragsdale@albemarle.org] Sent: Friday, July 6, 2018 2:08 PM To: Davies, Ashley <adavies@williamsmullen.com>; Cameron Langille <blangille@albemarle.org> Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.31 is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adaviesC-Owilliamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Rebecca Ragsdale Sent: Friday, July 06, 2018 2:08 PM To: Ashley Davies; Cameron Langille Subject: RE: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] This is the current form: http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Special Exception Application.pdf From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille <blangille@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org> Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies0)williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Davies, Ashley <adavies@williamsmullen.com> Sent: Friday, July 06, 2018 2:05 PM To: Cameron Langille; Rebecca Ragsdale Subject: Brookhill Variation Requests [IWOV-IWOVRIC.FID1700518] Hi Cameron and Rebecca, I wanted to confirm that the link below is the appropriate application form for variation requests. The form doesn't specify a fee or number of copies needed, so if there is another form, please let me know. Per 8.5.5.3, is the Director allowed to approve our variation request? Thanks! http://www.albemarle.org/upload/images/forms center/departments/Community Development/form s/applications/Variation from Application Plans Codes and Standards of Development.pdf Ashley Cooper Davies I Land Use Planner I Williams Mullen 321 East Main St. Suite 400 1 Charlottesville, VA 22902-3200 T 434.951.5725 1 F 434.817.0977 1 adavies@williamsmullen.com I www.williamsmullen.com NOTICE: Information contained in this transmission to the named addressee is proprietary and is subject to attorney -client privilege and work product confidentiality. If the recipient of this transmission is not the named addressee, the recipient should immediately notify the sender and destroy the information transmitted without making any copy or distribution thereof. From: Office of the Clerk <no-reply@sharepointonline.com> Sent: Friday, July 06, 2018 11:37 AM To: Megan Nedostup; David Benish; Doug Walker; Cameron Langille; Cameron Langille Cc: Claudette Borgersen; Travis Morris; Siri Russell; Cheryl Skeen Subject: David Benish has requested Special Exception, Brookhill ZMA201500007 (setbacks) as a future Board agenda item Please do not reply to this message as it was sent from an unmonitored account. If you have questions about this e-mail or the board agenda item request process, contact the Office of the Clerk. Agenda item title: Special Exception, Brookhill ZMA201500007 (setbacks) Board mtg date: 8/8/2018 12:00:00 AM Board action/outcome: action on special exception Urgent? Yes Agenda category: Consent Agenda:For Approval Time needed: 0 mins (e.g., consent item) ES required? No TS required? No Special Exception Memorandum required? Yes Legal review required? No Primary author: Cameron Langille Name(s) of contributing author(s): ; ; ; ; Primary presenter: Cameron Langille Name of additional presenter: Dept head: Megan Nedostup CE lead: Doug Walker Item requested by: David Benish Board action/outcome: action on special exception Note to Clerk: My Board Agenda Items From: Cameron Langille Sent: Friday, July 06, 2018 8:38 AM To: Ryan Yauger Subject: FW: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Ryan, Please see the review comments from ACSA below regarding the Brookhill Block 4 final site plan. Thanks, Cameron From: Richard Nelson [mailto:rnelson@serviceauthority.org] Sent: Friday, July 06, 2018 8:26 AM To: Cameron Langille <blangille@albemarle.org> Subject: RE: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Cameron, SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan is currently under water and sewer review. Approval of this plan is contingent on the approval of the Polo Grounds Road and Brookhill Section 1 Road Plans. An updated master plan and hydraulic model will be required prior to final approval. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Moore, Adam PE (VDOT) <Adam.Moore@vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. http://www.abemarle.org/weblink/search.aspx?dbid=3&searchcommand=%7b%5bCDD- Planning%5d:%5bApplicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Richard Nelson <rnelson@serviceauthority.org> Sent: Friday, July 06, 2018 8:26 AM To: Cameron Langille Subject: RE: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Cameron, SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan is currently under water and sewer review. Approval of this plan is contingent on the approval of the Polo Grounds Road and Brookhill Section 1 Road Plans. An updated master plan and hydraulic model will be required prior to final approval. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl <fpohl@albemarle.org>; Emily Cox <ecox@albemarle.org>; Matthew Wentland <mwentland@albemarle.org>; John Anderson <janderson2@albemarle.org>; Shawn Maddox <smaddox@albemarle.org>; Michael Dellinger <mdellinger@albemarle.org>; Elise Kiewra <ekiewra@albemarle.org>; Heather McMahon <hmcmahon@albemarle.org>; Margaret Maliszewski <MMaliszewski@albemarle.org>; Rebecca Ragsdale <rragsdale@albemarle.org>; Richard Nelson <rnelson@serviceauthority.org>; Moore, Adam PE (VDOT) <Adam.Moore @vdot.virginia.gov> Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. httr)://www.albemarle.ore/weblink/search.asr)x?dbid=3&searchcommand=%7b%SbCDD- Planning%5d:%SbApplicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Jennifer Smith - CDD - Planning Sent: Tuesday, July 03, 2018 9:15 AM To: Cameron Langille Subject: RE: Brookhill Fees So the check they submitted on Thursday for $1,713 was not for SDP2018-49? Thank you Jen From: Cameron Langille Sent: Thursday, June 28, 2018 5:49 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: FW: Brookhill Fees Jen, Based on Ryan's response, please let me know ASAP about creating an entry into CV for the Block 4 final site plan as I mentioned in my email to you earlier. They will be submitting the Block 3A final site plan check later. From: Cameron Langille Sent: Thursday, June 28, 2018 5:47 PM To: 'Ryan Yauger' <ryauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: RE: Brookhill Fees Thanks Ryan! From: Ryan Yauger [mailto:ryauger@bohlereng.com] Sent: Thursday, June 28, 2018 5:46 PM To: Cameron Langille <blangille@albemarle.org>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Brookhill Fees Yes, that is the case, the apartments should be ready for distribution now. Thank you! From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Thursday, June 28, 2018 5:30 PM To: Ryan Yauger <ryauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: Brookhill Fees Good Evening Ryan & Brandy, Today we received one check for final site plan fee payment. Can you verify that the check was supposed to cover the Block 4 final site plan fee, and not the Block 3A? -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, July 03, 2018 8:10 AM To: Cameron Langille Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments WPO Plan From: Jennifer Smith - CDD - Planning Sent: Thursday, June 28, 2018 3:23 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: I put the folder in your mailbox. Thank you! Jen From: Jennifer Smith - CDD - Planning Sent: Thursday, June 28, 2018 2:35 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Good afternoon Cameron: I have received the payment for the Site plan for Brookhill (Ice Rink). Do you want me to put the submittal date for June 25tn Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 4:03 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan It's not your fault so don't apologize!! I've spoken with the engineer at Bohler, Ryan Yauger, who is working on all of these plans. I told him that once they pay the fee for the final site plan for the Block 4 apartments, that I would distribute the plans to all the reviewers. That's a slight break from our normal distribution protocol (usually we would wait to distribute the plans until the following Tuesday after they pay the fees), so that is my main concern is getting the final site plan fee paid. The WPO plans aren't as much of a hurry. Thanks for all of your work and just keep me posted! From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 3:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Ok. I just received the payment for both the WPO applications, (Ice Rink & Block 4 apartments). I just emailed Mr. Booker back because the application for the apartments that they attached is actually the once for the ice rink also. So I have them hopefully emailing me the corrected application so I can take care of this one also. The one for the Ice Rink is in now (WPO2018-50). The application for the Final Site plan, the fees still haven't been paid for that one, so it's still at a standstill. Sorry for this mess. Thank you so much for your help with these. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <Ismith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; ismith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER I N G I\ I- l: R I Nt G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 46 - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 I PM 250 KB Application.pdf From: Cameron Langille Sent: Monday, July 02, 2018 3:00 PM To: Frank Pohl; Emily Cox; Matthew Wentland; John Anderson; Shawn Maddox; Michael Dellinger; Elise Kiewra; Heather McMahon; Margaret Maliszewski; Rebecca Ragsdale; Richard Nelson; Moore, Adam PE (VDOT) Subject: SDP201800050 - Brookhill Block 4A and 4B Apartments - Final Site Plan - Electronic Review Good Afternoon, You all should have just received an email from Bluebeam for an invitation to a studio review session for the Brookhill Block 4A/4B Apartments Final Site Plan. This is an electronic review. The Bluebeam studio session number is 085-740-851. A PDF of the final site plan is available for you to view in the Bluebeam session. Your review comments are due to me by Monday, July 23, 2018. You may enter your comments into Countyview under your name or send them directly to me via email. For those of you who do not have Bluebeam review software, please use the following link to the Countyview system to access a PDF of the final site plan. Please be aware that this is a large file and it will take several moments to load in your web browser. httr)://www.aIbemarle.ore/weblink/search.asr)x?dbid=3&searchcommand=%7b%SbCDD- Planning%5d:%SbAaalicationNumber%5d=%22SDP201800050%22%7d Please let me know if you have problems accessing the PDF file and starting your review. Thanks, Cameron Cameron Langille Senior Planner Department of Community Development Albemarle County, VA 434-296-5832 (ext. 3432) blangille@albemarle.org From: Jennifer Pritchett Sent: Monday, July 02, 2018 10:36 AM To: Cameron Langille; Patricia Saternye Subject: FW: file to flatten Ok. So all files have been uploaded. SDP2018-00050. From: Gus Colom Sent: Monday, July 02, 2018 8:55 AM To: Jennifer Pritchett <jpritchett@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Which permit is it supposed to be on? bus CO/OM Systems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.alkemarle.org 'Always do rght This will ratify some peof'le 3ncl3st017i6k the rest. „ Mark Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to Provide feedback From: Jennifer Pritchett Sent: Monday, July 02, 2018 8:36 AM To: Gus Colom <GCOLOM@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Good morning Gus, I am getting the same error message. Jen From: Gus Colom Sent: Friday, June 29, 2018 1:00 PM To: Jennifer Pritchett <jpritchett@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Importance: High Ok Jennifer I have reduced the size of the original pdf It's now located in \\cob fs01Wol3\DEPT\Community Development\Information Services Division\Records Management And is called 18O612_Final_Site_Plan-Section_1_Block_4A_and_4B.pdf Try to upload it and let me know how it goes. GU5 Colour Jam' ystems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.albemarle.or� ,A)watJ, s oho r�tit. TAis will,Yratif some f coPle and astonish Me rest." Mark Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to provide feedback From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:30 AM To: Gus Colour <GCOLOM@albemarle.org> Subject: file to flatten I:\DEPT\Community Development\Information Services Division Thank you! Jennifer Pritchett Intake/Support Specialist Community Development fi • aY�RGITI�*` Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 3072 From: Jennifer Pritchett Sent: Monday, July 02, 2018 8:57 AM To: Gus Colom Cc: Cameron Langille; Patricia Saternye Subject: RE: file to flatten SDP2018-00050 Brookhill Block 4 From: Gus Colom Sent: Monday, July 02, 2018 8:55 AM To: Jennifer Pritchett <jpritchett@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Which permit is it supposed to be on? bus CO/OM Systems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.albemarle.orQ 'Always coo ri�At. Tk5 willgratily some people and astoni5l the rest " Mark Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to Provide feedback From: Jennifer Pritchett Sent: Monday, July 02, 2018 8:36 AM To: Gus Colom <GCOLOM@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Good morning Gus, I am getting the same error message. Jen From: Gus Colom Sent: Friday, June 29, 2018 1:00 PM To: Jennifer Pritchett <jpritchett@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Importance: High Ok Jennifer I have reduced the size of the original pdf It's now located in \\cob fs01\Vol3\DEPT\Community Development\Information Services Division\Records Management And is called 180612_Final_Site_Plan-Section_1_Block_4A_and_4B.pdf Try to upload it and let me know how it goes. bus CO/OM Systems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.albemarle.or� Always do relit. This willgratify somc f cof lc anda5toni5ti the rest." Mark Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to provide feedback From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:30 AM To: Gus Colom <GCOLOM@albemarle.org> Subject: file to flatten I:\DEPT\Community Development\Information Services Division Thank you! Jennifer Pritchett Intake/Support Specialist Community Development *G1 Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 3072 From: Gus Colom Sent: Monday, July 02, 2018 8:55 AM To: Jennifer Pritchett Cc: Cameron Langille Subject: RE: file to flatten Which permit is it supposed to be on? Gus Co%m Jam' 9stems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.albemarle.ore, 'Always do rght. T&5 will ratify somePeof le and astoni5� the rest 11 Mark Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to provide feedback From: Jennifer Pritchett Sent: Monday, July 02, 2018 8:36 AM To: Gus Colom <GCOLOM@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Good morning Gus, I am getting the same error message. Jen From: Gus Colom Sent: Friday, June 29, 2018 1:00 PM To: Jennifer Pritchett <ipritchett@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Importance: High Ok Jennifer I have reduced the size of the original pdf It's now located in \\cob fs01\Vol3\DEPT\Community Development\Information Services Division\Records Management And is called 180612_Final_Site_Plan-Section_1_Block_4A_and_4B.pdf Try to upload it and let me know how it goes. Cus Co%m jystems Analyst Information Technology Dept. -- County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.alkemaric.org 'A43y5 do r�ht. Tk5 wi%/grati{y 50MC PeoP/e and a5toni5� tie rest. " Mark Twain US humorist, novelist, short story author, & wit (1835 -1910) Please click here if you wish to provide feedback From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:30 AM To: Gus Colom <GCOLOM@albemarle.org> Subject: file to flatten I:\DEPT\Community Development\Information Services Division Thank you! Jennifer Pritchett Intake/Support Specialist Community Development ip Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 3072 From: Jennifer Pritchett Sent: Monday, July 02, 2018 8:36 AM To: Gus Colom Cc: Cameron Langille Subject: RE: file to flatten Good morning Gus, I am getting the same error message. Jen From: Gus Colom Sent: Friday, June 29, 2018 1:00 PM To: Jennifer Pritchett <jpritchett@albemarle.org> Cc: Cameron Langille <blangille@albemarle.org> Subject: RE: file to flatten Importance: High Ok Jennifer I have reduced the size of the original pdf It's now located in \\cob fs01\Vol3\DEPT\Community DeveloDment\Information Services Division\Records Management And is called 180612_Final_Site_Plan-Section_1_Block_4A_and_4B.pdf Try to upload it and let me know how it goes. Gus Co%m Jam' 9stems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.albemarle.oro 'Always do r�ot. T&5 wil%ratify someFeof le and astoni5� the rest " Mark Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to Provide feedback From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:30 AM To: Gus Colom <GCOLOM@albemarle.org> Subject: file to flatten I:\DEPT\Community Development\Information Services Division Thank you! Jennifer Pritchett Intake/Support Specialist Community Development �t Y V ti J, ay�R(i11r*, Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 3072 From: Patricia Saternye Sent: Friday, June 29, 2018 1:01 PM To: Jennifer Pritchett; Cameron Langille Cc: Gus Colom Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Jennifer, I tried to reduce the file but only got it down to 58 MB. I put it in the same folder as the one you had with the name revised with "reduced2" at the end. Thanks, Paty Saternye Senior Planner Community Development a` v A, • r-11GIOS, Albemarle County 401 McIntire Road Charlottesville, VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.ore From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:55 AM To: Cameron Langille <blangille@albemarle.org> Cc: Patricia Saternye <psaternye@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Cameron, It's taking longer than planned, as the file is too big (plans). Gus is in the process of shrinking it, as we speak. Once he has completed that task, I will upload it to County View. The SDP number is SDP2018- 00050. Everything else has been taken care of. For the time being, this is the temp location. Please save it outside of this location until Gus has completed his process. I:\DEPT\Community Development\Information Services Division Thank you, Jen From: Cameron Langille Sent: Friday, June 29, 2018 10:11 AM To: Jennifer Pritchett <Ipritchett@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Hi Jennifer, First off, thank you s0000 much for helping me with thisH This is the email that Jen and I received for the Brookhill Block 4 Apartments Final Site Plan. The developer also had submitted a final site plan for Brookhill Block 3A. The check they dropped off yesterday was supposed to be the payment for the Block 4 Apartments site plan, not the Block 3A. Jen created an entry in Countyview for Block 3A and put the check under that application in CV. The Block 3A application number is SDP201800049. The check was for $1,713 and it is viewable under the fees tab. Can you: 1. Create a new CV entry for the Block 4 final site plan, download all the materials from the UP site, and create a hard copy folder. 2. Move the check from SDP201800049 to the new Block 4 final site plan? From: bbooker@bohlereng.com [mailto:bbooker@bohlereng.com] Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker(a�bohlereng com To: blan ig llekalbemarle.org; jsmith2(a�albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - Final Site Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER F N G T N'F F R T 11 G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME I SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 PM 70,255 KB Section l Block 4A and 4B.pdf 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission.pdf 180615 Checklist - Completed.pdf PDF File 6/22/2018 4:29 PM 264 KB 180615 Site Plan A Dlication.pdf PDF File 6/22/2018 4:31 PM 226 KB From: Gus Colom Sent: Friday, June 29, 2018 1:00 PM To: Jennifer Pritchett Cc: Cameron Langille Subject: RE: file to flatten Importance: High Ok Jennifer I have reduced the size of the original pdf It's now located in \\cob fs01\Vol3\DEPT\Community Development\Information Services Division\Records Management And is called 180612_Final_Site_Plan-Section_1_Block_4A_and_4B.pdf Try to upload it and let me know how it goes. Gus Colour Jam' ystems Analyst Information Technology Dept. - County of Albemarle Office (434)296-5814 - Helpdesk ext. 5895 IT Department - 401 McIntire Rd, Charlottesville VA 22902 www.alkemarle.org AlwatJ, s oho r�tit. TA/s will�rathyc some people and astonish Me rest." Mary Twain US humorist, novelist, short story author, & wit (1835 - 1910) Please click here if you wish to Provide feedback From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:30 AM To: Gus Colour <GCOLOM@albemarle.org> Subject: file to flatten I:\DEPT\Community Development\Information Services Division Thank you! Jennifer Pritchett Intake/Support Specialist Community Development *G1 Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 ext. 3072 From: Patricia Saternye Sent: Friday, June 29, 2018 12:13 PM To: Cameron Langille Subject: Is it a go or not? I know we got the file and the fee....? Is it a go or not? I know we got the file and the fee, but now I fear we may have lost a lot of people because of the uncertainty until the last minute... Thanks, Paty Saternye Senior Planner Community Development Albemarle County 401 McIntire Road Charlottesville, VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.ore From: Jennifer Pritchett Sent: Friday, June 29, 2018 11:55 AM To: Cameron Langille Cc: Patricia Saternye Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Cameron, It's taking longer than planned, as the file is too big (plans). Gus is in the process of shrinking it, as we speak. Once he has completed that task, I will upload it to County View. The SDP number is SDP2018- 00050. Everything else has been taken care of. For the time being, this is the temp location. Please save it outside of this location until Gus has completed his process. I:\DEPT\Community Development\Information Services Division Thank you, Jen From: Cameron Langille Sent: Friday, June 29, 2018 10:11 AM To: Jennifer Pritchett <jpritchett@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Hi Jennifer, First off, thank you s0000 much for helping me with this!! This is the email that Jen and I received for the Brookhill Block 4 Apartments Final Site Plan. The developer also had submitted a final site plan for Brookhill Block 3A. The check they dropped off yesterday was supposed to be the payment for the Block 4 Apartments site plan, not the Block 3A. Jen created an entry in Countyview for Block 3A and put the check under that application in CV. The Block 3A application number is SDP201800049. The check was for $1,713 and it is viewable under the fees tab. Can you: 1. Create a new CV entry for the Block 4 final site plan, download all the materials from the FTP site, and create a hard copy folder. 2. Move the check from SDP201800049 to the new Block 4 final site plan? From: bbooker@bohlereng.com [mailto:bbooker@bohlereng.com] Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbookerkbohlereng com To: blan ig llekalbemarle.org; jsmith2kalbemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - Final Site Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER 1. N G I N F. F R I !\ ( 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker(cbbohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 PM 70,255 KB Section 1 Block 4A and 4B. df 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission. df 180615 Checklist - Com leted. df PDF File 6/22/2018 4:29 PM 264 KB 180615 Site Plan Application.pff PDF File 6/22/2018 4:31 PM 226 KB From: Cameron Langille Sent: Friday, June 29, 2018 10:11 AM To: Jennifer Pritchett Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Attachments: f Hi Jennifer, First off, thank you s0000 much for helping me with this!! This is the email that Jen and I received for the Brookhill Block 4 Apartments Final Site Plan. The developer also had submitted a final site plan for Brookhill Block 3A. The check they dropped off yesterday was supposed to be the payment for the Block 4 Apartments site plan, not the Block 3A. Jen created an entry in Countyview for Block 3A and put the check under that application in CV. The Block 3A application number is SDP201800049. The check was for $1,713 and it is viewable under the fees tab. Can you: 1. Create a new CV entry for the Block 4 final site plan, download all the materials from the FTP site, and create a hard copy folder. 2. Move the check from SDP201800049 to the new Block 4 final site plan? From: bbooker@bohlereng.com [mailto:bbooker@bohlereng.com] Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; ismith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - Final Site Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER E. N G I N E E R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 70,255 Section 1 Block 4A and PM KB 4B.pdf 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission.pdf 180615 Checklist - PDF File 6/22/2018 4:29 264 Completed.pdf PM KB 180615 PDF File 6/22/2018 4:31 226 Site Plan Application.pdf PM KB From: Patricia Saternye Sent: Friday, June 29, 2018 8:12 AM To: Cameron Langille Cc: Matthew Wentland Subject: RE: Brookhill Block 4 Final Site Plan Thanks Cameron O. Paty Saternye Senior Planner Community Development ®r"IFOW, ikk 1.4 Albemarle County 401 McIntire Road Charlottesville, VA 22902 434-296-5832 ext.3250 psaternye@albemarle.org www.albemarle.ore From: Cameron Langille Sent: Thursday, June 28, 2018 5:55 PM To: Patricia Saternye <psaternye@albemarle.org> Cc: Matthew Wentland <mwentland@albemarle.org> Subject: Brookhill Block 4 Final Site Plan Paty, Intake made a mistake today and thought that the check that Bohler Engineering sent to us was for the fee payment of a different Brookhill final site plan that they also have uploaded to the FTP site. Intake created an entry for the Brookhill Block 3A final site plan in Countyview, and not the Block 4 final site plan. Bohler has uploaded both of the electronic plans to our FTP site, but they have only submitted one fee payment, and they wanted the check to cover the Block 4 final site plan fee. I am trying to verify with Jen that Intake can: 1. Create a Countyview entry for the Block 4 final site plan and 2. Move the check/fee payment that was incorrectly entered under the Block 3A application number in CV to the Block 4 application number so we can begin review of it. If they can, then we will have our review of it tomorrow. Bohler Engineering is intending to send us another check that will cover the Block 3A final site plan fee. I've never dealt with a fee being entered into the wrong application in CV, so we'll see what happens. From: Cameron Langille Sent: Thursday, June 28, 2018 5:55 PM To: Patricia Saternye Cc: Matthew Wentland Subject: Brookhill Block 4 Final Site Plan Paty, Intake made a mistake today and thought that the check that Bohler Engineering sent to us was for the fee payment of a different Brookhill final site plan that they also have uploaded to the UP site. Intake created an entry for the Brookhill Block 3A final site plan in Countyview, and not the Block 4 final site plan. Bohler has uploaded both of the electronic plans to our UP site, but they have only submitted one fee payment, and they wanted the check to cover the Block 4 final site plan fee. I am trying to verify with Jen that Intake can: 1. Create a Countyview entry for the Block 4 final site plan and 2. Move the check/fee payment that was incorrectly entered under the Block 3A application number in CV to the Block 4 application number so we can begin review of it. If they can, then we will have our review of it tomorrow. Bohler Engineering is intending to send us another check that will cover the Block 3A final site plan fee. I've never dealt with a fee being entered into the wrong application in CV, so we'll see what happens. From: Cameron Langille Sent: Thursday, June 28, 2018 5:49 PM To: Jennifer Smith - CDD - Planning Subject: FW: Brookhill Fees Jen, Based on Ryan's response, please let me know ASAP about creating an entry into CV for the Block 4 final site plan as I mentioned in my email to you earlier. They will be submitting the Block 3A final site plan check later. From: Cameron Langille Sent: Thursday, June 28, 2018 5:47 PM To: 'Ryan Yauger' <ryauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Brookhill Fees Thanks Ryan! From: Ryan Yauger [mailto:ryauger@bohlereng.com] Sent: Thursday, June 28, 2018 5:46 PM To: Cameron Langille <blangille@albemarle.org>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Brookhill Fees Yes, that is the case, the apartments should be ready for distribution now. Thank you! From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Thursday, June 28, 2018 5:30 PM To: Ryan Yauger <rvauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: Brookhill Fees Good Evening Ryan & Brandy, Today we received one check for final site plan fee payment. Can you verify that the check was supposed to cover the Block 4 final site plan fee, and not the Block 3A? -Cameron From: Cameron Langille Sent: Thursday, June 28, 2018 5:47 PM To: Ryan Yauger; Brandy Booker Cc: Jennifer Smith - CDD - Planning Subject: RE: Brookhill Fees Thanks Ryan! From: Ryan Yauger [mailto:ryauger@bohlereng.com] Sent: Thursday, June 28, 2018 5:46 PM To: Cameron Langille <blangille@albemarle.org>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Brookhill Fees Yes, that is the case, the apartments should be ready for distribution now. Thank you! From: Cameron Langille[mailto:blangille@albemarle.org] Sent: Thursday, June 28, 2018 5:30 PM To: Ryan Yauger <rvauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: Brookhill Fees Good Evening Ryan & Brandy, Today we received one check for final site plan fee payment. Can you verify that the check was supposed to cover the Block 4 final site plan fee, and not the Block 3A? -Cameron From: Ryan Yauger <ryauger@bohlereng.com> Sent: Thursday, June 28, 2018 5:46 PM To: Cameron Langille; Brandy Booker Cc: Jennifer Smith - CDD - Planning Subject: RE: Brookhill Fees Yes, that is the case, the apartments should be ready for distribution now. Thank you! From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Thursday, June 28, 2018 5:30 PM To: Ryan Yauger <ryauger@bohlereng.com>; Brandy Booker <bbooker@bohlereng.com> Cc: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: Brookhill Fees Good Evening Ryan & Brandy, Today we received one check for final site plan fee payment. Can you verify that the check was supposed to cover the Block 4 final site plan fee, and not the Block 3A? -Cameron From: Cameron Langille Sent: Thursday, June 28, 2018 5:30 PM To: Ryan Yauger; Brandy Booker Cc: Jennifer Smith - CDD - Planning Subject: Brookhill Fees Good Evening Ryan & Brandy, Today we received one check for final site plan fee payment. Can you verify that the check was supposed to cover the Block 4 final site plan fee, and not the Block 3A? -Cameron From: Cameron Langille Sent: Thursday, June 28, 2018 5:29 PM To: Jennifer Smith - CDD - Planning Subject: RE: Project: V1S2000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Attachments: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Jen, I just realized something: the transmittal sheet that Bohler sent with the check was for the fee payment for Brookhill Block 4 apartments final site plan, not the Block 3A ice rink final site plan. Bohler uploaded the Block 4 final site plan to the FTP site a week ago, and the Block 3A was only uploaded yesterday. See the attached email above from Bohler regarding the uploading of the Block 4 final site plan. Is there any way to create an entry in Countyview for the Block 4 final site plan and move the check that was processed today to that application in CV? Then change the fee for SDP201800049 to unpaid. I guess Bohler Engineering only submitted one check to us for final site plan fee payment, but they have two final site plans actually submitted. I am going to email them right after this and CC you so we can figure out where the other check is. From: Cameron Langille Sent: Thursday, June 28, 2018 5:15 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Yes Jen, please put the submittal date as June 25t". Thanks! From: Jennifer Smith - CDD - Planning Sent: Thursday, June 28, 2018 3:23 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: I put the folder in your mailbox. Thank you! Jen From: Jennifer Smith - CDD - Planning Sent: Thursday, June 28, 2018 2:35 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Good afternoon Cameron: I have received the payment for the Site plan for Brookhill (Ice Rink). Do you want me to put the submittal date for June 251" ? Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 4:03 PM To: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan It's not your fault so don't apologize!! I've spoken with the engineer at Bohler, Ryan Yauger, who is working on all of these plans. I told him that once they pay the fee for the final site plan for the Block 4 apartments, that I would distribute the plans to all the reviewers. That's a slight break from our normal distribution protocol (usually we would wait to distribute the plans until the following Tuesday after they pay the fees), so that is my main concern is getting the final site plan fee paid. The WPO plans aren't as much of a hurry. Thanks for all of your work and just keep me posted! From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 3:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Ok. I just received the payment for both the WPO applications, (Ice Rink & Block 4 apartments). I just emailed Mr. Booker back because the application for the apartments that they attached is actually the once for the ice rink also. So I have them hopefully emailing me the corrected application so I can take care of this one also. The one for the Ice Rink is in now (WPO2018-50). The application for the Final Site plan, the fees still haven't been paid for that one, so it's still at a standstill. Sorry for this mess. Thank you so much for your help with these. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <Ismith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.or CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER I N G 1\ I- I' k I (: 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE I TIME I SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 4B - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 PM 250 KB Application.pdf From: Cameron Langille Sent: Thursday, June 28, 2018 5:15 PM To: Jennifer Smith - CDD - Planning Subject: RE: Project: V1S2000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Yes Jen, please put the submittal date as June 25t". Thanks! From: Jennifer Smith - CDD - Planning Sent: Thursday, June 28, 2018 3:23 PM To: Cameron Langille <blangille@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: I put the folder in your mailbox. Thank you! Jen From: Jennifer Smith - CDD - Planning Sent: Thursday, June 28, 2018 2:35 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Good afternoon Cameron: I have received the payment for the Site plan for Brookhill (Ice Rink). Do you want me to put the submittal date for June 25tn Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 4:03 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan It's not your fault so don't apologize!! I've spoken with the engineer at Bohler, Ryan Yauger, who is working on all of these plans. I told him that once they pay the fee for the final site plan for the Block 4 apartments, that I would distribute the plans to all the reviewers. That's a slight break from our normal distribution protocol (usually we would wait to distribute the plans until the following Tuesday after they pay the fees), so that is my main concern is getting the final site plan fee paid. The WPO plans aren't as much of a hurry. Thanks for all of your work and just keep me posted! From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 3:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Ok. I just received the payment for both the WPO applications, (Ice Rink & Block 4 apartments). I just emailed Mr. Booker back because the application for the apartments that they attached is actually the once for the ice rink also. So I have them hopefully emailing me the corrected application so I can take care of this one also. The one for the Ice Rink is in now (WPO2018-50). The application for the Final Site plan, the fees still haven't been paid for that one, so it's still at a standstill. Sorry for this mess. Thank you so much for your help with these. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <Ismith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: Project Number From: To: CC: Subject: Sent via: Expiration Date: Remarks: V152000 V152000 - Riverbend Management - Brookhill - Residential Development bbooker@bohlereng.com blangille@albemarle.org; ismith2@albemarle.org Ryan Yauger (Bohler Engineering - Warrenton) Brookhill Block 4 Apartments - WPO Plan Info Exchange 7/22/2018 ]en/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER I N G I\ I- l: R I Nt G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 46 - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 I PM 250 KB Application.pdf From: Ryan Yauger <ryauger@bohlereng.com> Sent: Wednesday, June 27, 2018 4:12 PM To: Cameron Langille Cc: Brandy Booker Subject: Re: Brookhill Block 4 Final Site Plan Fee Hey Cameron, I apologize - we will submit the fee ourselves tomorrow to you to get the ball rolling. Also FYI I dropped off your approved ISPs today as well. Thanks! Ryan Sent from my iPhone On Jun 27, 2018, at 4:10 PM, Cameron Langille <blangille@albemarle.org> wrote: Hi Ryan & Brandy, I just spoke with my colleagues in the Intake division here, and the fees for the WPO plans were submitted to us yesterday afternoon. However, the fee for the final site plan for the Block 4 apartments was not included in the checks that were dropped off, so the actual application has not yet been released to me to distribute to the reviewers yet. I just wanted to let you both know so that you can get that payment to us since you want this plan to be reviewed ASAP. Please let me know if you have any questions. Thanks, Cameron Cameron Langille Senior Planner Albemarle County 401 McIntire Road Charlottesville, VA 22902 Ph: 434-296-5832 ext. 3432 blangille albemarle.org From: Cameron Langille Sent: Wednesday, June 27, 2018 4:10 PM To: Ryan Yauger; Brandy Booker Subject: Brookhill Block 4 Final Site Plan Fee Hi Ryan & Brandy, I just spoke with my colleagues in the Intake division here, and the fees for the WPO plans were submitted to us yesterday afternoon. However, the fee for the final site plan for the Block 4 apartments was not included in the checks that were dropped off, so the actual application has not yet been released to me to distribute to the reviewers yet. I just wanted to let you both know so that you can get that payment to us since you want this plan to be reviewed ASAP. Please let me know if you have any questions. Thanks, Cameron Cameron Langille Senior Planner Albemarle County 401 McIntire Road Charlottesville, VA 22902 Ph: 434-296-5832 ext. 3432 blangille(a)albemarle.org From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 4:18 PM To: Cameron Langille Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thank you for that!! That sounds great! Hopefully they will get the Site Plan fees in soon. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 4:03 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan It's not your fault so don't apologize!! I've spoken with the engineer at Bohler, Ryan Yauger, who is working on all of these plans. I told him that once they pay the fee for the final site plan for the Block 4 apartments, that I would distribute the plans to all the reviewers. That's a slight break from our normal distribution protocol (usually we would wait to distribute the plans until the following Tuesday after they pay the fees), so that is my main concern is getting the final site plan fee paid. The WPO plans aren't as much of a hurry. Thanks for all of your work and just keep me posted! From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 3:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Ok. I just received the payment for both the WPO applications, (Ice Rink & Block 4 apartments). I just emailed Mr. Booker back because the application for the apartments that they attached is actually the once for the ice rink also. So I have them hopefully emailing me the corrected application so I can take care of this one also. The one for the Ice Rink is in now (WP02018-50). The application for the Final Site plan, the fees still haven't been paid for that one, so it's still at a standstill. Sorry for this mess. Thank you so much for your help with these. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning <0smith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; ismith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER F. N G I 1 IF. F R I 1\ G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbookerObbohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 4B - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 PM 250 KB Application.pdf From: Cameron Langille Sent: Tuesday, June 26, 2018 4:03 PM To: Jennifer Smith - CDD - Planning Subject: RE: Project: V1S2000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan It's not your fault so don't apologize!! I've spoken with the engineer at Bohler, Ryan Yauger, who is working on all of these plans. I told him that once they pay the fee for the final site plan for the Block 4 apartments, that I would distribute the plans to all the reviewers. That's a slight break from our normal distribution protocol (usually we would wait to distribute the plans until the following Tuesday after they pay the fees), so that is my main concern is getting the final site plan fee paid. The WPO plans aren't as much of a hurry. Thanks for all of your work and just keep me posted! From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 3:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Ok. I just received the payment for both the WPO applications, (Ice Rink & Block 4 apartments). I just emailed Mr. Booker back because the application for the apartments that they attached is actually the once for the ice rink also. So I have them hopefully emailing me the corrected application so I can take care of this one also. The one for the Ice Rink is in now (WP02018-50). The application for the Final Site plan, the fees still haven't been paid for that one, so it's still at a standstill. Sorry for this mess. Thank you so much for your help with these. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; ismith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER I' N G I F F R T 1\ G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 4B - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 PM 250 KB Application.pdf From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 3:59 PM To: Cameron Langille Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Ok. I just received the payment for both the WPO applications, (Ice Rink & Block 4 apartments). I just emailed Mr. Booker back because the application for the apartments that they attached is actually the once for the ice rink also. So I have them hopefully emailing me the corrected application so I can take care of this one also. The one for the Ice Rink is in now (WP02018-50). The application for the Final Site plan, the fees still haven't been paid for that one, so it's still at a standstill. Sorry for this mess. Thank you so much for your help with these. Thank you! Jen From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <4smith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; ismith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER I N G I\ I- l: R I Nt G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 46 - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 I PM 250 KB Application.pdf From: Cameron Langille Sent: Tuesday, June 26, 2018 3:55 PM To: Jennifer Smith - CDD - Planning Subject: RE: Project: V1S2000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Thanks Jen, I just spoke with Ryan and supposedly they are sending a courier down sometime this afternoon with the checks. If you wouldn't mind just sending me an email once it's been paid, I'd really appreciate it! -Cameron From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <ismith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER E N G I 1\ I• F R I 1\ G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 4B - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 I PM 250 KB Application.pdf From: Brandy Booker <bbooker@bohlereng.com> Sent: Tuesday, June 26, 2018 2:28 PM To: Cameron Langille; Ryan Yauger Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Cameron, Thank you! We will coordinate having the fee dropped off. Brandy Booker, Notary Public 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e-mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. From: Cameron Langille [mailto:blangille@albemarle.org] Sent: Monday, June 25, 2018 10:57 AM To: Brandy Booker <bbooker@bohlereng.com>; Ryan Yauger <ryauger@bohlereng.com> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Hi Brandy & Ryan, We have received the electronic plans, but the checks for payment have not come in as of yet. That is the last remaining item we need before distributing the plans for review. I do not need hard copies of the final site plan right now. When it comes time for approval of the plans, I will need four hard copies for the County and our partner agencies to sign and approve. That will come later, but just wanted to give you a heads up. From: Jennifer Smith - CDD - Planning Sent: Monday, June 25, 2018 9:52 AM To: Cameron Langille <blangille@albemarle.org> Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan As far as I know, just the payment. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:51 AM To: Jennifer Smith - CDD - Planning <4smith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Hi Jen, Do you need anything else from them in order to get this submittal on the 6/25 submittal date for SUB/SDP/ARB plans? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: Project Number From: To: CC: Subject: Sent via: Expiration Date: Remarks: V152000 V152000 - Riverbend Management - Brookhill - Residential Development bbooker@bohlereng.com blangille@albemarle.org; jsmith2@albemarle.org Ryan Yauger (Bohler Engineering - Warrenton) Brookhill Block 4 Apartments - Final Site Plan Info Exchange 7/22/2018 Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's F FP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER F. N G I\ F. F I2 I 1N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbookerObbohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 70,255 Section 1 Block 4A and PM KB 4B.pdf 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission.pdf 180615 Checklist - PDF File 6/22/2018 4:29 264 Completed.pdf PM KB 180615 PDF File 6/22/2018 4:31 226 Site Plan Application.pdf PM KB From: Jennifer Smith - CDD - Planning Sent: Tuesday, June 26, 2018 12:59 PM To: Cameron Langille Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Cameron: Just to let you know, we have not received the fees for any of these projects. I have emailed Ryan a few times. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.or CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER I \ (. I\ I- F R I 1\ G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE I TIME I SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 152,403 KB 4B - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO - PDF File 6/22/2018 4:41 PM 250 KB Application.pdf From: Jennifer Smith - CDD - Planning Sent: Monday, June 25, 2018 9:52 AM To: Cameron Langille Subject: RE: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan As far as I know, just the payment. Thank you! Jen From: Cameron Langille Sent: Monday, June 25, 2018 9:51 AM To: Jennifer Smith - CDD - Planning <jsmith2@albemarle.org> Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Hi Jen, Do you need anything else from them in order to get this submittal on the 6/25 submittal date for SUB/SDP/ARB plans? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; ismith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - Final Site Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER F N G I N 1• F R I N G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbookerObbohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE I TIME SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 70,255 Section 1 Block 4A and PM KB 4B.pdf 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission.pdf 180615 Checklist - PDF File 6/22/2018 4:29 264 Completed.pdf PM KB 180615 PDF File 6/22/2018 4:31 226 Site Plan Application.pdf PM KB From: Cameron Langille Sent: Monday, June 25, 2018 9:52 AM To: Jennifer Smith - CDD - Planning Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Attachments: Jen, Since this is a WPO plan, I am not sure what the submittal process is for them. Do you need anything else from Bohler in order to get this distributed to Engineering? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.or CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER 1 IN (. 1\ 1 1 k I (: 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 413 - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO_- PDF File I 6/22/2018 I 4:41 PM 250 KB Application.pdf From: Cameron Langille Sent: Monday, June 25, 2018 9:51 AM To: Jennifer Smith - CDD - Planning Subject: FW: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan Attachments: Hi Jen, Do you need anything else from them in order to get this submittal on the 6/25 submittal date for SUB/SDP/ARB plans? From: bbooker@bohlereng.com <bbooker@bohlereng.com> Sent: Friday, June 22, 2018 4:43 PM To: Cameron Langille <blangille@albemarle.org> Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - Final Site Plan IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.or CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - Final Site Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/14/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER 1 IN (. I\ 1 1 k I (: 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180612 Final Site Plan - PDF File 6/14/2018 1:48 70,255 Section 1 Block 4A and PM KB 4B.pdf 180614 Albemarle County PDF File 6/14/2018 2:25 PM 108 KB Transmittal - Final Site Plan Block 4 Apartments 1st Submission.pdf 180615 Checklist - PDF File 6/22/2018 4:29 264 Completed.pdf PM KB 180615 PDF File 6/22/2018 4:31 226 Site Plan Application.pdf PM KB From: bbooker@bohlereng.com Sent: Friday, June 22, 2018 4:46 PM To: Cameron Langille Subject: Project: V152000 - File Transfer - Brookhill Block 4 Apartments - WPO Plan Attachments: - f IMPORTANT: Click a link below to access files associated with this transmittal that came in through the Bohler Engineering Info Exchange web site. The attached file contains the transmittal details. Download all associated files Additional links: Reply to All Project Name: V152000 Project Number: V152000 - Riverbend Management - Brookhill - Residential Development From: bbooker@bohlereng.com To: blangille@albemarle.org; jsmith2@albemarle.org CC: Ryan Yauger (Bohler Engineering - Warrenton) Subject: Brookhill Block 4 Apartments - WPO Plan Sent via: Info Exchange Expiration Date: 7/22/2018 Remarks: Jen/Cameron, Attached please find the required submission items for the above referenced project. This package was submitted to Albemarle County's FTP site on 6/13/18 but unfortunately the file exchange failed. I've spoken with Paty and a few of our solutions we tried also failed. This info exchange is our last solution until the problem can be determined. Please let me know if you need any hard copies and if you have any questions. The check will be submitted to your office under separate cover. Thanks and have a great weekend! Brandy Booker BOHLER F. N G I 1• 1: R I n G 28 Blackwell Park Lane, Suite 201 1 Warrenton, VA 20186 P: 540-349-4500 1 bbooker@bohlereng.com www.BohlerEngineering.com Confidentiality Note: This e-mail, and any attachment to it, contains confidential information intended only for the use of the designated recipients, which information may also be privileged. If the reader of this e- mail is not the intended recipient, the document has been received in error and any use, review, dissemination, distribution, disclosure or copying of this message is strictly prohibited. If you have received this e-mail in error, please notify the sender via reply e-mail and immediately delete this e-mail from your system. Transferred Files NAME TYPE DATE TIME SIZE 180608 Brookhill Block 4A & PDF File 6/22/2018 4:41 PM 52,403 KB 413 - WPO Plan.pdf 180613 Albemarle County PDF File 6/22/2018 4:41 PM 107 KB Transmittal - WPO Block 4 Apartments 1st Submission.pdf Block 4 Apartments WPO_- PDF File 6/22/2018 4:41 PM 250 KB Application.pdf