HomeMy WebLinkAboutSUB201900039 Correspondence 2019-05-21 Christopher Perez
From: Ana Kilmer
Sent: Tuesday, May 21, 2019 4:43 PM
To: Nena Harrell
Cc: Matthew Wentland; Christopher Perez; Frank Pohl
Subject: Briarwood Subdivision portion of phase 8 - SDP200600041
The$165,200 subdivision road performance bond has been posted and approved. Per Jeremy Lynn's email dated
5/7/2019, no water and sewer bond.will be required.
Thank you
Ana D. Kilmer
Management Analyst II
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-5832
akilmer@albemarle.org
•
•
Christopher Perez
From: Christopher Perez
Sent: Monday, May 06,2019 8:23 AM
To: 'Nena Harrell'
Subject: _:ARE:I8"Lottlm4Tree Court BriarwoocI,Subdivision Plat
Attachments: :'yy Eleventh Supplement 4-30-19.pdf
ena,
•
•
The revised plat looks good. Please ensure the 11th supplemental document is updated to re erence the revised
plat date of May 1, 2019. Also,please work with Engineering and Ana Kilmer to post the'•and for the
remainder of the road. Once these two items are completed I can approve the plat. In th, meantime,please
ubmit 4 copies of the signed/notarized plat. I'll hold the approval till the items are co pleted.
Cluj topher Perez I Senior Planner
Depa ent of Community Development(County of Albemarle,Virginia r'�
401 Mcfn Lre Road I Charlottesville,VA 22902
434.296.5832ext.3443
From: Nena Harrell<ulcwww@'e'rribargm'ail.com>
Sent: Friday, May 03, 2019 5:10 PM
To:Christopher Perez<cperez@albemarle.org>
Subject: FW:48 Lot Elm Tree Court Briarwood Subdivision Plat
Chris,
See attached. Thanks!
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
From:Joe Keller [mailto:loe.keller@lincolnsurveying.com] •
Sent:Wednesday, May 1, 2019 2:31 PM
To: Nena Harrell<ulcwww@embargmail.com>; Chris Kean <chris.kean@lincolnsurveying.com>
Subject:48 Lot Elm Tree Court Briarwood Subdivision Plat
Nena,
Attached is a PDF of the subdivision plat addressing the County comments from 4/30/2019 for your review and
submittal.
Joe
•
Christopher Perez
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Thursday, May 02, 2019 9:14 AM
To: Christopher Perez
Subject: FW:48 Lot Elm Tree Court Briarwood Subdivision Plat
Attachments: 110006801_SU B-48LOTS_19121.pdf
Chris,
7
Attached is the revised plat for Briarwood 8 that I can recommend for approval.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434)977-4511
From:Jeremy Lynn
Sent:Wednesday, May 01, 2019 3:53 PM
To: Richard Nelson<rnelson@serviceauthority.org>
Subject: FW:48 Lot Elm Tree Court Briarwood Subdivision Plat
Here's the revised plat.
Jeremy M. Lynn, P.E. '
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911 •
(434)977-4511
From: Nena Harrell<ulcwww@embargmail.com>
Sent:Wednesday, May 01, 2019 3:40 PM
To:Jeremy Lynn<ilynn@serviceauthority.org>
Cc: 'Christopher Perez'<cperez@albemarle.org>
Subject: FW:48 Lot Elm.Tree Court Briarwood Subdivision Plat
Jeremy,
FYI—understand you have told Hunter that your easement is not an exclusive easement.
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
1
Christopher Perez
From: Christopher Perez
Sent: Tuesday,April 30, 2019 10:04 AM
To: 'Chris Kean'
Subject: SUB201900039 Briarwood - Phase 8 Final Subdivision Plat
Attachments: CD1 SUB201900039 Briarwood - Phase 8 Final Subdivision Plat_Revised 4-30-19.pdf
Mr.Kean,
• RE: SUB201900039 Briarwood-Phase 8 Final Su ivision Plat
ACSA's review comment still stands:"ACSA zlities_znust av_e_their o-wn_separate-easements._elease revise the p_lat to
include these."
\\\\
Thanks r a I
Christopher Perez I Senior Planner
6� I�
Department of Community Development!County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
44.296.5832 ext.3443
From:Christopher Perez
Sent:Tuesday,April 30, 2019 9:38 AM
To: 'Nena Harrell'<ulcwww@embarqmail.com>
Cc: 'Chris Kean'<chris.kean@lincolnsurveying.com>
Subject: RE:SUB201900039 Briarwood -Phase 8 Final Subdivision Plat
Nena,
RE: SUB201900039 Briarwood-Phase 8 Final Subdivision Plat
Per your request I spoke with the County Attorney about his review comments.Evidently there was a slight
misunderstanding.
Attached is a revised comment letter: omitting comment#7 and correcting comment#6.Please review.
Thanks
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena Harrell<ulcwww@embargmail.com>
Sent: Monday,April 29, 2019 2:57 PM
To:Christopher Perez<cperez@albemarle.org>; 'Chris Kean'<chris.kean@Iincolnsurveying.com>
Cc: Matthew Wentland<mwentland@albemarle.org>
Subject: RE:SUB201900039 Briarwood -Phase 8 Final Subdivision Plat
Chris, •
Can you please elaborate on#7: We follow the same template that we have used for other parts of Elmtree Court. Not
sure how to revise.
• 1
Ch Christopher her Perez
From: Christopher Perez
Sent: Tuesday,April 30, 2019 9:38 AM
To: 'Nena Harrell'
Cc: 'Chris Kean'
Subject: RE: SUB201900039 Briarwood - Phase 8 Final Subdivision Plat
Attachments: CD1 SUB201900039 Briarwood - Phase 8 Final Subdivision Plat_Revised 4-30-19.pdf
Nena,
RE: SUB201900039 Briarwood-Phase 8 Final Subdivision Plat
Per your request I spoke with the County Attorney about his review comments.Evidently there was a slight
misunderstanding.
Attached is a revised comment letter: omitting comment#7 and correcting comment#6.Please review.
Thanks
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena Harrell<ulcwww@embarqmail.com>
Sent: Monday,April 29,2019 2:57 PM
To: Christopher Perez<cperez@albemarle.org>; 'Chris Kean'<chris.kean@lincolnsurveying.com>
Cc: Matthew Wentland<mwentland@albemarle.org>
Subject: RE: SUB201900039 Briarwood- Phase 8 Final Subdivision Plat
Chris,
Can you please elaborate on#71 We follow the same template that we have used for other parts of Elmtree Court. Not
sure how to revise.
Thanks,
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
From:Christopher Perez [mailto:cperez@albemarle.org]
Sent: Monday,April 29, 2019 11:15 AM
To: Chris Kean<chris.kean@lincolnsurveying.com>; Nena Harrell<ulcwww@embargmail.com>
Cc: Matthew Wentland<mwentland@albemarle.org>
Subject:SUB201900039 Briarwood- Phase 8 Final Subdivision Plat
1
Mr. Kean,
SUB201900039 Briarwood-Phase 8 Final Subdivision Plat
Attached are the review comments for the above ref plat.
I just touched base w/ACSA and am awaiting their approval of the plat, but I figured its immenent as the site
plan already received their approval. Once received I will send it to you.
Christopher Perez I Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
•
2
,Christopher Perez
From: Christopher Perez
Sent: Monday,April 29, 2019 2:58 PM
To: Chris Kean; Nena Harrell
Cc: Richard Nelson
Subject: RE: SUB201900039 Briarwood - Phase 8 Final Subdivision Plat
Mr.Kean,
RE: SUB201900039 Briarwood-Phase,8 Final Subdivision Plat
I received ACSA's review: "ACSA utilities must have their own separate easements. Please revise the plat to include
these."
Please revise.
Christopher Perez I Senior Planner
Department of Community Development!County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From:Christopher Perez
Sent: Monday,April 29, 2019 11:15 AM •
To:Chris Kean<chris.kean@lincolnsurveying.com>; Nena Harrell<ulcwww@embarqmail.com>
Cc: Matthew Wentland<mwentland@albemarle.org>
Subject:SUB201900039 Briarwood-Phase 8 Final Subdivision Plat
Mr. Kean,
SUB201900039 Briarwood- Phase 8 Final Subdivision Plat
Attached are the review comments for the above ref plat.
I just touched base w/ACSA and am awaiting their approval of the plat, but I figured its immenent as the site
plan already received their approval. Once received I will send it to you.
Christopher Perez I Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
1
Christopher Perez
From: Christopher Perez
Sent: Wednesday,April 10, 2019 7:51 AM
To: Andy Herrick
Subject: SUB201900039 Briarwood - Phase 8 Final Subdivision Plat
Attachments: Riverwood - Declaration of Protective Covenants-Restrictions.pdf; SUB201900039
Briarwood Phase 8 -final plat.pdf;Transmittal to County Attorney.pdf; Riverwood -
Briarwood Eleventh Supplemental Declaration (1).pdf
Dear Mr.Herrick:
The above development is permitted by ZMA2005-9 and is governed by the applicable Proffers and
Application Plan. The above referenced plat is being considered for approval by this office; however,prior
to approval an instrument evidencing maintenance of certain improvements as required by Section 14-317
is required. They have provided the attached supplemental declaration which includes a portion of this
phase into the overall previously approved and recorded declaration for the development, Notably, other
portions of Phase 8 have been approved utilizing these covenants and restrictions.
Please review, should you have any questions or comments please feel free to contact me.
Christopher Perez I Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena Harrell<ulcwww@embarqmail.com>
Sent: Friday,April 05,2019 11:14 AM
To:Christopher Perez<cperez@albemarle.org>
Subject: RE: Briarwood Phase 8
Chris,
Attached is the Declaration. Article 4.07 and Article 9 speak to maintenance. Also attached is the proposed supplement
to accompany the pl t -- ---___ _.._.
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
1
• •
Christopher Perez
From: Christopher Perez
Sent: Monday, March 25, 2019 3:22 PM
To: 'Scott Collins'
Cc: Nena Harrell; 'Hunter Wood'
Subject: Briarwood Phase 8
Scott,
SDP201800083 Briarwood Phase 8 Minor Amendment
SUB201900039 Briarwood Phase 8-49 Lot subdivision
Per your request I have further researched the issues raised in the last email.In doing so,other seemingly larger issues
have been discovered with phase 8,which need to be addressed prior to site plan and plat approval.Below I have done my
best to explain all the issues.If the applicant would like to meet with senior staff to discuss these items,please let me
know and I'll schedule it.Additionally,I have reached out to the County Attorney's office for guidance on item#1 and
#2,pending a discussion.
I offer the following:
1. [18-21.7(c)] Disturbance of the 20'undisturbed buffer. A special exception is required to permit the disturbance of the
20' undisturbed buffer as depicted on the plans,which proposes permanent location of a storm drainage pipe and
associated easement and grading located in this buffer.Prior to final plat and site plan approval the special exception shall
be submitted and approved by the BOS.
I anticipate staff's recommendation of approval for this request because of the prior site plan approvals and the nature of
the request.Possible conditions of approval for the SE are to extend the required 20' undisturbed buffer into the
commercial property as a recorded easement and require screening meeting the ordinance be installed in this location
between the two districts.
History: The previously approved plans for this phase, SDP2006-41 and SDP2010-84, depict the above mentioned
improvements within the 20' undisturbed buffer on adjacent commercial property. Staff has been unable to locate a
special exception(or waiver) approval for these improvements by either the PC or the BOS. Do you have documentation
that such a waiver was approved by either of these legislative bodies?
2) [ZMA2004-14,ZMA2005-9, 14-234(C)(4)]Application Plan. Elm Tree Court(Private Road)connection to Camelot
Drive(Public Road)is not permitted by the rezoning's application plan and shall be omitted prior to approval of the site
plan and final plat.
•
There are a couple options to move forward:
A) Submit a variation request to the rezoning's application plan for BOS consideration to amend the application plan and
connect the two roads.Public notification of the variation request shall be required.Staff's support of this request may be
problematic due to the history of the connection at the rezoning stage, which consisted of public opposition from the
Camelot residences to the connection, County regulations prohibiting private streets to connect two public streets, and the
PC's recommendation and the BOS's action of not approving the connection. Possible solutions to this conundrum during
the review of the variation request may consist of a condition of approval requiring the installation of a locking bollard
system at the Camelot Drive connection,thereby prohibiting the through connection,while facilitating a pedestrian
connection and emergency access connection.
or
1
B)Remove the connection to Camelot irive all together and provide a cul-de-sac turn around internal to phase 8.This
would need to be reviewed and approved by all reviewers and may pose issues with Fire and Rescue and VDOT.
History: The previously approved plans for this phase, SDP2006-41 and SDP2010-84, do not conform to the zoning of
the property.The rezoning's application plan does not connect these two streets; rather, it prohibits them from connecting.
Private streets are not permitted to connect two public streets(Section 14-234(C)(4)),additionally the PC and BOS heard
from the residents of Camelot who were in opposition to the connection.The application plan was thereby revised by the
applicant between the PC and the BOS public hearing and the application plan approved by the BOS did not permit the
connection to Camelot Drive.
3) [ZMA2004-14,ZMA2005-9]Proffer 11 —Affordable Housing. Eight(8) affordable units are required in phase
8. Depict and label these units on the final plat and site plan. The previously approved plans depicted these units
as being Lots 112-119. Provide a chart on the cover sheet of these documents tracking all required 25 affordable
units.
Remaining previously mentioned unresolved comments as noted in CD2 of SDP2018-83 (3-11-19)
4. [Albemarle County Site Plan Amendment Policy] The"8 future townhomes"shall be included on this site plan as
proposed or they shall be removed.If they are not proposed on this plan,once they are submitted they will trigger a major
site plan amendment.Rev 1.Applicant has included these 8 units in this site plan; however,the lot count through
sheet 1 of the site plan shall also be updated to accurately reflect the 65 units being proposed.Also,in the phasing
note on sheet#1 please remove the note that states: "the future 8 townhome units will be constructed in a separate
5. [21.7(c)] Currently the plans propose offsite sidewalks,curbs, and grading located on the adjacent C-1 zoned property,
specifically to the south and east property lines of the site and at the entrance along Camelot Drive. Prior to the minor site
plan being approved a boundary line adjustment plat and or easement plat shall be reviewed and approved to permit the
improvement to remain in their current location.Additionally,prior to plat approval a special exception to the 20'
undisturbed buffer requirement of Section 21.7(c) shall be submitted and approved prior to plat and/or site plan approval.
Rev 1: The applicant has applied for special exceptions related to omitting the sidewalk and landscape strip on the
southern portion of Elm Tree Court.The special exceptions shall be approved by the Planning Commission prior
to site plan approval.
6. [32.7.2.3, 14-422(B),Design Standards Manual(F)] Sidewalks. The sidewalks in the development shall be 5' wide,
currently they are 4' wide.Revise.Rev 1: The applicant has applied for a special exception to facilitate this
reduction.The special exceptions shall be approved by the Planning Commission prior to site plan approval.
7. [32.7.9, 14-317] Depict, dimension, and label all 6' landscape easements for the street trees to be permitted on
residential lots. Depict, dimension, and label the sidewalk and access easements on the residential lots. Prior to final plat
approval a maintenance agreement for these plantings and the sidewalks shall be reviewed and approved by the County
Attorney. Additionally, a maintenance agreement for the private street shall also be submitted for review and approval by
the County Attorney.Rev 1: Comment partially addressed,pending submittal of legal does for County Attorney
review/approval.
Christopher Perez I Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
2
Christopher Perez
From: Nena H <ulcwww@embargmail.com>
Sent: Monday, March 25, 2019 8:35 AM
To: Christopher Perez
Cc: Scott Collins; David Benish; Hunter
Subject: Re: Briarwood Phase 8
Chris,
I sincerely hope we can avoid going to the BOS with this new comment.The timing is a killer.That is why we agreed to
install sidewalk along Camelot Drive even though no one in Briarwood will ever use that sidewalk.Timing is critical.We
are out of lots and expected to have plan approved by now. Please help us avoid this major delay. Please keep in mind
this was part of an approved plan that we are not modifying.We are happy to meet at any time today-this is just a
major setback.
Thank you,
Nena Harrell
434-975-3334
Sent from my iPhone
On Mar 22, 2019, at 3:20 PM, Christopher Perez<cperez@albemarle.org>wrote:
Scott,
I received your email and met with my supervisor and will be sending you/the applicant an email on
Monday.
I'd like to hold off on having this meeting with yall till you receive the email and digest its contents.
Then would be the most appropriate time to meet.
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From:Scott Collins<scott@collins-engineering.com>
Sent: Friday, March 22, 2019 2:51 PM
To:Christopher Perez<cperez@albemarle.org>
Cc: Nena Harrell<ulcwww@embargmail.com>
Subject: RE: Briarwood Phase 8
Chris-
I never heard a response back, do you have time on Monday to meet on this.
Thanks.
Scott
1
From:Scott Collins s.
Sent: Friday, March 15, 2019 11:53 AM
To:'Christopher Perez'<cperez@albemarle.org> •
Cc: Nena Harrell<ulcwww@embarqmail.com>
Subject: RE: Briarwood Phase 8
Chris-
Thanks for the email. Maybe we can have meeting to discuss this, because all the storm sewer that you
are mentioning below has been previously approved and previously installed from the original approved
site plan. We are working with the county and the requirements of the subdivision ordinance with the
request for the sidewalk variances and installing the sidewalk within the Camelot development, but an
existing storm sewer that was installed under an approved site plan,we should not be held to a
requirement of requesting a special exception from the BOS.
Let's meet and discuss this further. This was previously approved,and nothing that we are doing now is
taking away or changing what was previously approved and what can be platted under the previously
approved site plan.
We could come in and plat the road under the previously approved site plan,then come back with a
subdivision plat just for the lots and this would not be a requirement. It seems unnecessary to jump
through these hoops.
Thanks.
Scott
From:Christopher Perez<cperez@albemarle.org>
Sent: Friday, March 15, 2019 11:39 AM
To:Scott Collins<scott@collins-engineering.com> •
Cc: Nena Harrell<ulcwww@embargmail.com>
Subject: Briarwood Phase 8
Scott,
RE: SDP2018-83 Briarwood Phase 8 -Minor Amendment
SUB2019-39 Briarwood Phase 8—Final Plat
I just received the final plat for phase 8 of Briarwood (SUB2019-39). This document clearly
labels the proposed offsite storm drainage easements.
Seeing these easements caused me to go back to the minor amendment for a quick comparison.
Those easements were not labeled nor dimensioned on the site plan but they need to be.
Also, during the comparison I noticed that special exception request to the BOS which was
previously mentioned in order to disturb the 20' undisturbed buffer, is still applicable/needed.
The SE request should include the following:
- The proposed private storm drainage easements on the commercial site within the 20'
undisturbed buffer
- An existing 21"RCP Storm Sewer Pipe through the commercial site within the 20'
undisturbed buffer
- A small portion of grading through the commercial site within the 20' undisturbed buffer,
towards Camelot Court
2
I
All of the above disturbances are in the buffer and need to be included in the SE request to the
BOS.
If you know of any others being proposed in this area include them in the request.
Thus two additional comments are being added to Planning's review of SDP2018-83
1. Labeled and dimension the private storm drainage easements on the site plan.
2. [21.7(c)] Prior to final plat and minor site plan approval a special exception to the 20'
undisturbed buffer requirement of Section 21.7(c) shall be submitted, reviewed, and approved
prior.
The request can be submitted to me in PDF format. Please submit the request, a break out •
schematic of the area, and provide justifications.
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From:Christopher Perez
Sent: Monday, March 11,2019 1:23 PM
To: 'Scott Collins'<scott@collins-engineering.com>
Subject:SDP2018-83 Briarwood Phase 8-Minor Amendment
Scott,
•
RE: SDP2018-83 Briarwood Phase 8-Minor Amendment
Attached are the review comments for the above ref plan.
Pending VDOT review, to be forwarded once received. They plan to have the comments
completed by 3-13-19.
Christopher Perez I Senior Planner
Department of Community Development'County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5 832 ext.3443
3
Christopher Perez
From: Christopher Perez
Sent: Friday, March 15, 2019 11:39 AM
To: 'Scott Collins'
Cc: Nena Harrell
Subject: Briarwood Phase 8
Scott,
RE: SDP2018-83 Briarwood Phase 8-Minor Amendment -
SUB2019-39 Briarwood Phase 8—Final Plat
I just received the final plat for phase 8 of Briarwood(SUB2019-39). This document clearly labels the proposed
offsite storm drainage easements.
Seeing these easements caused me to go back to the minor amendment for a quick comparison. Those
easements were not labeled nor dimensioned on the site plan but they need to be.
Also, during the comparison I noticed that special exception request to the BOS which was previously
mentioned in order to disturb the 20' undisturbed buffer, is still applicable/needed.
The SE request should include the following:
- The proposed private,storm drainage easements on the commercial site within the 20' undisturbed buffer
- An existing 21"RCP Storm Sewer Pipe through the commercial site within the 20' undisturbed buffer
- A small portion of grading through the commercial site within the 20' undisturbed buffer,towards
Camelot Court
All of the above disturbances are in the buffer and need to be included in the SE request to the BOS.
If you know of any others being proposed in this area include them in the request.
Thu - additional comments are being added to Planning's review of SDP201 -
. Labeled and dimension the private storm drainage easements on the site plan.
2. [21.7(c)] Prior to final plat and minor site plan approval a special exception to the 20' disturbed buffer
requirement of Section 21.7(c) shall be submitted, reviewed, and approved prior.
The request can be submitted to me in PDF format. Please submit the request, a bre out schematic of the area,
androvide justifications.
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5 832 ext.3443
From:Christopher Perez
Sent: Monday, March 11,2019 1:23 PM
To: 'Scott Collins'<scott@collins-engineering.com>
Subject:SDP2018-83 Briarwood Phase 8-Minor Amendment
1
Scott,
RE: SDP2018-83 Briarwood Phase 8 -Minor Amendment
Attached are the review comments for the above ref plan.
Pending VDOT review, to be forwarded once received. They plan to have the comments completed by 3-13-19.
Christopher Perez I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
•
COUNTY OF ALBEMARLE
0 Department Community Development
Planning Services Division
ty,10.7: 401 McIntire Road North Wing•Charlottesville,Virginia 22902-4596
Phone: (434)296-5823 •Fax: (434)972-4035
Transmittal
From: Christopher Perez Date: 03/15/19
To: 0 °Matt Wentland-Engineering
°Michael Dellinger- Inspections V 0
°Adam Moore-VDOT 0 R,c lsb, _ / 1
0
°Shawn Maddox-Fire and Rescue 0
JOB#/FILE NAME: SUB2019-39 Briarwood Phase 8 (49 lots)- fmal plat
We are sending you the following items: ® Attached or ❑ Under separate cover
❑ Copy of Letter ❑ Prints ❑ Plans
❑ Plats ❑ Specifications ❑ Other
# of Date Description
Copies
1 ffmal plat
These are transmitted as checked below:
® For review and comments ® For approval ❑ Other
Remarks: