Loading...
HomeMy WebLinkAboutSUB201800040 Review Comments 2019-05-15 Christopher Perez From: Christopher Perez Sent: Wednesday, May 15, 2019 8:57 AM To: Tm Miller Cc: Frank Pohl; Mazurowski, Alan Subject: SUB201800040 Drillers Lane Subdivision - Final Subdivision Plat Attachments: Lot 1 primary and reserve drainfield conversation.pdf Tim, SUB201800040 Drillers Lane Subdivision - Final Subdivision Plat I was closing out the recently approved file for the above referenced subdivision plat and discovered an important review comment was never fully addressed. Does Lot 1 have a primary and reserve drainfield on it that serves building#801 and building#803? Please provide a surveyed exhibit or plat w/ your signed seal verifying the location of the existing primary and reserve drainfield on Lot 1 that serves these existing structures. If the lot does not contain this please provide soil work for VDH approval to get this proposed lot into conformance. I will need this completed prior to approval of the final plat. See attached correspondence discussing the original comment. Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 `Christopher Perez From: Christopher Perez Sent: Thursday,April 26, 2018 8:44 AM To: 'tmiller@meridianwbe.com' Subject: FW: SUB2018-40 Drillers Lane Subdivision - Final Subdivision Plat Tim, Attached are more detailed VDH comments that I received on Tuesday. It appears the only outstanding comment which needs to be addressed for VDH approval is Lot 1, see below highlighted section. Christopher P.Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Mazurowski,Alan<alan.mazurowski@vdh.virginia.gov> Sent:Tuesday,April 24, 2018 1:38 PM To:Christopher Perez<cperez@albemarle.org> Subject: Re:SUB2018-40 Drillers Lane Subdivision - Final Subdivision Plat Mr. Perez, This is to follow-up on our phone conversation earlier today and your questions, above, in regard to my review of the Drillers Lane Subdivision Plat. LOT 2 The certification letter recently issued by this office is for a primary and 100%reserve drainfield areas, both located on the proposed Lot 2 in the area indicated on the plat. While this area was evaluated and certified to serve an office and receive up to 100 gallons/day, until the proposed use is specified in terms of numbers of employees, shifts, customers, etc., I cannot state whether the certified area will have sufficient capacity. Assuming the use will be an office(commercial), the actual septic system design will have to be determined by a professional engineer. LOT 1 ctip �''f 15 I have been unable to determine from our files whether the location of primary and reserve drainfields for the two existing office buildings (#411 and 413)arc located within the proposed boundaries for the lot. I suggest these areas be identified and sut veyed ont the plat to confirm that they are located within the new lot boundaries. 11 RESIDUE e0 Based on scaled drawings on file, I am confident that the location of the primary and reserve drainfield areas serving the residue will not be interfered with by the proposed new lot boundaries. All components of the existing system and reserve areas will remain within the boundaries of the residue parcel. CENTRAL WATER SYSTEM The water system is approved for up to 13,200 gallons/day, of which they are currently only using about 1/3, so unless the development of lot 2 will require huge amounts of water, no assessment or permitting will be required by the Office of Drinking Water. 1 Please let me know if there are any questions or clarifications needed. Alan Alan Mazurowski Environmental Health Supervisor Onsite Sewage &Private Well Programs Thomas Jefferson Health District 1138 Rose Hill Drive Charlottesville, VA 22906 434-972-4306 office 434-972-4310 fax On Fri, Apr 20, 2018 at 2:27 PM, Christopher Perez <cperezna,albemarle.org> wrote: Alan, RE: SUB2018-40 Drillers Lane Subdivision - Final Subdivision Plat I received your letter on the above ref project confirming approval of Lot 2 (attached). Prior to final subdivision plat approval I also need VDH approval on a few other items, as follows: 1) I need VDH approval verifying the new Lot 1 contains both a primary and reserve drainfield on the lot. 2) I need VDH approval verifying the new residue lot(22.684 acres) still contains both a primary and reserve drainfield on the lot. 3) Verification or approval from VDH that the new building on Lot 2 will/can be adequately served by the central system. Please give me a call and let's discuss. Christopher P. Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Mazurowski,Alan<alan.mazurowski@vdh.virginia.gov> Sent:Wednesday,April 11, 2018 3:11 PM To:Christopher Perez<cperez@albemarle.org> Subject: Review comments, Drillers Lane Subdivision 2 Chris, please see attached comments Alan Alan Mazurowski Environmental Health Supervisor Onsite Sewage & Private Well Programs Thomas Jefferson Health District 1138 Rose Hill Drive Charlottesville, VA 22906 434-972-4306 office 434-972-4310 fax 3