Loading...
HomeMy WebLinkAboutARB201900065 Action Letter 2019-09-18COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone 434 296-5832 Fax 434 972-4126 September 18, 2019 Casey 5tetan Stony Point Design Build 200 Garrett Street, Suite O Charlottesville VA 22903 RE: ARB-2019-65: Shops at Riverside Village Comprehensive Sign Plan (078G00001000A0) Dear Applicant, The Albemarle County Architectural Review Board reviewed the above noted item at its meeting on Monday, September 16, 2019. The Board unanimously approved the request, pending staff administrative approval of the following conditions: 1. Revise the sign plan to establish additional parameters to ensure a level of compatibility in signs across the building. 2. Delete the second "General Note" on sheet 2. 3. Revise the sign plan to limit sign types to establish a level of compatibility in signage across the buildings. Limit wall sign types to channel letters and flat cut out letters. 4. Revise the sign plan to limit sign colors to establish a level of compatibility in signage across the buildings. 5. Revise the sign plan to limit sign locations to establish a level of compatibility in signage across the buildings. Commercial signage shall not be placed on or at the level of the wood siding and shall not extend into that zone. 6. Provide additional information on proposed sign materials. 7. Revise the sign plan to indicate maximum letter size for the face of the canopies on the 9.5" canopy is 5.5" and 24" for the 37" canopy. 8. All illumination shall be non -blinking. 9. Revise the sign plan to limit illumination to establish a level of compatibility in signage across the buildings. 10. Revise the sign plan to state that cabinet/panel signs will have opaque backgrounds. Cabinet and panel signs may only be suspended from canopies/awnings. 11. Submit a final monument sign design for review. Please provide: 1. Two full sets of revised drawings addressing each of these conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. 3. The attached "Revised Application Submittal" form. This form must be returned with your revisions to ensure proper tracking and distribution. When staffs review of this information indicates that all conditions of approval have been met, a Certificate of Appropriateness may be issued. If you have any questions, please do not hesitate to contact me. Sincerely, Margaret Maliszewski Chief of Planning/Resource Management 434-296-5832 x3276 mmaliszewski@albemarie.org cc: Beth Robinson, Hightech Signs, 2165 Seminole Trail, Charlottesville, VA 22901 Shops at Riverside LLC, 200 Garrett Street, Suite S, Charlottesville, VA 22902 File COUNTY OF ALBEMARLE Department of Community Development REVISED APPLICATION SUBMITTAL This form must be returned with your revisions to ensure proper tracking ana distribution. County staff has indicated below what they think will be required as a resubmission of revisions. If you need to submit additional information, please explain on this form for the benefit of the intake staff. All plans must be collated and folded to fit into legal size files, in order to be accepted for submittal. TO: DATE: PROJECT NAME. Submittal Type Requiring Revisions () indicates Submittal Code County Project Number # Copies Erosion & Sediment Control Plan E&S Plan MP -Mitigation Waiver Reg uest WR Stormwater Management Plan SWMP Road Plan RP Private Road Request, with private/public comparison PRR Private Road Request — Development Area PRR-DA Pre�iminary Site Plan PSP Final Site Plan or amendment FSP Final Plat FP Plat PP -Preliminary Easement Plat EP Adjustment Plat BAP -Boundary Rezoning Plan REZ Special Use Permit Concept Plan SP-CP Reduced Concept Plan R-CP Proffers P Bond Estimate Request BER Draft Groundwater Management Plan D-GWMP Final Groundwater Management Plan F-GWMP Testing Work Plan ATWP -Aquifer Groundwater Assessment Report GWAR Architectural Review Board ARB Other: Please explain (Fnr staff ijGP nnly) Submittal Code # Copies Distribute To: Submittal Code # Copies Distribute To: ARB 2 Margaret Maliszewski