HomeMy WebLinkAboutSDP201700062 Review Comments Letter of Revision 1 2019-09-19County of Albemarle Department of Community Development Memorandum To: Justin Shimp, PE, Shimp Engineering (justinkshimp-en ing eering com) From: Tim Padalino, AICP — Senior Planner Division: Planning Date: September 19, 2019 Subject: Review Comment Letter #3 for SDP201700062 (Riverside Village Block 1) — Letter of Revision (LOR) #1 The above -referenced Letter of Revision (LOR) (dated 8/22/2019) to approved Final Site Plan SDP201700062 has been reviewed by the Planning Division of the Albemarle County Department of Community Development (CDD), and has been transmitted to other County Divisions and Departments and applicable Site Review Committee (SRC) member agencies for review and comment. The LOR is currently not acceptable per applicable Albemarle County Code, and is not approved at this time. The Planner will approve the LOR referred to above when the following items (below) have been satisfactorily addressed, and when tentative approvals are granted by all other SRC members (as applicable). The following comments are those that have been identified at this time; additional comments or conditions may be added or eliminated based on further review. [Comments include applicable reference(s) to the Albemarle County Code.] 1. [Z.O. Sections 32.6.2.a and 32.5.2.n]: Proposed new and modified retaining walls must be identified by height. (Also see CDD-ARB review comment #3.) Update 8/21: Addressed. 2. [Z.O. Sections 32.4.3.2 and 32.4.3.6.a]: Tentative approval(s) must be obtained from all other applicable SRC members prior to CDD-Planning granting approval of this LOR #1 for SDP201700062. The review statuses of each applicable SRC member are provided below. Please resubmit revised materials to my attention, and then continue to coordinate directly with all applicable SRC members to address and resolve outstanding review comments. After all required revisions have been made, and after each applicable SRC member has signified their tentative approval, please submit copies of the plans to CDD for approval signature. Albemarle County Building Inspections —Michael Dellinger, mdellinger(kalbemarle.org — "No Objection." See attached review status letter (8/9/2019). Albemarle County Engineering Services — John Anderson, janderson2(kalbemarle.org_— "Requested Changes." See attached review comments (8/28/2019). Albemarle County Architectural Review Board — Margaret Maliszewski, mmaliszewski(kalbemarle.org — "Approved" See attached review status letter (9/18/2019). Please contact Tim Padalino at the Department of Community Development at (434)-296-5832 ext. 3088 o►- tpadalinogalbemarle.org for further information or assistance. Thank you. 1 of 2 Review Comments for SDP201700062 IFinal Site Development Plan Project Name: Riverside Village Block 1 Date Completed: Friday, August 09, 2019 DepartmentlDi+visionlAgency: Review Sys: Reviewer: Michael Dellinger CDD Inspections No Obje-Ction Page: County of Albemarle Printed On: 0812'U20'19 Review Comments for SDP201700062 lFinal Site Development Plan Project Name: Riverside Village Block 1 Date Completed: Wednesday, August 28, 201 D e pa rtm e nt1D ivis i o n/Ag e n cy: Review Sys: Reviewer: John Anderson CDD Engineering El I Requested Changes 1- Provide VDOT LD-204 (inlets comps) and LD-229 (storm sewer design)tables for pipe and grate, tr-A11-A9- (Rev- 1) Withdrawn- See item 2-, below- (Rev 2) Not addressed- In letter d- 8123, Shimp Engineering (SE) writes: 'Pipe A-11 to A-9 is a proposed item, while the majority of the drainage system (in grayscale) is existing- This is the reason this pipe is not in gray - scale, just as the new roof drains are not in gray -scale-' Since proposed, please respond to initial comment- Note: SE response to initial comment, this item (letter d- i130119): 'Please note that Str_ All-A9 is part of the approved site plan and is not included in the LOR-' Please clarify- If proposed, respond to initial comment- 2- Show tr-A11-Ag in revision cloud, if new with /included with LOR- (Rev- 1)Addressed- As follow-up, revise black line -type to grayscale, like other prior -approved elements of drainage system- [tr- A11-A9 is part of the approved plan and is not included in the LOR] (Rev- 2) Not addressed- If Str_ All-A9 is proposed with LOR, include Str_ All-A9 in revision cloud - Also, please see item 1-, above- 3- Provide auto -turn showing path from Rt- 20 to dumpster enclosure- Ensure no parked or fixed object conflicts with auto -turn figure- Ref- image, below- ( DOT Road Design Manual, Appx- B1, p- B(1)-5) (Rev- 1) Partially addressed- As follow- up: For dumpster located near right edge of plan sheet C2, provide Auto -turn to indicate maneuver required to exit- (Rev 2) Addressed- 4- Provide recommended cover information for new grease trap since proposed in traffic area- (Rev- 1)Addressed. 5- Provide grease trap profile lmfr- details consistent with proposed location Recommend remove from paved area for example, shift from pavement to a parking lot grassed island, if possible- (Rev 1:, Addressed Page: County of Albemarle Printed On: 10911912019 Review Comments for SDP201700062 IFinal Site Development Plan Project Name: Riverside Village Block 1 Date Completed: Wednesday, September 18, 2019 DepartmentlDi+visionlAgency: Review Sys: Reviewer: Margaret Maliszewski��ARB Approved Page: County of Albemarle Printed On: 091'191 1919 PROJECT MANAGEMENT sHimp CIVIL ENGINEERIN G LAND PLANNING ENGINEERING : August 23"d, 2019 Mr.Tim Padalino,AICP Senior Planner Albemarle County Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Regarding: SDP 2017-62-Riverside Village Block 1 LOR-Comment Response Transmittal Dear Mr. Padalino, Thank you for your review of the LOR for Riverside Village Block 1. We have addressed your most recent comment package dated August 21, 2019. Please find attached the submittal package for the revised Letter of Revision for Riverside Village Block 1. The following items have been included with this submittal: • LOR Comment Response (Engineering—John Anderson) (1 Copy) • LOR Comment Response (ARB—Heather McMahon) (1 Copy) • Revised LOR Plan (4 Copies) If you have any questions or concerns about these revisions please feel free to call Justin at (434) 227-5140 and we can discuss any questions that you may have in further detail. Best Regards, Michael Chandler Shimp Engineering, P.C. Page 1 of 1