HomeMy WebLinkAboutSDP201700062 Review Comments Letter of Revision 1 2019-09-19County of Albemarle
Department of Community Development
Memorandum
To: Justin Shimp, PE, Shimp Engineering (justinkshimp-en ing eering com)
From: Tim Padalino, AICP — Senior Planner
Division: Planning
Date: September 19, 2019
Subject: Review Comment Letter #3 for SDP201700062 (Riverside Village Block 1) —
Letter of Revision (LOR) #1
The above -referenced Letter of Revision (LOR) (dated 8/22/2019) to approved Final Site Plan SDP201700062 has
been reviewed by the Planning Division of the Albemarle County Department of Community Development (CDD),
and has been transmitted to other County Divisions and Departments and applicable Site Review Committee (SRC)
member agencies for review and comment.
The LOR is currently not acceptable per applicable Albemarle County Code, and is not approved at this time.
The Planner will approve the LOR referred to above when the following items (below) have been satisfactorily
addressed, and when tentative approvals are granted by all other SRC members (as applicable). The following
comments are those that have been identified at this time; additional comments or conditions may be added or
eliminated based on further review. [Comments include applicable reference(s) to the Albemarle County Code.]
1. [Z.O. Sections 32.6.2.a and 32.5.2.n]: Proposed new and modified retaining walls must be identified by height.
(Also see CDD-ARB review comment #3.)
Update 8/21: Addressed.
2. [Z.O. Sections 32.4.3.2 and 32.4.3.6.a]: Tentative approval(s) must be obtained from all other applicable SRC
members prior to CDD-Planning granting approval of this LOR #1 for SDP201700062. The review statuses of
each applicable SRC member are provided below.
Please resubmit revised materials to my attention, and then continue to coordinate directly with all applicable
SRC members to address and resolve outstanding review comments. After all required revisions have been
made, and after each applicable SRC member has signified their tentative approval, please submit copies of the
plans to CDD for approval signature.
Albemarle County Building Inspections —Michael Dellinger, mdellinger(kalbemarle.org —
"No Objection." See attached review status letter (8/9/2019).
Albemarle County Engineering Services — John Anderson, janderson2(kalbemarle.org_—
"Requested Changes." See attached review comments (8/28/2019).
Albemarle County Architectural Review Board — Margaret Maliszewski, mmaliszewski(kalbemarle.org —
"Approved" See attached review status letter (9/18/2019).
Please contact Tim Padalino at the Department of Community Development at (434)-296-5832 ext. 3088 o►-
tpadalinogalbemarle.org for further information or assistance. Thank you.
1 of 2
Review Comments for SDP201700062 IFinal Site Development Plan
Project Name:
Riverside Village Block 1
Date Completed:
Friday, August 09, 2019
DepartmentlDi+visionlAgency:
Review Sys:
Reviewer:
Michael Dellinger
CDD Inspections
No Obje-Ction
Page: County of Albemarle Printed On: 0812'U20'19
Review Comments for SDP201700062 lFinal Site Development Plan
Project Name:
Riverside Village Block 1
Date Completed:
Wednesday, August 28, 201
D e pa rtm e nt1D ivis i o n/Ag e n cy:
Review Sys:
Reviewer:
John Anderson
CDD Engineering
El
I Requested Changes
1- Provide VDOT LD-204 (inlets comps) and LD-229 (storm sewer design)tables for pipe and grate, tr-A11-A9- (Rev- 1)
Withdrawn- See item 2-, below- (Rev 2) Not addressed- In letter d- 8123, Shimp Engineering (SE) writes: 'Pipe A-11 to A-9 is a
proposed item, while the majority of the drainage system (in grayscale) is existing- This is the reason this pipe is not in gray -
scale, just as the new roof drains are not in gray -scale-' Since proposed, please respond to initial comment- Note: SE
response to initial comment, this item (letter d- i130119): 'Please note that Str_ All-A9 is part of the approved site plan and is
not included in the LOR-' Please clarify- If proposed, respond to initial comment-
2- Show tr-A11-Ag in revision cloud, if new with /included with LOR- (Rev- 1)Addressed- As follow-up, revise black
line -type to grayscale, like other prior -approved elements of drainage system- [tr- A11-A9 is part of the approved plan and is
not included in the LOR] (Rev- 2) Not addressed- If Str_ All-A9 is proposed with LOR, include Str_ All-A9 in revision cloud -
Also, please see item 1-, above-
3- Provide auto -turn showing path from Rt- 20 to dumpster enclosure- Ensure no parked or fixed object conflicts with
auto -turn figure- Ref- image, below- ( DOT Road Design Manual, Appx- B1, p- B(1)-5) (Rev- 1) Partially addressed- As follow-
up: For dumpster located near right edge of plan sheet C2, provide Auto -turn to indicate maneuver required to exit- (Rev 2)
Addressed-
4- Provide recommended cover information for new grease trap since proposed in traffic area- (Rev- 1)Addressed.
5- Provide grease trap profile lmfr- details consistent with proposed location Recommend remove from paved area for
example, shift from pavement to a parking lot grassed island, if possible- (Rev 1:, Addressed
Page: County of Albemarle Printed On: 10911912019
Review Comments for SDP201700062 IFinal Site Development Plan
Project Name:
Riverside Village Block 1
Date Completed:
Wednesday, September 18, 2019
DepartmentlDi+visionlAgency:
Review Sys:
Reviewer:
Margaret Maliszewski��ARB
Approved
Page: County of Albemarle Printed On: 091'191 1919
PROJECT MANAGEMENT
sHimp CIVIL ENGINEERIN G
LAND PLANNING
ENGINEERING :
August 23"d, 2019
Mr.Tim Padalino,AICP
Senior Planner
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville,VA 22902
Regarding: SDP 2017-62-Riverside Village Block 1
LOR-Comment Response Transmittal
Dear Mr. Padalino,
Thank you for your review of the LOR for Riverside Village Block 1. We have addressed your most recent
comment package dated August 21, 2019. Please find attached the submittal package for the revised Letter of
Revision for Riverside Village Block 1. The following items have been included with this submittal:
• LOR Comment Response (Engineering—John Anderson) (1 Copy)
• LOR Comment Response (ARB—Heather McMahon) (1 Copy)
• Revised LOR Plan (4 Copies)
If you have any questions or concerns about these revisions please feel free to call Justin at (434) 227-5140 and we
can discuss any questions that you may have in further detail.
Best Regards,
Michael Chandler
Shimp Engineering, P.C.
Page 1 of 1