Loading...
HomeMy WebLinkAboutSDP201800076 Correspondence 2019-05-30 • This overall project was known by two names, Earlysville Business Park and Drillers Lane. Earlysville Business Park represented the site plan and the WPO. Drillers Lane represented the subdivision plat and the road plan. These projects were reviewed simultaneously. See below for a list of application numbers for these plans. Due to the various application types being review simultaneously, email correspondence sometimes covered multiple review types. I've tried my best to consolidate all correspondence for this application in this file; however, for all correspondence on this project please review the following files. SUB2017-197 Drillers Lane- Road Plan SUB2018-40 Drillers Lane- Final Subdivision Plat SDP2018-76 Earlysville Business Park- Minor Site Plan WPO2018-33 Water Protection Ordinance- Earlysville Business Park VSMP Amendment This portion of the development was first approved under SDP2008-61 Earlysville Business Park - Final Site Plan. Christopher Perez From: Christopher Perez Sent: Friday, May 31, 2019 8:30 AM To: 'tmiller@meridianwbe.com' Subject: RE: SDP2018-76 Earlysville Business Park— Minor Amendment Tim, SDP2018-76 Earlysville Business Park—Minor Amendment I received Engineering and the Building Official's approvals,the plans have now been approved...please come pick up the signed copies.Thanks for your patience. Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent:Wednesday, May 29, 2019 1:30 PM To:Christopher Perez<cperez@albemarle.org> Subject: RE: Earlysville Business Park Chris, Any updates from engineering and building? - Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com Meridian • Planning Group From:Christopher Perez<cperez@albemarle.org> Sent:Thursday, May 23, 2019 10:48 AM To:tmiller@meridianwbe.com Subject: RE: Earlysville Business Park The subdivision plat is already approved and recorded I believe. The WPO and Road plan are approved. The actual site plan is the only thing left and is out on review by Engineering and Building Official. I'll let you know once I hear back from them. 1 From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent:Thursday, May 23, 2019 10:46 AM To: Christopher Perez<cperez@albemarle.org> Subject: Earlysville Business Park Chris, Can you let me know when the signed plans are ready? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com f - Meridian ), .: fji Planning Group 2 Christopher Perez From: Christopher Perez Sent: Wednesday, May 29, 2019 2:26 PM To: tmiller@meridianwbe.com Subject: RE: Earlysville Business Park I just received Engineering's no objection. I am awaiting something from the building official.He has been t sick but is back today catching up. He hopes to have it done either tomorrow or Thursday. I'll let you know what he says. From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent:Wednesday, May 29, 2019 1:30 PM To: Christopher Perez<cperez@albemarle.org> Subject: RE: Earlysville Business Park • Chris, Any updates from engineering and building? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com • f-{ Merl . Ian gxY: Planning Group From:Christopher Perez<cperez@albemarle.org> Sent:Thursday, May 23, 2019 10:48 AM To:tmiller@meridianwbe.com Subject: RE: Earlysville Business Park The subdivision plat is already approved and recorded I believe. The WPO and Road plan are approved. The actual site plan is the only thing left and is out on review by Engineering and Building Official. I'll let you know once I hear back from them. From:tmiller@meridianwbe.com <tmiller@meridianwbe.com> Sent:Thursday, May 23, 2019 10:46 AM To:Christopher Perez<cperez@albemarle.org> Subject: Earlysville Business Park 1 Chris, Can you let me know when the signed plans are ready? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com' • iVieridian 77 Planning Group • • • - Christopher Perez From: tmiller@meridianwbe.com Sent: Friday, May 17, 2019 3:09 PM To: Christopher Perez Cc: 'Donnie Foster' Subject: RE: Site plan Attachments: 31-21A-SPA-C-202.pdf Chris, Here is the sheet that shows the DB references for Drainage and SWM facility easements. Can you confirm that addresses your comment? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com -,{ •�, i\4eridian Planning Group From:Christopher Perez<cperez@albemarle.org> Sent: Friday, May 17, 2019 2:21 PM To:tmiller@meridianwbe.com Subject: RE:Site plan Sounds good...thanks From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent: Friday, May 17, 2019 2:11 PM To: Frank Pohl<fpohl@albemarle.org>; Christopher Perez<cperez@albemarle.org>; 'Donnie Foster' <dffosterwell@icloud.com> Subject: RE:Site plan I will add the DB and PG to the site plan and get Chris four more copies. Thanks, Timothy Miller, P.E., L.S. Principal 1 434-882-0121 www.meridianwbe.com Meridian Planning Group From: Frank Pohl<fpohl@albemarle.org> Sent: Friday, May 17, 2019 2:06 PM To:tmiller@meridianwbe.com; Christopher Perez<cperez@albemarle.org>; 'Donnie Foster' <dffosterwell@icloud.com> Subject: RE: Site plan Chris will need to answer that question. Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From:tmiller@meridianwbe.com <tmiller@meridianwbe.com> Sent: Friday, May 17,2019 2:03 PM To:Christopher Perez<cperez@albemarle.org>; 'Donnie Foster'<dffosterwell@icloud.com> Cc: Frank Pohl <fpohl@albemarle.org> Subject: RE:Site plan Frank, Did you say that since this is a subdivision the site plan can be approved without the DB and PG numbers? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com 1\4. ei d I a n Planning Group • From: Christopher Perez<cperez@albemarie.org> Sent: Friday, May 17, 2019 1:03 PM To:'Donnie Foster<dffosterwell@icloud.com> 2 - F � Cc:Tm Miller<tmiller@meridianwbe.com>; Frank Pohl<fpohl@albemarle.org> Subject: RE:Site plan Mr.Foster, SDP2018-76 Earlysville Business Park—Minor Amendment. We've been waiting on approvals of the WPO,the Road Plan, and the Final Plat.The final plat approval just happened this week. Thus it appears all we are waiting on is a revision from Tim Miller that provides all the recorded deed book page ref information for the easements and lots associated with the site plan(see comment#9 below). Once he adds this information to the site plan,have him submit 4 signed copies for my approval and we are finished with this project. 9. [Comment] Prior to site plan approval the plat shall be approved and recorded as it provides the RAW, Also,associa with the plat-deed of dedications are required for all public drainage casements. Please provide the deed of dedications for County Auor ney review and approval. Rev 1.Comment still relevant.See Final Subdivision plat comments for next stens with the.pint (SC7112018-401. Christopher Perez I Senior Planner Department of Community Development'County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 Original Message From: Donnie Foster<dffosterwell@icloud.com> Sent: Friday, May 17, 2019 12:54 PM To: Christopher Perez<cperez@albemarle.org> Subject:Site plan Chris can you tell me when the site plan for 4FLLC Earlysville business park will be approved.Thank u Donnie Foster Sent from my iPhone 3 • /' / //' /—•` '\ ``i'r\ \ / (/- 1'/ ".tlP1%'<�"r' / / / `a�\Mrx y3 st� xa• o ao• ao' so• / /%9 /,\ \\� '\\. / \ /) ( p p�jQr�ptlA• ''/ L • ,kx 00 1,o Exist.15'Public SWF ' ' i6 l...:::•::=..../�//. % ) tltl "°Ma�q / 1 .... Access Easement /i'•:saol////6� / ..e.'f' '' /' / � ' • ,� p- ytl��tl?°A1"tl_ H • A t oDB 5166-651 / �`, v 5 / ,.Kst/ / /. / 1 "0""08�° I ( o / RNStltl��C1Otl �Pt toiRtl s / _ \ / / /'. ��;."60!y6w e 6ef/ '��ha�°�iuuun"tnaenxontlN:a��� \ ���_ \ \ / / I 1 ay:: .:S 'oiF'/ / /' //,d/�- tom-- ��6� ,<l_`� \\\`a o u �` �� \ \ \ \ / \R11`,!��;; %.::[•• ,/ '/0'{ /// 0/ st. e Width \ / n /\ Exist.40'Public SWF / \\ `;"/,• /' h l� \ ___:-......„,..,,,,,,,N,`\ / Access Easement - - \ \ \_��,,/', 6 /. / o61ic acility /��\-_- / Z __\_ \ \ N DB 5166-651 4„ `X\ N. '/ ' c/ /' EasemiVsnairtg5F1 -558- `--� _/ U T�__ \ \ \\ \ i-fi_..i, r/ -� , -_-�, . / / /<�ii�� DB 51651 i—J / ` _ ----——_ .. , N,/, ''.. ---..___ :;.,,Apri-, ..„ z2',E1,1 -I 1 \ \ \ \ \ •'' • O .° • \Ns\\\\ r—\ s4------------- !I 8 I \ < )Jill\ \ \ ▪ \ .✓ \ \ ., Pm W . I. 1 jl�ll _ �_ 1 _ o' \ \ \ \ T s/ ,1' I IC WAIT �\ \LOT�1'- I %":� I ,�' Z. Exist-Trees —.—————— --- w a \ \ \ \ \ i.„ Tc 5]150 \\ I �`/ t\ (To Remain) _\ 1 1 � 4111.•4911 rowwi \\ Ps>s.. III \ " /// \�� \ • c Cam' Z� ES--I \\\ `\\ \iC'`.6'`.•� I\ AA \•, \ \� '�� ` - __-�� 'i �� •eau.or6aB I r ♦/ \ \ \ ,/ . ., \ .*, V / ` \, /��° o I B ilding I / \xno.eoaa P�tQea \ \ \ \ N I / \ x' r ���_� ./ Exist.20'Pa i n)-vr r� s \ \ "'` \\II \ '\\\ r\ \ 1 \ / Drainage Ea meet \/ ' \ B.aoos \ \ 1 \ s s \ \Ne�O� �\ ;\Q •\ \ \n�--J W DB 5166- , c2 �I •.• \PrE-nsoo \ \ \ <s. r \• SWM-� \'g \ / g C c /6 & C 586T: : ��' 1 •,96 98 \ \ \ 1 I \ 1 • Js •'�.. \ Exist Variabledth- - \`L� 1 / \ 4,5705a \ \ I \ \ \ \ \ \Public SWId Facility _ - _ Exist Channel_ / —b /F f' //1/ o BW 5)S50 _Nn Relom9 Mall\ I l \\\ \\ \ 'Easement \\ - _ _ \ 1 N sa .M�a x \ \ \ \ \ De s16s-ss1 \ \_ / �i . /)) BM 5)S.IXI Naa Meiq l=6.V 5]5 W \\ .-M \\ \ \ \ � '\ \ \ v' /Tf/589.30 19 \ 0s]ss0 \ e s)sao Wa\ \ \\ �, \\• \ \ �S o oa^R�� ,` \ '�1�__c., 1 New 10' Nn \\\ \ \ .\\ •\ \ \• \ \ \ \ <,<, • • w,�, ►� Gravel \e,i, \ maAr a \ i \ k ,. \ \ \ \\ 1 ., ,` r. � t Access \ \\\\ \ r.: i' ,, \ . \— - - Exist.Pavement \ Drillers Lane Public Porli. I.- t.�I.U�t-474fr \ \ \ \ w\� I I . \ ��(To Remain) \ 40'Public�qv \\ w `r�I ��� \� ` ` .• 2il�ti�j���d /' ••�/ \ _\\ � _-` _ — �F n _ -- _ i� a. � ny ��� �2�iik•li�.��_'hes C o\ \\ \� ._--�` q a Exist Trees_TC 58�-' ``\ / p�s( /sy I ./ tar_iV. \�\ \ \`\ \—`\—��—__ \, W iC/) L4 --- -----(To amain) r "�� C 58 Oe 6G:Ooo� QOF T`i�'"-• \ ` C.4 F / / TC 590.56 ��� r TC 59056 !•r, �Exisl 10'Public l —� �� Rt / .. — _ .. — \ 1 \. Drainage Easement _�%\rees��� \_� -_�`_ 0.W -Exist Trees ` \ -^'11�1 TDB 5766-662 (To RemaEl) — W �' C � (To Remain) I \N 1 l� _ F \ \ \ xist.15'Public SWF� ��- \ — vy z :\•. .. .. .._'---_---.--_--_ \ \ \ / \\ \Access Easement -- - _ - \� c �. \\ �- \ \ ` N 'DB 5166-651 ��� �� 0O C4 r 6 1 1 `,) ( ) N. '\ ------ _--— SZ a \\\\ - �_--_.—-� ; I `\\ \\ \ a \\\ \\�. \ \��\ \` �- =`` SHEET N0. .•n \ I \\ ' - C-202 N \ 1 I / ) \ \ - — — — \ \ \ \�— __-- SHEET 4 of 7 44 Christopher Perez From: Frank Pohl Sent: Friday, May 17, 2019 2:06 PM To: tmiller@meridianwbe.com;Christopher Perez; 'Donnie Foster' Subject: RE: Site plan Chris will need to answer that question. Frank V. Pohl, PE, CFM County Engineer 401 McIntire Road Charlottesville,VA 22902 434-296-5832 (ext. 7914) From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent: Friday, May 17,2019 2:03 PM To:Christopher Perez<cperez@albemarle.org>; 'Donnie Foster'<dffosterwell@icloud.com> Cc: Frank Pohl<fpohl@albemarle.org> Subject: RE:Site plan Frank, Did you say that since this is a subdivision the site plan can be approved without the DB and PG numbers? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com 1;4 Meridian '.- Planning Group From: Christopher Perez<cperez@albemarle.org> Sent: Friday, May 17, 2019 1:03 PM To: Donnie Foster<dffosterwell@icloud.com> Cc:Tm Miller<tmiller@meridianwbe.com>; Frank Pohl<fpohl@albemarle.org> Subject: RE: Site plan Mr.Foster, - SDP2018-76 Earlysville Business Park—Minor Amendment. 1 • We've been waiting on approvals ofthe WPO,the Road Plan,and the Final Plat.The final plat approval just happened this week.Thus it appears all we are waiting on is a revision from Tim Miller that provides all the recorded deed book page ref information for the easements and lots associated with the site plan(see comment#9 below). Once he adds this information to the site plan,have him submit 4 signed copies for my approval and we are finished with this project. 9. [Comment] Prior to site plan approval the plat shall be approved and recorded as it provides the RANT, Also,associa. with the plat-deed of dedications are required for all public drainage easements.Please provide the deed of dedications for Coimty Aitm• y°review and approval. Rev 1.Comment still relevant.See Final Subdivision plat comments for next stens with the nlat(S11112018-40). Christopher Perez I Senior Planner Department of Community Development(County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 Original Message From: Donnie Foster<dffosterwell@icloud.com> Sent: Friday, May 17, 2019 12:54 PM To: Christopher Perez<cperez@albemarle.org> Subject:Site plan Chris can you tell me when the site plan for 4FLLC Earlysville business park will be approved.Thank u Donnie Foster Sent from my iPhone • Christopher Perez From: Christopher Perez Sent: Monday, February 11, 2019 8:39 AM To: 'tmiller@meridianwbe.com' Subject: . RE: SDP201800076-Earlysville Business PArk By COB today or mid-day tomorrow I have knocked out all the reviews for Drillers lane (Road, site plan, subdivision)...thanks for your patience. From:tmiller@meridianwbe.com<tmiller@meridianwbe.com> Sent: Monday, February 11, 2019 8:06 AM To: Christopher Perez<cperez@albemarle.org> Subject:SDP201800076-Earlysville Business PArk Chris, Can you tell me the status of the review for this and SUB201800040 Drillers Lane subdivision? Thanks, Timothy Miller, P.E., L.S. Principal 434-882-0121 www.meridianwbe.com (, , _,, Meridian M,w. , .err Planning Group , __ i r - .. ` ALTI o ' ' �1I �d11�iOPJVVE , . ,AL6EµAq�•CNARLOTIESTTESVHL- In Cooperation with the Thomas Jefferson Health District FWVANl7A COUNTY YRA) State Department of Health GREENE COUNTY(STANARDSVtuE) 1138 Rase Hill Drive �ets0^icoJSACNTY YoOMSA) Phone(434)972-6219 P.O.Box 7546 Fax (434)972-4310 Charlottesville,Virginia 22906 April 11,2018 Christopher Perez, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville,VA 22902 RE: Drillers Lane Subdivision-Final SUB2018-40 Mr.Perez: As requested, I have reviewed the site plan (2/20/18) for the proposed subdivision, boundary line changes, and easements. Our office has recently issued a certification letter for the proposed drainfield area shown on Sheet 2, which will serve the new office building on Lot 2. While the specific drainfield capacity and design may change once a septic system construction permit is applied for, the area identified has been certified to meet the Sewage Handling and Disposal Regulations for sewage disposal. If there are any questions or concerns,please give me a call,434-972-4306. i Sincerely, Alan Mazurowski • Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowski@vdh.virginia.gov