Loading...
HomeMy WebLinkAboutSUB200700077 Bond Bond Inspection 2019-05-22 internal Use Onh, �7 rpF Date Received: 23 �K A Paid: 1. �1/. Received by: r �i-sy intake:Forward o Management Analyst %IP . VDo BOND.INSPECTION REQUEST APPROVED PLAN tiSUB2007-00077 PROJECT NAME: Stonewater Subdivision=Public:and Private Roads (Asapproved listed on the appr ved plan) This is to request that an inspection be performed by the County..Where fees are assessed,a fee is required for • : each inspection: .Please check the inspections.requested. 0 VSMPNESCP Erosion Control,Storrnwater Management and/or Mitigation per Water Protection Ordinance.section 17-207&208 5250 ® Subdivision(roads,drainage,etc:)per Subdivision Ordinance section 14-435 and;14-438; $269_ 0 Water&Sewer per Subdivision Ordinance section 14-435 S269 0 Site Development Performance bond:(Incomplete Site Work&Landscape Maintenance) "S3301 TOTAL FEES $269 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department.of Community Development,401 Mclntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5832 -Fax"434-972-4126. All roads and stormwater facilities will require construction record drawings;inspection reports:and completion processes through VDOT or DEQ. Ponds Will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete.. .: The revised estimate should be sent to; EMAIL: _ 1/1414. t+'Gflx.aV V OR REGULAR MAIL ADDRESS: S g of Owner/Develolier. Print Name Date . Revised 1/I512014,7Y241/2015..115/2015 fED a; Cam. Internal Use 0115 ,I ` I /�/' 9 /�D A Date Received: II)1 Fee Paid:V,[�1(.Y/� V ��pF ly�f Received by: ���-I Vt6i�m 7.1-1---------/ Intake: Fon+ord to Management Analyst ©� . ,\ •. ,1�l A ("{8, vrnGos' OX, BOND INSPECTION REQUEST ririf APPROVED PLAN #SUB2007-00077 PROJECT NAME: Stonewater Subdivision-Public and Private Roads (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please check the inspections requested. O VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 $250 El Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $269 O Water&Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $301 TOTAL FEES $269 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EM_A IL: hunter@huntercraigcompany.com OR R,'EQVI. R N9/ 11.ADDRESS: P.O.Box 5509 t; { r ;, F• Charlottesville,VA 22905 C. .gt� /4,,sej LGG ignature of Ow er/Developer Hunter E.Craig,Manager of Rio Road Holdings,LLC Print Name Dat Revised 7/15/2014,7/20/2015, 1 I/3/2015