Loading...
HomeMy WebLinkAboutSUB200700077 Review Comments As-Built Reviews 2019-08-20 COLLINS E Bel G I;NE E R;I N G 200 GARRETT ST,:SUITE K CHARLOTTESVILLE VA 22902 i 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com August 15,2019 David James Department of Community Development 401 McIntire.Ro ad Charlottesville,VA22902 RE: Stonewater Subdivision Asbuilts-(SUB2007-00077) David The following is a response to your comments on the review of the asbuilt plans for the Stonewater subdivision. The corrections have been made,and the plans have been resubmitted for final approval and acceptance. Asboilt Plan Modifications ✓k The deed book and page number has been added to the private streets. See sheet 2 and sheet 6. 2. The field measurement information for Treesdale Way has been used to update the width measurements 73 on the Treesdale way section. This information has been updated on Sheet 6. . As discussed in the email correspondence,this profile was provided and this comment has been withdrawn. V 4. As discussed in the email correspondence,all the profiles were pro provided and this comment has been withdrawn. 0 The testing documents for Penfield Lane and Stonehenge Way were provided,as discussed. Treesdale Way has already been accepted by the County with the Treesdale Park project,and all the design information for this section of the roadway was accepted with the approval of the a Treesdale Park asbuilt plans. The pavement and stone depths for Penfield Road and Stonehenge Way have been provided,along with the CBR reports for these roadways. Treesdale Way is already.accepted. No concrete reports have . been made available,but the majority of the concrete has been in place for 10 years and has held up with / the development. V6. Attached is a completed certification report for the project. Field Modifications COY The private labels have been removed from Penfield Lane address sign ✓2� An additional tree has been installed along.Stonehenge Way at station 1+70:. �. The remaining shrubs have been installed along Stonehenge Way,for a total of 43 IG.shrubs. ��/. . The sidewalk in front of the:remaining lot under construction along Penfield Lane has been completed. t/5. The blocks and debris within STR.S-43 has been removed. 6. The metal post has been removed from the bottom of STR.-S-45. �� ACM d veztl` Qr�2 /�r �,�, Should youhave any questions, please feel free to contact me at 434-293-3719.. . . • • . t n cfdJ.:,o,n. Sincerely, rpeM,o-e, i He r M'`j{e"° Scott Collins, PE . 'rat ri'•• , i, '' Collins Engineering