Loading...
HomeMy WebLinkAboutWPO201900040 Review Comments WPO VSMP 2019-09-23COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Yancey Lumber Project file number: WP0201900040 Plan preparer: Timmons Group [jonathan.showalter@timmons.com] Owner or rep.: Donnie Rose [donnie@rayanceylumber.com] Plan received date: 01 Jul 2019 Rev. 1 received date: 23 Aug 2019 Date of comments: 01 Aug 2019 Rev. 1 comments: 23 Sept 2019 Reviewers: Emily Cox County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Registration statement and certification (section 9) must be signed. Rev. 1: Comment addressed. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No comments. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Nutrient credits must be purchased before plan can be approved. Contact Ana Kilmer (akilmer(&albemarle.orp-) to begin the process. Rev.1: Comment still valid. 2. It appears this plan is showing the drainage area to be the same as the disturbed area. This does not appear to be correct. Please revise and ensure that the correct drainage area to the point of analysis is analyzed. Rev. 1: Comment addressed. 3. Provide back-up showing the justification from CN of 96 to CN of 93. Similarly, show a map clearly showing the areas used in the VRRM spreadsheet for pre and post areas(impervious, turf, Engineering Review Comments Page 2 of 3 etc). Rev. 1: Comment addressed. 4. The plan narrative references design limits of a retaining wall, however, those limits are not shown or explained in this plan. Rev. 1: Comment addressed. 5. Clearly outline how 9VAC25-870-66 is met (channel and flood protection, limits of analysis, etc). Rev. 1: Comment addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is approved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. The construction entrance should be within the limits of disturbance. Rev. 1: Comment addressed. 2. The construction entrance should have a wash rack with an area for the water to go. Rev. 1: Comment addressed. 3. The sequence of construction should say that all permits must be obtained before any work shall begin. Also, the pre -con is not always on site. Sometimes it is in the office. Rev. 1: Comment addressed. 4. Ensure there are sufficient perimeter controls (any silt fence necessary, right-of-way diversions, etc). Rev. 1: Comment addressed. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. Engineering Review Comments Page 3 of 3 After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptfonns.asp?department=cdengwpo