Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000068 Checklist 2010-11-17
pp Ai.,(it, Erosion &. Sediment Control Preconstruction Conference Checklist Name of Plan: /-lb i-fri O TEDu1N cpyrce /3o/S,Q6w AKIN Plan No.: u3Po-gptQ-OO®loB Date: i j/!7/rO 1) Copies of approved plan given to: Owner or Authorized Agent 2. Contractor I 2) Have all the conditions been met? 3) Responsible Land Disturber: (4`' , Cert./Lic.No.: /96 6.6 Type: G¢C6 Address/Phone/Mobil Phone: 23$S S?„Aicft]OLE W'r IL '&20O 996-6063 c Pkikt_p-t;'c5sVrLt.(( VA- 229©( 4)Name of Prime Contractor: CocP Name of Subcontractor: 5)Persons in Attendance: Name Firm y Liuy AteCc7, fi / 6 Q.4)r-P-6 b3- O 6) Date Permit Issued: I ( Ii I t(o (7) ,✓ Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. WG J 1 )� � P Notes: ��-� f��� .,��,� 79 900 644(11))11 r L k co°t) J& LE—,C, 41 I ve,f1-v 2 q L'L-C Revised April 12,2010 / ° /o/i�/i of C:\Documents and Settings\rlilly\Local Settin s\Temporary Internet Files\Content.Outlook\HFH7DNHW\Erosion Preconstruction Conf Checklist 4-12- 10.doe