Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000068 Bond Estimates 2010-11-10
BOND ESTIMATE-EROSION CONTROL Spreadsheet last revised:12-5-01 PROJECT NAME: HTCBorrowArea PROJECT NUMBER: WP0201000068 DATE OF ESTIMATE: 11/10/10 ESTIMATE BY: MRG , BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL . SEED, FERTILIZE,MULCH ACRE 4.77 1500 7155 SILT FENCE LF 1100 5 5500 SAFETY FENCE LF 800 3 2400 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 CIP/SEDIMENT TRAP 1 ACRES 2.98 1000 2980 SEDIMENT BASIN.1 ACRES 35.36 1000 35360 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 3 200 600 OUTLET PROTECTION EA 0 200 0 EC-2&3 DITCH PROTECTION • LF 0 10 0 RIP-RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 55995.00 project management 8399.25 subtotal 64394.25 CONTINGENCY LS 10% 6439.43 TOTAL 70833.68 BOND AMOUNT REQUIRED 70900.00