HomeMy WebLinkAboutWPO201900054 VSMP - SWPPP WPO VSMP 2019-09-2401 A
COUNTY OF ALBEMARLE
r „q
Department of Community Development
o w ����!
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Tel. (434) 296-5832 • Fax (434) 972-4126
IPGICSIP
Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: WAHS Site Improvements
WPO#
Address: 5941 Rockfish Gap Turnpike
Crozet, VA 22932
Prepared by:
Timmons Group
608 Preston Avenue, Suite 200
Charlottesville, VA 22903
434.295.8317
Prepared for:
Albemarle County School Board
401 McIntire Road
Charlottesville, VA 22902
Contact: Mr. Joseph P. Letteri
434-975-9340
SWPPP Preparation Date: September 23, 2019
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 1. Registration statement
WnwWe a, skwd c.ol I'll 1) ll e wd of 1,he
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY FOR OFFICE USE ONLY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM ID Number:
CONSTRUCTION ACTIVITIES (VAR10) Technical Criteria: 116 ❑ IIC ❑
REGISTRATION STATEMENT 2019
NEW ISSUANCE V RE -ISSUANCE ❑
MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑
Existing Permit Coverage Number (if applicable, VAR10####):
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section VI. (per Part III. K. of the VAR10 Permit).
Construction Activity
Operator Name:
Albemarle County School Board
Contact person:
Joseph P. Letteri
Address:
401 McIntire Road
City, State, Zip Code:
Charlottesville, VA 22902
Phone Number:
434-975-9340
Primary Email:
jletteri@kl 2albemarle.com
CC Email:
B. Billing Information
(leave blank if same as the Operator identified in Section I. A. above). This entity will receive
Annual Permit Maintenance
and Permit Modification Fee invoices (if applicable).
Name:
Contact Person:
Address:
City, State Zip Code:
Phone Number:
Primary Email:
CC Email:
C. May we transmit correspondence electronically? You must choose YES and include a valid email in order to pay by
credit card and to receive your permit coverage approval letter via email:
YES V NO ❑
Rev 04/2019 PAGE 1 1 7
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section II. Construction Activity Location Information. Project site information.
A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all water bodies receiving stormwater discharges from the site.
B. Construction Activity Name: WAHS Site Improvements
Address: 5941 Rockfish Gap Turnpike
City and/or County and Zip Code: Crozet, VA 22932
Latitude and Longitude
(6-digit, decimal degrees format): 38.046864,-78.707971
C. Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees): 5941 Rockfish Gap Turnpike
Section III. Offsite Support Activity Location Information. List all offsite support activities to be included under this
permit registration. Enter additional areas on a separate page. Offsite areas not included on this registration may need
to obtain coverage under a separate VPDES permit.
A. Offsite Activity Name: N/A
Address:
City and/or County and Zip Code:
Latitude and Longitude
(6-digit, decimal degrees format):
B. Offsite Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Section IV. Site Information.
A. Acreage totals for all land -disturbing activities to be included under this
permit coverage. Report to the nearest one -hundredth of an acre.
Total land area of development (including the entire
area to be disturbed as approved in the Stormwater
0.75
Management Plan):
Primary estimated area to be disturbed (portions with
0.75
Erosion and Sediment Control Plan approval only):
Offsite estimated area to be disturbed (if applicable):
N/A
C. Property Owner Status:
B. Estimated Project Dates
(M M/D D/YYYY)
Start date:
5/01 /2020
Completion date:
9/01 /2021
FEDERAL ❑ STATE ❑ PUBLIC VPRIVATE ❑
D. Nature of the Construction Activity Description (i.e.
commercial, industrial, residential, agricultural,
environmental): Fieldhouse and ADA Ramp
E. Municipal Separate Storm Sewer System (MS4)
name (if discharging to a MS4): N/A
Rev 04/2019 PAGE 2 17
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
F. Is this construction activity part of a common plan of development or sale? YES ❑ NO V
G. 6th Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Attach a separate list if needed.
HUC RECEIVING WATERBODY(S)
02080204 Rivanna
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration
Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared.
B. Has an Erosion and Sediment Control Plan been submitted to the VESCP Authority for review? YES VNO ❑
Erosion and Sediment Control Plan Approval Date (for estimated area to be disturbed).:
C. Has land disturbance has commenced? YES ❑ NO V
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity
Form. AS&S Entity Name (if different from the Operator identified in Section II. A.): N/A
SEE THE FOLLOWING PAGE FOR SIGNATURE
AND CERTIFICATION REQUIREMENTS AND INFORMATION
Rev 04/2019 PAGE 3 17
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section VI. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation, or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements, and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively, or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date:
Section VII. Submittal Instructions. Submit this form to the Virginia Stormwater Management Program (VSMP)
Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the
locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: i/SM6.P_A ut..h. r..!..i.e.s.
If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
o..IBs LciS p. InI 1P.� lrg). .::g
I he Local VSMP Authority onsert address below
Rev 04/2019 PAGE 4 17
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. The
following permit actions are covered by this form: new issuance, re -issuance, modification with an increase in acreage and plan modifications that
do not result in an increase in acreage.
Choose NEW ISSUANCE if this Registration Statement submittal is to obtain a new permit coverage, RE -ISSUANCE to renew an active, expiring
permit coverage or MODIFICATION to modify an active permit coverage When modifying permit coverage, indicate if the modification is increasing
the amount of acreage previous covered (MODIFICATION WITH ACREAGE INCREASE) or changing the site design with no increase in acreage
(MODIFICATION WITHOUT ACREAGE INCREASE).
Existing Permit Coverage Number. Provide the permit number for a modification or reissuance (i.e. VAR10####).
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over
construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with
a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party
with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project
site that are necessary to ensure compliance with the general permit). If an individual person is named as the operator, that person (or a
representative of) must sign the certification in Section VI. An operator can be one of the following:
9VAC25-870-10. Definitions.
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a
large or small construction activity, operator means any person associated with a construction project that meets either of the following two
criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those
plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance
with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct
workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context
of Stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
"Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities,
and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or
country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates,
charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other
wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of
state waters in contravention of § 62 1_-I�L5 of the Code of Virginia, the Act and this chapter.
"Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state,
governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity.
B. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they
are the same, leave this section blank.
C. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all
correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also allow the operator to pay by credit
card and receive permit coverage approval letters immediately upon approval.
Section II. Construction Activity Location Information. Location information related to the project site.
A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances
and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or
topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your Virginia
Stormwater Management Program (VSMP) authority if you have additional questions regarding site map requirements.
B. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the Stormwater plans), 911 street address (if
available), city/county of the construction activity, 6-digit latitude and longitude in decimal degrees format for the centroid, main construction
entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W).
C. Construction Activity Entrance Location. Provide an address or decimal degrees coordinates and a description of the main construction entrance
where the permit coverage letter will be posted.
Rev 04/2019 PAGE S 17
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
Section III. Offsite Support Activity Location Information.
This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards,
material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly
related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does
it serve multiple unrelated construction activities by different operators; (iii) the support activity does not operate beyond the completion of the
construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v)
appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all
applicable state, federal, and local approvals are obtained for the support activity.
If requesting permit coverage for offsite activities, please complete this section. List additional offsite areas to be included under this permit
coverage on a separate page. Offsite areas not included on this registration will need to obtain coverage under a separate VPDES permit.
A. Offsite activity location information. Provide a descriptive offsite project name, 911 street address (if available) and city/county of all off -site
support activities. Provide the 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N,-77.1234W). Please note that off -site activities not
covered under this permit may require separate permit coverage.
B. Offsite activity entrance location. Provide an address or decimal degrees coordinates and a description of the main construction entrance.
Section IV. Site Information.
A. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest
one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the
Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the
Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support
activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed
acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit
coverage (the sum of all on -site and off -site disturbed acreages).
B. Estimated Project Dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e.
07/30/2019).
C. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e.
federal, state or local governments) is PRIVATE.
D. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may
choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation,
Institutional, etc.). Describe the project (i.e. Commercial —one new office building and associated parking and utilities; Transportation — Roads,
sidewalks and utilities; Agricultural — 3 Poultry Houses, etc.).
E. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or
completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city,
county, institute or federal facility where the construction activity is located.
F. This construction activity is part of a common plan of development or sale. "Common plan of development or sale" means a contiguous area
where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-10. Definitions.
Le. a subdivision, commercial development, business park, etc.
G. 6t" Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6t" order HUCs and receiving waters for the site and
offsite areas that could potentially receive stormwater runoff discharging from this activity. The HUC can be either a 12-digit number (i.e.
0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving waters on a separate page. You may utilize DEC's web -
based GIS application, VEGIS, to obtain this information.
• VEGIS application link: f71.C)'.s.PF;,1;5„M,pp,i,rr,g„AL?,pV,i,catio,n.
• Instructions for utilizing DEQ's VEGIS application link: CA P; G,)a,,,,,,,HU..0 I .str j..ctica,ns,
Rev 04/2019 PAGE 6 17
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
Section V. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See
9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements.
B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section IV. A. has been submitted to the Virginia Erosion
and Sediment Control Program (VESCP) Authority for review and plan approval, choose YES. If you are submitting this application to reissue an
existing permit coverage, please provide the date that the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area
to be disturbed.
C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface
that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading,
excavating, or filling of land per §62.1-44.15:24. Definitions.
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form.
If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that
holds the approved annual standards & specification.
• AS&S Entity Form link: Annua,l_S;Land,arms,,;a,nd„5,pecifications„Entit.}...lInfo.irmation_ Form,
Section VI. Certification.
A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying
and signing the Registration Statement. A person must physically sign the certification, a typed signature is unacceptable. State statutes provide
for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be
signed as follows per 9VAC25-880-70 Part 111. K. 1.:
a. For a corporation: by a responsible corporate officer. For the purpose of this part, a responsible corporate officer means:
(iJ A president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who
performs similar policy -making or decision -making functions for the corporation, or
(ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with
environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather
complete and accurate information for permit application requirements, and where authority to sign documents has been assigned or
delegated to the manager in accordance with corporate procedures.
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part,
a principal executive officer of a public agency includes:
(iJ The chief executive officer of the agency, or
(ii) A senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency.
Section VII. Submittal Instructions.
Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority may be either DEQ or your locality
depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for
additional submittal instructions. A blank area is provided for the Local VSMP Authority to include their mailing address.
Who is the VSMP Authority for my oroiect? DEQ or the locality?
• Dom: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are:
➢ within a locality that is not a VSMP Authority;
➢ owned by the State or Federal government; or
➢ utilizing approved Annual Standards and Specifications.
• The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ
as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is
available on DEQ's website here: ),ocaJ V.`;i,MP A.. utJJ.o.rit,Y,,,list,
ICE. 'S.�Q S:�IRUCTIQN ENERALPEIRMITWEBSIITF.
htt www,.de ,.viiir.unia,, a Plro !Cairns U&latelr StoCmvvateirl@�lana emelnt VSIVtlPPerinuts ConstEggiionGeineirallPeirrnit.as ac
Ip....................................9............ g......................... �............. g ...................................................................................................................................................................................................................................................................................................................1P.......
Rev 04/2019 PAGE 7 17
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
Wu,wWe a, of Uw II III �:.�'�,Y �:ovcraoe Ileu,e ������wr� ,��' 1,aJip d,)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 3. Nature of activity
WV,wIl I a �Iel:al ed q"parra, d1l" e to 11„ a,,AJVlldles I'll tIe or ➢"' fir'1e",H^V a, I'll 'm,]`V II'llllre
a,��d segtileu v. Mn lluiide J-+auas�,',,)
This project includes the construction of a field house, ADA ramp, associated utilities, and site work.
The limits of disturbance are 0.75 acres.
These improvements are being made within the property boundary. The property is bounded by
residential properties and VA-250 Rockfish Gap Turnpike to the north. To the south, west, and east the
property is bounded by residential properties.
All construction shall take place in accordance with the Erosion and Sediment Control Sequence of
Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration
Statement.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
0 n)v I e a, ret I I'll c,et, L I I x 17 o f U w ]�a, ws 1, oI I a, I ud Sed I I'll eI I oI I u o �l P]� a, I I )o rekrreMT
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
STM30 12 S31ON _1MIIN00 IN3WI03S 12
SININIAOddWI IIIS SHVM
111. ISI SI 1 1
dnowo SNOWWII
HUE idol 5H
Ww! in , Hill M , 11 Hill 11 1 in H Wd 1 1
1 Hilo 'a
'q! NAH o
I In II flaw I I H v I mm il 1 1
1 2 lu Im"13
1 P. U11 Min,
�awKNMIIAHtWT
WnI1�1N1HH, UIIto
;1MaIW 11w 11 01
In WOI
naS 1p 51OSN-8
" I HNEHOWHW 1 10SMRwWo
U
mPaW"_ "Fq-OUH,pro _ I 1RE
1HS 1
15B-6
1 a a 1 1 loll
To.
E
M -
Ill oil
HUM
ego oar
will
20"M
Won
20HOMPUR man
n lamas
NOSH
ANNso
1 i HI n 111 1101
s e S-1IV130 12 S31ON -10b1NOJ 1N3WIO3S 12 NOISO'd
-
1�� 5 0e n ani4105 S1N3W3nObdWI 31IS SHVM
�0
0000
dnObJ SNOWWII
Ov.
ins
. < a U c~i
0
a ,
Pun
z
�c 6
oE a
mk
-'S
NH
-
W
g -1
I O
o
i
i I
t
w �
u.c c
_ LL
F
•O° o _
O
w
� e _� dWH21 �-T 3SVHd �0211N0� 1N3WI43S'3 NOIS0213
-
1��� n ani4105 S1N3W3nObdWI 31IS SHVM
dnowo S N 0 W W I I
W I II � � � mA'�uknrercnu
l Ill000000000000 ;1010
@p F
III �100
lu
I
�uun4
0
s e 3S10HOl3Id - T 3SHHd �Ob1NOJ 1N3WI03S Ta' NOIS0213
nm Imv�iae�r -
1��� n ani4105 S1N3W3nObdWI 31IS SHVM
dnowo S N 0 W W I I
dno E E
I III III
� III
II'' III00000(D0(1 0)
6"
e
W
roro �
W
a
/ ' J
1
f LL�
JY4m
'
1
I=
U
i)
dwv21 - Z ISVHd -10'tLN00IN3WICAS t NOISO213
SININIAOddHI IIIS SHVM
111. HSI— 1� I— N-
1-1 IA �Zl"""1111�I'l
I-d d n011 0 S N OW W 11
o.o
� s e� 3SlIOHOl3Id - Z 3SVHd �Ob1NOJ 1N3WI03S Ta' NOIS0213N Ju
S1NIZObdWI 31IS SHVM
«e,3. • . • dnowo SNOWWII
�I�I�'�� Ill000000000000
Section 5. Stormwater Management Plan
WnwWe a, redticvd I I x 17 of 1,he Ilal,esl, st,orn'rixaAer pIw�. II )o u�N,
1:1
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
NVld 1N3W3EJHNHW 2131HMW21O1S
M - vwA0 umnona�b IIS o
1 .dn�s3a Nos,3�
S1N3W3n02idWI 31IS SHb'M ="
o z=d 3 ..da3aed3n°= N. a=9, =.o,.;Ao4 a ou a3 3, dNo.,.,L •., • d n O b J SNOW W 11
0
¢ _
Z �
-
O z
O
.
�
J j
O
ro
.. . ......
l ,
1
.m
,f
\ \
.................�yP,i
,
Y \
{{{
0
d
w
O
Z
O
F
'""s'
�
s
_w&
Z
O
~
Z
_9W
4
O
p
I
=,mow
0
W
CL
O
O
J
J
>
W
W
r +�
'fle......
+►
.. .....
I.. 'i
O
J
a
... ...
a
r
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
Wu,tvWe a let II'll cvd I I x 17 of a s4e i ui Ixau:i���l� aIIII of loos k llll,i,x:i ,,, acl,:MdmM� ILi A.��dii,ii'�� are
iu°a Iked. Keel) dauiis 1,111) h) load x 4li s4e a, id
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
S1N3W3n021dWI IIIS SHVM
W,-All
........ . III I A dn owo SNOWW11
2�. S E
s e 3snOH413I1 - T 3SHHd NHId NOI1N3ADdd NoanllOd
- S1N3W3n021dWI 31IS SHVM
a
Eo6==d .3 .0 a oozE _.......E;eo9 •,• d n 0 m J S N O W W 11
GIs
IIIIIII000000000®00
�L
dNV'd - Z 3SVHd NVld NOIIN3A3dd N011llddOd
W,-All SIN] Z' ... O�'d�d� W I I I I S SHV/V\
1-1 IA
dnOlID SNOWWII
W I II III
III
3snOHCI-13Izl Z DSVHd NVId NOIIN3ADdd Noamiai
W,-All SININIAOddHI IIIS SHVM
1-1 IA
dnomoS N 0 W W I I
B. aources of Yollutants, locations, anU prevention practices
Pollutant, or Pollutant Location on site Prevention Practices,
Generating Activity Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and un-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clearing
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbent/oil dry for all paving
machines to limit leaks ands ills
Concrete washout shall occur in area
Direct concrete wash water into a leak -
Concrete washout and
adjacent to the construction entrance as
proof container or leak -proof settling basin
cement waste
designated on the Pollution Prevention
that is designed so that no overflows can
Plan.
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting, and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing com ounds.
Dewatering if necessary when
Water shall be filtered, settled or similarly
Dewatering operations
converting culvert inlet protection
treated prior to discharge as shown on
shown on plans
plan.
Designated areas for material delivery and
Material delivery and storage
Adjacent to construction entrance and
storage. Placed near construction
construction trailer.
entrances, away from waterways and
drainage paths
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Material use during building process
Building areas
Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
waterway. Containers have lids covered
before periods of rain, or are in a covered
Solid waste disposal
As provided by contractor
area. Scheduled collection to prevent
overfilling. MATERIALS NOT TO BE
BURIED ON -SITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash area is located at the construction
control as specified on plan. Minimize
Wash Waters
entrance. Adjacent diversion dike will
the discharge of pollutants from
divert wash water to sediment trap.
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
plan
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other
materials present on the site to precipitation and to stormwater.
g16 1)" a It4)II 'sh)➢ I'll ��II.��:-�V�i➢;� es h) 4x �';�"I, oI �Ioti f�7Cd �`^�eel) daVlls 1) aI1 i,ip do i; aw 'w�,�7Ud 4)gI0'011l Iq;'
. 1 "�
:IId c]a a�,IIoes a,IItI IIIs�°recA 6oII'� "._e �_ �_ii�, °��''�'���t�,_ ;r ���'j4� 4,� ;� A,dll,l�1 f,�➢., ex �i➢VV��. 1� ,1��➢"�,lq� .�d:�t➢VI'll 'w���:d p.
t :11 saVgir"t)e- s, �
D. Non-stormwater discharges
Discharge
Pollutants or Pollutant
Constituents
Location on Site
Dust control water
Sediment
As shown on plan
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Discharge Pollutants or Pollutant Location on Site
Constituents
E. Persons responsible for pollution prevention practices
Wu,tvWe lain u��w res wd c.4)Ma'c for aIIII persou ") respo��'sfl lle for pu"eveMopra'c��d:icvs as
above")
Mr. Joseph P. Letteri
401 McIntire Road
Charlottesville, VA 22902
434.975.9340
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement
chemical spill and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows;
Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage
trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter,
sand, saw dust, and plastic and metal trash containers.
All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of
discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash
containers for disposal.
Report all spills, leaks and discharges as follows;
WV,l"JWdda'ILlI p ➢ ` _r41q�1 w�d ➢ _r41➢Illlq�1
Reports will be made to the following:
Virginia Department of Emergency Management
Emergency Operations Center (EOC)
Phone: (800) 468-8892
Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800-424-8802.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
G. Pollution Prevention Awareness
y,��q .�� ➢]���r" d➢��II➢.�Ilq�;�^ ������ �r➢,���A�:4���A11➢�� day �r�.���;�",�11��4�����'w����➢4�q�4�,�,� ��q��:� � ��➢VI��°rllll��q��M,;;, �,�➢ ���I�II ➢VIi4����'A11➢4�,� Ilq� daVll�'
d,1Alffl'IeM, 'xa','4xash 'xaWl"')„ jNr""Jr"m,Jo, � O,c".,�
The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention
measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land
disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by
registered land disturber each time a new E&SC procedure is constructed.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 7. Discharges to impaired waters, surface waters within an applicable
TMDL wasteload allocation, and exceptional waters.
This site discharges to impaired waters as detailed on the following sheets.
Enhanced inspection frequency is required as outlined below:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business
days or (ii) at least once every five business days and no later than 48 hours following a
measurable storm event. In the event that a measurable storm event occurs when there are
more than 48 hours between business days, the inspection shall be conducted on the next
business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 8. Qualified personnel
The following personnel are responsible for inspections;
O:ln)vii eloosu�alre, M111I'll ben, aI. dlo�egtiiallfl'"edpeuso��O�������;��u���uai����;�diiu���
Mr. Joseph P. Letteri
401 McIntire Road
Charlottesville, VA 22902
434.975.9340
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 9. Signed Certification
Wu,tvii e Wc.ol�dino, 1:1to 91 �,u�,�� ,, V, 4� "� /4,.
m nor purposes opIlauu rev ex and approvals, d u s
should he the 4)�Ixner of the �,u,u�,ru..�I:mM,�, the sal ue sii;�'uu��ture as appears on the I,�unds and
appll ci a,::i�4)ns. .uum other 01)ffad„u c.a,uu he i de.�iiq�'u���ted on the ���]eo
_adii,;uu,ui �.Aaid u,uuird:� ,uuu �'i� to i,ulCl�,u��,;)
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted
is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
Owner/Operator Name
Company:
Title:
Signature:
Date:
Mr. Joseph P. Letteri
401 McIntire Road
Charlottesville, VA 22902
434.975.9340
Mr. Joseph Letteri
Albemarle Countv School Board
Director of Building Services
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
W v , , 's r,m 's dad 1�'7��^n llq�1'per I,Jo"� ➢4��r��rl's o to ➢V otfi1)" daV�,;; 'sto➢ I'll `w�,�� ter
V;�JII�.M; � V� °'�r�➢.�,�q��,?➢ t4 �ll�ll,�q�� w��ll� V���.A11� V,�➢1C�.M
po 1,116oII pur"veI1dloI1 1rlaII, .^' fort I'll a, 's Iwd de r"o,a, 6k u1 4)1, atildau,lui1s IIeedr"d.;�
Delegation of Authority
I, (name), hereby designate the person or specifically described position below
to be a duly authorized representative for the purpose of overseeing compliance with environmental
requirements, including the Construction General Permit, at the
construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans
and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set
forth in the Construction General Permit (CGP), and that the designee above meets the definition of a
"duly authorized representative".
Operator Name: Mr. Joseph P. Letteri
Company: Albemarle County School Board
Title:
Signature:
Date:
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 11. General permit copy
11,
Wnw�� I e a, 4) 1, 1,he gew1ral p en I'll I L, QN1,,\(-1'2',) 884
:1
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 12. Inspection logs
INSPECTION FREQUENCY:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at
least once every five business days and no later than 48 hours following a measurable storm event. In
the event that a measurable storm event occurs when there are more than 48 hours between business
days, the inspection shall be conducted on the next business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired
or for which a TMDL wasteload allocation has been established and approved prior to the term of this
general permit.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
>
`
ao E
N
�
C
Y
� N
N
N
Y v
«
a
N
v
v �
L
U O 30
J
v U Y
a
j �
C
>
�
OD N
-
\
O
Y �
N
> m
�
O
m
O
O- O
N
� N
Y 9
U1
Y Y
U1
C
Y o v
m
C
o
N
cOi
v
- E C
U1 O Y
-
J
J
C
OD U1
Y U
m
C
O -O
N
2 LL
LL
o
U V1
U1 U1
�
a�
�
a
s s
U1
v a
U N
L
Q
C
0 �
Y
E
m
�
O
C
C
a+
�
2
>2>
O N
�
-
�
U1 U1
ate+ ate+
y
N -
.3
C �
o
o
v a
v
2
_
C
C
O.
� Y
Y >
C
m `0
ui
0
z
U1
O `
W 0 N 2
U N E O O
VI C
Z v v
W O 3 U
F E
° UJo
w
O m v ou
O
m Z
F `D
Y O
O
vJi
Z o 9
W
E
a
OU -Jp o N -
3 N
z `D s
= Z
v v
K Qcc
W = w
Z F
O
Z C p O C
R O r
Y
Z O= -u -O
Z W Z
O
,n fl- E �
OC Q
d C G OC
O °1 O E m
W v LL -
O
C p O
a y
y � �
O O
T
N
O
d Z
C >
a
O
0
a
E c
c a
m
a �
O
L
T
V
Y £ O
Y O i+
� � C
d £ C
m a a m E
§ c
a a0+
M 3 N
Cd
� a0+
O .O io
� w
a -
2 E m E
a0+ d C
� d
W \
N aS
E T
9 E c
y � a
d 'N
V
9 O u
3
0 4
S I O
O c
C
L
O
a
c 'a
� O
aH
3
H
'6
H
m
n
0
U
,a.
a �
� O
Y �
� •C
i0 —
�w
H O
>
`
ao E
N
�
C
Y
� N
N
N
Y v
«
a
N
v
v �
L
U O 30
J
v U Y
a
j �
C
>
�
OD N
-
\
O
Y �
N
> m
�
O
m
O
O- O
N
� N
Y 9
U1
Y Y
U1
C
Y o v
m
C
o
N
cOi
v
- E C
U1 O Y
-
J
J
C
OD U1
Y U
m
C
O -O
N
2 LL
LL
o
U V1
U1 U1
�
a�
�
a
s s
U1
v a
U N
L
Q
C
0 �
Y
E
m
�
O
C
C
a+
�
2
>2>
O N
�
-
�
U1 U1
ate+ ate+
y
N -
.3
C �
o
o
v a
v
2
_
C
C
O.
� Y
Y >
C
m `0
ui
0
z
U1
O `
W 0 N 2
U N E O O
VI C
Z v v
W O 3 U
F E
° UJo
w
O m v ou
O
m Z
F `D
Y O
O
vJi
Z o 9
W
E
a
OU -Jp o N -
3 N
z `D s
= Z
v v
K Qcc
W = w
Z F
O
Z C p O C
R O r
Y
Z O= -u -O
Z W Z
O
,n fl- E �
OC Q
d C G OC
O °1 O E m
W v LL -
O
C p O
a y
y � �
O O
T
N
O
d Z
C >
a
O
0
a
E c
c a
m
a �
O
L
T
V
Y £ O
Y O i+
� � C
d £ C
m a a m E
§ c
a a0+
M 3 N
Cd
� a0+
O .O io
� w
a -
2 E m E
a0+ d C
� d
W \
N aS
E T
9 E c
y � a
d 'N
V
9 O u
3
0 4
S I O
O c
C
L
O
a
c 'a
� O
aH
3
H
'6
H
m
n
0
U
,a.
a �
� O
Y �
� •C
i0 —
�w
H O
>
`
ao E
N
�
C
Y
� N
N
N
Y v
«
a
N
v
v �
L
U O 30
J
v U Y
a
j �
C
>
�
OD N
-
\
O
Y �
N
> m
�
O
m
O
O- O
N
� N
Y 9
U1
Y Y
U1
C
Y o v
m
C
o
N
cOi
v
- E C
U1 O Y
-
J
J
C
OD U1
Y U
m
C
O -O
N
2 LL
LL
o
U V1
U1 U1
�
a�
�
a
s s
U1
v a
U N
L
Q
C
0 �
Y
E
m
�
O
C
C
a+
�
2
>2>
O N
�
-
�
U1 U1
ate+ ate+
y
N -
.3
C �
o
o
v a
v
2
_
C
C
O.
� Y
Y >
C
m `0
ui
0
z
U1
O `
W 0 N 2
U N E O O
VI C
Z v v
W O 3 U
F E
° UJo
w
O m v ou
O
m Z
F `D
Y O
O
vJi
Z o 9
W
E
a
OU -Jp o N -
3 N
z `D s
= Z
v v
K Qcc
W = w
Z F
O
Z C p O C
R O r
Y
Z O= -u -O
Z W Z
O
,n fl- E �
OC Q
d C G OC
O °1 O E m
W v LL -
O
C p O
a y
y � �
O O
T
N
O
d Z
C >
a
O
0
a
E c
c a
m
a �
O
L
T
V
Y £ O
Y O i+
� � C
d £ C
m a a m E
§ c
a a0+
M 3 N
Cd
� a0+
O .O io
� w
a -
2 E m E
a0+ d C
� d
W \
N aS
E T
9 E c
y � a
d 'N
V
9 O u
3
0 4
S I O
O c
C
L
O
a
c 'a
� O
aH
3
H
'6
H
m
n
0
U
,a.
a �
� O
Y �
� •C
i0 —
�w
H O