Loading...
HomeMy WebLinkAboutWPO201500095 Bond Release 2019-07-11 Carla Harris - CDD From: Ana Kilmer Sent: Thursday,July 11, 2019 1:07 PM To: Carla Harris - CDD; Frank Pohl Subject: WPO-2015-00095 Fairhill Estates Bond has been released. Per my notes,Jennifer recorded the agreement. I don't have a copy of the recorded agreement in the bond file and I don't see it in CV. / Ana D. Kilmer Management Analyst II County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org i Ov COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: ft��// /z0 L� PLAN/PERMIT NO.: fr./ea Z0/5 CcZ;g5 DATE: / 7 FTW • This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all re-inspection and annual maintenance fees invoiced have been paid. Erosion Control Inspector DEQ Termination Date 6''g'!°r or N/A • Community Development Department All fees invoiced on the above project have been c ected.. Ala_7f Dire r of Community Developm unty Engine 06 /zq/f f _ Date E • Cc: Ana Kilmer Revised:07/03/2018 • Aoy ,ram COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: (c'f(,)/// E5`i7f PLAN/PERMIT No.: ��d 9/J ' 0009 DATE: / 7 (T , This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re-inspection and annual maintenance fees invoiced have been paid. Date As-built plan was approved by Engineering Division: or e DEQ Termination Date or N/A Engineering Reviewer Community Development Department All fees invoiced on the above project have been co cted. V ( � Directo of Community Develop ounty Engine° 22b/7-7/9 Date Cc: Ana Kilmer Revised:07/03/2018 Mark Hopkins From: Matthew Wentland Sent: Monday,June 17, 2019 9:24 AM To: Mark Hopkins Subject: Fairhill VSMP Mark, The ditches are the only SWM portion of the bond and are good.They can be dropped to the minimum 20%or released depending on the ESC portion. Matt Wentland, PE Civil Engineer II 1