Loading...
HomeMy WebLinkAboutFDP201900003 Review Comments Floodplain Development Permit 2019-06-05 -41Pr ANHOLD ASSOCIATES LANDSCAPE ARCHITECTURE June 5, 2019 URBAN DESIGN Mr. Frank Pohl PLANNING County Engineer County of Albemarle McIntire Office Building Campus 8311 ROCKFISH GAP TPKE Re: FDP201900003 Boat Launch Safety Improvements, Resubmission for final review and approval GREENWOOD,VA 22943 434 882 3420 Attached for review and approval,please find: ANHOLDLA.COM ■ Four signed/sealed copies of the plans In response to your comment received, we offer the following: 1. Add the following notes (or something similar): o Contractor shall not excavate the gabion trench in excess of that which can be stabilized at the end of each work day. Stabilization of the trench means installation of the geotextile and the full depth of gabion stone. o Gabion stone shall be uncontaminated. o The contractor shall remove from the site all excavated soils, rocks and other disturbed, removed or displaced material. No material shall be allowed to enter the reservoir. o Storage of fuel or other contaminants are not allowed on this site. o Refueling must occur outside of the floodplain limits and measures taken to prevent spills. o All equipment and materials not installed must be removed from the 100-yr floodplain limits if heavy rains are forecast. <<<<(Not sure how to say this,please wordsmith as needed).>>>> RESPONSE:The above notes have been included. 2. Add to the description(page 2 of the FDP application) that the gabion riprap is being installed as an environmental restoration measure to correct persistent erosion of the pavement side slope. Also state 2 benches are being installed for recreational purposes. RESPONSE:The above description has been included. ANHOLD ASSOCIATES Page 2 3. Show on the drawings the limits of disturbance and provide the area of land disturbance. I assume this will include the area of gabion and it is below 10,000 sf, but this needs to be confirmed on the plan. RESPONSE: Limits of disturbance and area of land disturbance has been included. 4. Cross out the wood post and CRT post as shown on the guardrail detail (I see you called out for steel posts,just want to make sure). RESPONSE: Wood post and CRT post have been crossed out. 5. Submit 4 signed/sealed copies of the plans. If you don't have a seal, sign it at least. RESPONSE: Done. 6. Include the FDP number listed below on the application and add it to the plans. RESPONSE: Done.