Re: SDP201900026
Final Site Plan - 2'd Review Response
Brookhill - Block 8A - Senior Living
Facility
2571 Seminole Trail
Charlottesville, VA 22902
Albemarle County
BE #V 182023
Bohler Engineering is pleased to submit on behalf of CA Senior Living Holdings, LLC, the Final Site
Plan 3'd Submission for the Block 8A Senor Living Facility. The following is our comment response
letter addressing comments received from various departments. Each comment is addressed and
responded to as follows:
Albemarle County Delpartment of Community Develo ment -- Megan Nedostuip. Princi al Planner
Comment 11: [32.5.2b] The special exception, for density will need to be approved prior to the approval
of the final site plan.
Rev]: Comment outstanding. Additional information that was requested for special
exception has not been provided to date from Collins Engineering,
Response I: Comment acknowledged.
Comment 2: [32.5.2a] [COD 2.3.2.3] The proposed front setback exceeds the 25' front setback
maximum as indicated in the Code of Development. While the plan was revised since the
initial site plan to move the building closer to the street, it still does not meet the required
setback. A justification will need to be provided to modify this requirement from the
COD.
Rev]: Comment outstanding. Justification will need to be submitted and reviewed with
nest submittal.
Response 2: A setback justification letter has been provided with this submission.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS - LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
BO H L B R Megan Nedostup
E N G t N E E R I N G _
$rookl�ill -Block 8A Senior living Facility
Final Site Plan — 2°d Review Comments
September 4, 2019
Page 2 of 3
Comment 4: [32.5.2p] [32.7.9] Additional screening is needed for the parking area, as it is not fully
screened from, the street. In addition, please move the screening shrubs from the bottom
of the hill (currently at the property line) to be adjacent to the
pavement/parking/travelways. See below:
Rev1: Comment partially addressed. Additional landscaping is needed in the lower left
hand corner of'the above photo. This parking area will be seen from the public road and
needs to be screened.
Response 4: The shrubs screening the parking lot have been adjusted per the image provided
and additional shrubs have been added to the Northeast corner of the parking lot;
Please see sheet C-701.
Comment 6: [32.5.2i] All easements need to be platted and approved prior to final site plan approval,
including off -site improvements. Deeds may be required for off -site improvements to
ensure maintenance.
Rev]: Comment outstanding. Easement plat has not been submitted to date.
Response 6: Acknowledged. The plat is currently being coordinated to be submitted next week.
Temporary grading work is intended to be handled between property owners
during construction without recordation of grading easement.
Comment 7: [Proffer #4] Affordable housing of 15% needs to be provided for the 87 units that count
towards density.
Rev]: Comment outstanding. Affordable housing needs to be provided.
Response 7: Acknowledged. Affordable housing options are currently being discussed with the
applicant and master developer.
Engineering — Emily Cox
Comment 1: WP0201900004 must be approved before final site plan can be approved.
Rev. 1: Comment not addressed.
Response 1: Acknowledged.
Comment 3: [Sheet C-201 ] Show deed book & page for all existing easements, this includes the SWM
Facility easement.
Rev. 1: Comment not addressed.
Response 3: Acknowledged. All recorded easements have been shown with deed book and page
number.
Comment 5: Signed and sealed engineered designs for retaining walls will be necessary before plan
approval.
Rev. 1: Comment not addressed.
Response 5: Acknowledged. Wall design is currently underway.
Comment 7: [Sheet C-301 ] Provide enough dimensions or an exhibit/detail to show compliance with
angled parking and travelways per County Code 18-4.12.16 and Page 16 of the
Engineering Design Standards Manual(Section 7- C.2).
Rev. 1: Partially addressed. Ensure all dimensions and angles are shown.
Response 7: More dimensions have been added to show compliance with county code; Please see
sheet C-301.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS ■ LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
BOH LER
E N G I N E E R I N G
Megan Nedostup
Brookhill - Block 8A — Senior Living Facility
Final Site Plan — 2id Review Comments
September 4, 2019
Page 3 of 3
Comment 10: Provide note on landscaping plan regarding 2:1 slopes. They shall be stabilized with steep
slope grass or some other stabilized ground cover.
Rev. 1: Crown Vetch is invasive and is not recommended. Please revise note.
Response 10: The slope stabilization note has been updated to remove Crown Vetch. Creeping
liriope (Liriope Spicate) has been proposed; Please see sheet C-702.
Architectural Review Board — Heather McMahon
Comment 1: Provide a detail of the proposed dumpster enclosure in the site plan set.
Response 1: Detail for dumpster enclosure can be found on sheet C-900.
Comment 2: Ensure that spillover into the public right-of-way at the northeast corner of the site does
not exceed half (0.5) of a footcandle.
Response 2: Lighting design revised to ensure spillover does not exceed maximum. See Sheet C-
801.
Comment 3: Show all wail -mounted lights on the architectural elevations and account for them in the
lighting plan (C-801) of the site plan set.
Response 3: The lighting plan has been revised as requested. See Sheet C-801.
Comment 4: Provide the finish color of the proposed poles on the cut sheets provided on C-802.
Response 4: The finish color of the proposed poles has been added. See Sheet C-802.
Comment 5: Shift the one willow oak on the north property line, east of the 5 proposed parking spaces,
so that its center does not fall within the 20' sanitary sewer easement.
Response 5: Willow Oak has been relocated to the southwest side of the building; Please see sheet
C-701.
Comment 6: Ensure that there are no conflicts between the proposed placement of large shade trees
and freestanding lights.
Response 6: Conflicts have been eliminated. See Sheet C-701.
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at (540) 349-4500.
Sincerely,
Bohler Engineering VA, LLC
?ow 6r
ffZr
Ryan Yauger, P.E.
RY/jblbb
H:118,V 182023,Administrative,Letters,190904 Final Site Plan - 2nd Review CRLdoc
CIVIL AND CONSULTING ENGINEERS - PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
'm
BOHLER
E N G I N E E II I N G
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn.- Megan Nedostup, AICP
Dear Ms. Nedostup:
28 Blackwell Park Lane, Suite 201
Warrenton, VA 20186
PHONE 540.349.4500
September 4, 2019
Via Electronic Mail
Re: Setback Justification
Brookhill Block 8A - Senior Living
Facility
2571 Seminole Trail
Charlottesville, VA 22902
Albemarle County
BE # V 182023
The Client is requesting a setback adjustment to the above referenced project. The building is located
farther back from the road and has increased setback due to the necessity of emergency and delivery
vehicle access and circulation, in addition to the flat building pad elevation needed for construction and
the decreasing road grades along Stella Lane.
Should you have any questions regarding this letter or require additional information, please do not
hesitate to contact me at (540) 349-4500.
Sincerely,
Bohler Engineering VA, LLC
Ryan Yauger, P.E.
RYlbb
H:1181V 1820231Administrative\Letters1190904 Setback Justification L.etter.doc
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
B OHLER ENGINEERING
28 Blackwell Park Lane, Suite 201, Warrenton, VA 20186
Professional Engineering Services Telephone: (540) 349-4500 Fax: (540) 349-0321
VIA: Federal Express
TO: Albemarle County
Planning Department
401 McIntire Road
Charlottesville, VA
(434) 296-5832
ATTN: Megan Nedostup
LETTER OF TRANSMITTAL
RE: SDP2019-026
Final Site Plan 30 Submission
Brookhill — Block. 8A- Senior Living Facility
2571 Seminole Trail
Charlottesville, VA 22902
Albemarle County
DATE: September 4, 201.9
JOB NO: V 182023
WE ARE SENDING YOU ❑ Shop drawings ❑ Copy of letter ®Attached ❑ Prints ❑ Change order
COPIES dOB#
1 V182023
10 V182023
10 V182023
These Are Transmitted:
REMARKS:
DATE REVISION REVISION SHEET NO.
DATE
9/4/19 1 of 1
9/4/19 1-3 of 3
513119 2 8/29/19 1-27 of 27
❑ For approval [—]For your use
® For review and comment ❑Approved as submitted
❑ Returned for corrections
DESCRIPTION
Justification Letter
Comment Response Letter
Brookhill Final Site Plan Block 8A
Senior Living Facility
❑As requested
❑Approved as noted
Enclosed please find the above mentioned items for the Brookhill — Block 8A — Senior Living Facility project in
Charlottesville, Virginia.
Should you have any questions or require additional information, please do not hesitate to contact this office at
(540) 3494500.
RECEIVED
SEP 4 5 ?n'q
COMMUNITY
DEVELOPMEt�fT
COPY TO: SIGNED:
/V ar
Ryan Yauger, P.E.