Loading...
HomeMy WebLinkAboutARB201800152 Review Comments 2018-12-26 Margaret Maliszewski From: John D. Borgie <JBorgie@deltaairport.com> Sent: Wednesday, December 26, 2018 10:33 AM To: Margaret Maliszewski Subject: Re:ARB review of parking lot and apron expansion Good morning Margaret, Please allow this email as a confirmation that we will be submitting revised plans and a summary letter to address the comments below. Our expected date of resubmittal will be in middle January. We have yet to receive additional comments from the site plan. If those comments are received soon, a joint resubmittal is planned. John Borgie, PE Delta Airport Consultants Office:(804)275-8301 Sent via mobile Device From: Margaret Maliszewski<MMaliszewski@albemarle.org> Sent:Tuesday, December 11, 2018 10:42 AM To:John D. Borgie<JBorgie@deltaairport.com> Subject:ARB review of parking lot and apron expansion John, I've reviewed your ARB application for the parking lot and apron expansion. The following revisions are required to make the proposal consistent with Entrance Corridor design criteria: 1. Revise the lighting plan using an LLF of 1.0 to calculate the photometrics. 2. Revise the lighting plan so that light levels at the ground do not exceed 20 fc. 3. Revise the lighting plan to show that the height of parking lot pole lights does not exceed 20' including the bases. 4. Include the apron light fixtures in the lighting schedule. 5. Revise the lighting plan to show that the apron fixtures will not be tilted and will remain in a horizontal position. 6. Add the standard lighting note to the plans: Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting 1 from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle. 7. The west side of the new parking lot is short 2 perimeter trees. If existing trees to remain are intended to meet perimeter tree requirements, show the individual trees that will remain and note their size and species. Otherwise, provide 2 additional trees on the west side of the lot. 8. Coordinate the quantity of FG (fothergilla) drawn on the plan(20) with the quantity listed in the plant schedule (11). Within 15 days of the date of this letter,please send me a letter(by email is acceptable) indicating whether you will or will not proceed with these revisions. If you choose not to proceed with these revisions, staff will be unable to approve your application. If you choose to proceed with the revisions,please forward me one set of revised drawings together with a memo summarizing the revisions you've made and the attached Resubmittal Form. Your decision to make the revisions will suspend the 60-day review period associated with your original submittal. However, I expect to complete the review of your revised proposal within 2 weeks of your re- submittal. If you have any questions about this action,please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. (Note that these comments are associated with the ARB/Entrance Corridor review; you should expect separate comments from Planning and other review agencies on your Site Development Plan Amendment application.) Thank you. Margaret Maliszewski Chief of Planning/Resource Management Albemarle County Department of Community Development 401 McIntire Road Charlottesville, VA 22902 434-296-5832 x3276 mmaliszewski@albemarle.org 2